Back to kitchen remodel contractors
A Barrios General Building Contrctor Pai
- Based in
- Redwood City
- On San Francisco permits
- Nov 2008 to Apr 2019
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 127 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 22, 2019 | Completed final sign-off Aug 2019 | 1201 California St | unit 904:new gfci outlets. relocate gas line. remodel 1 kitchen & 1 bathroom. kitchen:install new cabinets, new countertops, new sink, new faucet, garbage disposal.p trap new appliances & new tile floor & backsplash. bath: install new tub, new tiles on wall & floor, new valves, new sink, new toilet.Details
unit 904:new gfci outlets. relocate gas line. remodel 1 kitchen & 1 bathroom. kitchen:install new cabinets, new countertops, new sink, new faucet, garbage disposal.p trap new appliances & new tile floor & backsplash. bath: install new tub, new tiles on wall & floor, new valves, new sink, new toilet. | $40,000 |