Back to kitchen remodel contractors
3 - D Construction
- Based in
- Los Gatos
- On San Francisco permits
- Apr 2009 to Jul 2023
- Last 24 months
- 0 permits filed
4 permits since 2000: 2 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 1 days from filing to permit and 264 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 11, 2019 | Completed final sign-off Mar 2020 | 536 Kirkham St | permit for interior and exterior ti on second floor unit only: exterior work includes replacement of 10 (e) windows with wood woods (double hung sashes, no vinyl, no change of size or location of windows) including street-facing windows; kitchen remodel; no other work under this permit.Details
permit for interior and exterior ti on second floor unit only: exterior work includes replacement of 10 (e) windows with wood woods (double hung sashes, no vinyl, no change of size or location of windows) including street-facing windows; kitchen remodel; no other work under this permit. | $55,000 |