Back to kitchen remodel contractors
7x7 Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2018 to Sep 2026
- Last 24 months
- 6 permits filed
25 permits since 2000: 13 completed, 7 in progress, 5 never finaled.
Of the 5 never-finaled permits, 4 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 2 completed, 2 in progress. Typically 70 days from filing to permit and 234 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 19, 2024 | In progress issued Sep 2024 | 55 Lundys Ln | excavate non hab basement/convert to new hab space.reconfig e 1st fl. new kitchen, poweder room, interior stair, sercies,fixtures, finishes through.new ex glasing in new modified openings. n skylights,fire rated parapet walls,repair or add new retaining walls,step at yards.Details
excavate non hab basement/convert to new hab space.reconfig e 1st fl. new kitchen, poweder room, interior stair, sercies,fixtures, finishes through.new ex glasing in new modified openings. n skylights,fire rated parapet walls,repair or add new retaining walls,step at yards. | $432,029 |
| Jul 12, 2023 | In progress issued Jan 2024 | 99 Uranus Tr | 1st flr: remodel (unit 2) bathroom, bedroom, kitchen remodel. remodel interior stair connection to garage from unit (unit 1). 2/f: remodel kitchen, skylight, and bedroom. new and replacement windows, doors, skylight. new plus replacement exterior windows and doors.Details
1st flr: remodel (unit 2) bathroom, bedroom, kitchen remodel. remodel interior stair connection to garage from unit (unit 1). 2/f: remodel kitchen, skylight, and bedroom. new and replacement windows, doors, skylight. new plus replacement exterior windows and doors. | $145,000 |
| Jan 7, 2022 | Completed final sign-off Feb 2023 | 1900 Laguna St | remove load bearing wall between kitchen and bedroom and bedroom. replace two windows with sliding door.Details
remove load bearing wall between kitchen and bedroom and bedroom. replace two windows with sliding door. | $20,000 |
| Jul 6, 2021 | Completed final sign-off Jan 2022 | 1116 Stanyan St | remodel (e) kitchen and bathroom. remove load bering wall between ktichen and dining room.Details
remodel (e) kitchen and bathroom. remove load bering wall between ktichen and dining room. | $45,000 |