A & A General Building Construction Inc

Contractor license
1033938
State license record
Based in
Daly City
On San Francisco permits
Feb 2018 to Jun 2022
Last 24 months
0 permits filed

4 permits since 2000: 3 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is 5 to 10 years old. 1 was filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Kitchen remodel permits

AllDeck 1Stairs 1Kitchen remodel 3Bathroom remodel 3

3 kitchen remodel permits: 2 completed, 1 never finaled. Typically 349 days from filing to permit and 1113 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jun 15, 2022Completed
final sign-off Nov 2022
638 45th Avapt 1: to comply with nov#202291769. replacing cabinets at 1st floor. replacing tiles at bathroom at the same floor. no change of floor plans. remodel kitchen & bathroom.
Details
Permit
202206156397
Status
complete
Filed
Jun 15, 2022
Permit issued
Jun 15, 2022
Final sign-off
Nov 23, 2022
Declared cost
$20,000
Address
638 45th Av

apt 1: to comply with nov#202291769. replacing cabinets at 1st floor. replacing tiles at bathroom at the same floor. no change of floor plans. remodel kitchen & bathroom.

Open the permit page

$20,000
Dec 11, 2019Never finaled
filed Dec 2019, never issued
3121 Santiago Stlegalize unit, kitchen, add bedroom, half bath and deck on second floor per ordinance 43-14.**not qualified for fee waiver per ord# 146-15**
Details
Permit
201912119215
Status
filed
Filed
Dec 11, 2019
Declared cost
$60,000
Address
3121 Santiago St

legalize unit, kitchen, add bedroom, half bath and deck on second floor per ordinance 43-14.**not qualified for fee waiver per ord# 146-15**

Open the permit page

$60,000
Feb 9, 2018Completed
final sign-off Sep 2025
84 Harrington Stinterior remodel of (e) 2-story residence. (n) baths & bedrooms @1st flr. (n) renovated kitchen, bathrm & finishes @2nd flr & proposed 3rd flr addition. (n) windows & exit doors @2nd & 3rd flrs @rear of house. (n) stucco coat. rear exit stair relocated.
Details
Permit
201802090879
Status
complete
Filed
Feb 9, 2018
Permit issued
Jan 8, 2020
Final sign-off
Sep 3, 2025
Declared cost
$175,000
Address
84 Harrington St

interior remodel of (e) 2-story residence. (n) baths & bedrooms @1st flr. (n) renovated kitchen, bathrm & finishes @2nd flr & proposed 3rd flr addition. (n) windows & exit doors @2nd & 3rd flrs @rear of house. (n) stucco coat. rear exit stair relocated.

Open the permit page

$175,000