Back to kitchen remodel contractors
328 Construction
- Based in
- Daly City
- On San Francisco permits
- Jun 2007 to Jul 2026
- Last 24 months
- 4 permits filed
43 permits since 2000: 35 completed, 4 in progress, 4 never finaled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 11 completed, 1 in progress. Typically 10 days from filing to permit and 161 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 11, 2025 | In progress issued Jan 2026 | 1747 Buchanan St | ref ti permit 202410163077. restaurant tenant improvement (mep), type 1 kitchen hood.Details
ref ti permit 202410163077. restaurant tenant improvement (mep), type 1 kitchen hood. | $50,000 |
| Dec 2, 2022 | Completed final sign-off May 2023 | 1487 19th Av | g/f add new half bath; 2/f remodel (e) kitchen & bathroom; add (1) new skylightDetails
g/f add new half bath; 2/f remodel (e) kitchen & bathroom; add (1) new skylight | $20,000 |
| Nov 13, 2018 | Completed final sign-off Sep 2019 | 4069 26th St | 1st flr - remodel kitchen and bath, add 1 full bath. 2nd flr - remodel kitchen and bath, add 1 full bathDetails
1st flr - remodel kitchen and bath, add 1 full bath. 2nd flr - remodel kitchen and bath, add 1 full bath | $75,000 |
| Sep 18, 2018 | Completed final sign-off Dec 2018 | 601 Grant Av | mech and elec ti - replace (e) hvac system with new heat pumo, fan coil & ductwork for dining area only. install new lighting per plan for kitchen and dining areas. t-24 forms. existing hood. 1 new duct detector. ref #201804186647. fire under separate permit(s).Details
mech and elec ti - replace (e) hvac system with new heat pumo, fan coil & ductwork for dining area only. install new lighting per plan for kitchen and dining areas. t-24 forms. existing hood. 1 new duct detector. ref #201804186647. fire under separate permit(s). | $40,000 |
| Apr 18, 2018 | Completed final sign-off Dec 2018 | 601 Grant Av | change restaurant ownership. remodel e fast food restaurant work included modify e restroom, kitchen, dining, storage, with new tea station. tenant improvement. electrical/mechanical under seperate permitsDetails
change restaurant ownership. remodel e fast food restaurant work included modify e restroom, kitchen, dining, storage, with new tea station. tenant improvement. electrical/mechanical under seperate permits | $120,000 |
| Jan 20, 2016 | Completed final sign-off Feb 2016 | 1271 20th Av | to comply with complaint #201690981, reinstall drywall on the celing and wall in the living room, hallway and kitchen about 90sf on unit c (ground level).Details
to comply with complaint #201690981, reinstall drywall on the celing and wall in the living room, hallway and kitchen about 90sf on unit c (ground level). | $500 |
| Mar 17, 2015 | Completed final sign-off Oct 2015 | 181 11th Av | 3/f -remodel kitchen & convert (e) bedroom into bathroom and walk-in closet upper unitDetails
3/f -remodel kitchen & convert (e) bedroom into bathroom and walk-in closet upper unit | $10,000 |
| Jul 8, 2014 | Completed final sign-off Mar 2016 | 755 12th Av | construct new one level rear deck at rar of existing bldg. legalize one bath, one laundry & convert (e) storage to new family rm on grnd flr, demolish (e)side stair & remodel (e) kitchen on 2nd flrDetails
construct new one level rear deck at rar of existing bldg. legalize one bath, one laundry & convert (e) storage to new family rm on grnd flr, demolish (e)side stair & remodel (e) kitchen on 2nd flr | $38,000 |
| Jan 3, 2014 | Completed final sign-off Sep 2014 | 2341 Cecilia Av | at 2nd floor, remodel & relocate (e) kitchen & bathroom, new bathroom, remove walls and install new wd beams.Details
at 2nd floor, remodel & relocate (e) kitchen & bathroom, new bathroom, remove walls and install new wd beams. | $38,000 |
| Oct 18, 2011 | Completed final sign-off Jan 2012 | 142 Robinhood Dr | kitchen remodeling. replace all fixtures in kitchen. replace all cabinets, floor tiles, counter top. replace waste pipes. receptacles, change gas stove to electric stove. repair dry rot if it is existing. no structural work. new lighting comply with cec 150 (k)Details
kitchen remodeling. replace all fixtures in kitchen. replace all cabinets, floor tiles, counter top. replace waste pipes. receptacles, change gas stove to electric stove. repair dry rot if it is existing. no structural work. new lighting comply with cec 150 (k) | $6,000 |
| Jun 21, 2010 | Completed final sign-off Sep 2010 | 1561 22nd Av | work on #1561 22nd av: remodel kitchen in-kind for installing (n) kitchen cabinets, countertop & gas stove. comply with complaint#201030162 at 2nd. flr.Details
work on #1561 22nd av: remodel kitchen in-kind for installing (n) kitchen cabinets, countertop & gas stove. comply with complaint#201030162 at 2nd. flr. | $7,000 |
| May 10, 2010 | Completed final sign-off May 2011 | 1226 10th Av | comply with nov# 201031561 of march 31, 2010. remove non permitted kitchen on first floor. provide required space heating in front room of first floor.; convert illegal grnd flr dwelling unit (basement) into elgal floor of ocupancy per plansDetails
comply with nov# 201031561 of march 31, 2010. remove non permitted kitchen on first floor. provide required space heating in front room of first floor.; convert illegal grnd flr dwelling unit (basement) into elgal floor of ocupancy per plans | $26,000 |