Back to kitchen remodel contractors
A D Construction
- Based in
- Hercules
- On San Francisco permits
- May 2003 to May 2016
- Last 24 months
- 0 permits filed
7 permits since 2000: 5 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 expired or cancelled. Typically 42 days from filing to permit and 557 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2008 | Expired or cancelled expired Jun 2010 | 552 Waller St | legallize kitchen and bath remodel work, sheetrock replacement in the bedrooms, electrical and plumbing work done without bldg permit to comply with nov# 200861735. replace kitchen cabinet, fixtures. also on bathroom vanity & w.c.Details
legallize kitchen and bath remodel work, sheetrock replacement in the bedrooms, electrical and plumbing work done without bldg permit to comply with nov# 200861735. replace kitchen cabinet, fixtures. also on bathroom vanity & w.c. | $50,000 |
| May 2, 2003 | Completed final sign-off Jan 2005 | 417 Precita Av | repair of existing residence, bedrooms, kitchen, bathrooms, and others, due to fire damagedDetails
repair of existing residence, bedrooms, kitchen, bathrooms, and others, due to fire damaged | $20,000 |