Back to kitchen remodel contractors
360 Construction Co
- Based in
- San Jose
- On San Francisco permits
- Jan 2013 to Mar 2013
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 528 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 15, 2013 | Completed final sign-off Jun 2014 | 575 34th Av | remodel (2) kitchens and (4) bathrooms (change lighting , change new plumbing fixtures new tile floor, counter tops, wall panels, hardwood floor. painting, replace interior door new cabinets, no structural work. replace 2 hood exhaust, replace 2 gas insert fireplace.Details
remodel (2) kitchens and (4) bathrooms (change lighting , change new plumbing fixtures new tile floor, counter tops, wall panels, hardwood floor. painting, replace interior door new cabinets, no structural work. replace 2 hood exhaust, replace 2 gas insert fireplace. | $130,000 |