Back to kitchen remodel contractors
A B C Window Contractors
- Based in
- Vacaville
- On San Francisco permits
- Jan 2000 to Nov 2018
- Last 24 months
- 0 permits filed
2,512 permits since 2000: 1,225 completed, 627 never finaled, 660 expired or cancelled.
Of the 627 never-finaled permits, 5 are 5 to 10 years old, 622 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 103 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 11, 2007 | Completed final sign-off Jan 2008 | 2510 17th Av | window replacement: remove and replace in same openings premium white vinyl double pane windows in the following configuration: 2 single hung in din wm/sliding window in kitchen, 5 single hung in living room, 3 small picture windows in living room, 1 single hung in basement. u=<.67.Details
window replacement: remove and replace in same openings premium white vinyl double pane windows in the following configuration: 2 single hung in din wm/sliding window in kitchen, 5 single hung in living room, 3 small picture windows in living room, 1 single hung in basement. u=<.67. | $4,400 |