Back to kitchen remodel contractors
A G D Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2017 to Jan 2026
- Last 24 months
- 7 permits filed
20 permits since 2000: 16 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 5 completed, 1 in progress, 1 never finaled. Typically 14 days from filing to permit and 184 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 13, 2026 | Completed final sign-off Jun 2026 | 129 Saturn St | kitchen remodel including wall removal and new beams within unit 129 of the existing duplex residence.Details
kitchen remodel including wall removal and new beams within unit 129 of the existing duplex residence. | $30,000 |
| Jul 22, 2025 | In progress issued Aug 2025 | 1279 Dolores St | unit 1279: kitchen & bath remodel. relocate toilet, sink, tub combo, reconfigure kitchen, remove/ relocate walls in bedroom, kitchen & bathroom. remove e) fire place.Details
unit 1279: kitchen & bath remodel. relocate toilet, sink, tub combo, reconfigure kitchen, remove/ relocate walls in bedroom, kitchen & bathroom. remove e) fire place. | $70,000 |
| Jul 9, 2025 | Completed final sign-off Jan 2026 | 161 Dolores St | unit 2: kitchen remodel, relocate sink & stove, replace kitchen window.Details
unit 2: kitchen remodel, relocate sink & stove, replace kitchen window. | $40,000 |
| Sep 3, 2024 | Completed final sign-off Aug 2025 | 1279 Dolores St | (n) bedroom ; kitchen & bathroom remodel. replace existing non-operational furnace with mini-split.Details
(n) bedroom ; kitchen & bathroom remodel. replace existing non-operational furnace with mini-split. | $50,000 |
| Apr 28, 2022 | Never finaled issued Apr 2022, no final | 319 Prentiss St | demo (e) partitions in bedroom, kitchen & dining room, millwork in pantry & kitchen, plumbing fixtures in bathroom & kitchen, light fixtures throughout. install (n) partitions in dining room & bedrm. (n) light fixtures & outlets. (n) cabinetry & appliances & hood in kitchen. bathroom remodel in-kindDetails
demo (e) partitions in bedroom, kitchen & dining room, millwork in pantry & kitchen, plumbing fixtures in bathroom & kitchen, light fixtures throughout. install (n) partitions in dining room & bedrm. (n) light fixtures & outlets. (n) cabinetry & appliances & hood in kitchen. bathroom remodel in-kind | $51,000 |
| Oct 7, 2021 | Completed final sign-off Dec 2021 | 855 Filbert St | in kind bathroom remodel, kitchen counter top replacement. no wall or floor plan change.Details
in kind bathroom remodel, kitchen counter top replacement. no wall or floor plan change. | $10,000 |
| Feb 9, 2018 | Completed final sign-off Sep 2025 | 84 Harrington St | interior remodel of (e) 2-story residence. (n) baths & bedrooms @1st flr. (n) renovated kitchen, bathrm & finishes @2nd flr & proposed 3rd flr addition. (n) windows & exit doors @2nd & 3rd flrs @rear of house. (n) stucco coat. rear exit stair relocated.Details
interior remodel of (e) 2-story residence. (n) baths & bedrooms @1st flr. (n) renovated kitchen, bathrm & finishes @2nd flr & proposed 3rd flr addition. (n) windows & exit doors @2nd & 3rd flrs @rear of house. (n) stucco coat. rear exit stair relocated. | $175,000 |