Back to kitchen remodel contractors
225 Shipley Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2009 to Jun 2018
- Last 24 months
- 0 permits filed
28 permits since 2000: 22 completed, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 never finaled. Typically 8 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 31, 2013 | Completed final sign-off Jul 2014 | 3174 16th St | "a" occupancy facility to be renovated as a continuing restaurant to extg use with modification to extg bar and kitchen and renovation to ext aluminum storefront to gain ada compliance.Details
"a" occupancy facility to be renovated as a continuing restaurant to extg use with modification to extg bar and kitchen and renovation to ext aluminum storefront to gain ada compliance. | $20,000 |
| Nov 9, 2012 | Completed final sign-off Dec 2014 | 114 Broderick St | enlarge garage depth (area) by 159 sq ft. reconfigure level one unit including relocation of kitchen and 2 bathrooms. remodel kitchen at level 2 and bathroom at level 3. new clad wood slider located at rear of residence. new furnace at garage location.Details
enlarge garage depth (area) by 159 sq ft. reconfigure level one unit including relocation of kitchen and 2 bathrooms. remodel kitchen at level 2 and bathroom at level 3. new clad wood slider located at rear of residence. new furnace at garage location. | $85,000 |
| Jun 9, 2011 | Completed final sign-off Oct 2011 | 1437 South Van Ness Av | kitchen remodel0gut, insulate, new wiring, new appliances, new plumbing, new sheetrock, trim & paintDetails
kitchen remodel0gut, insulate, new wiring, new appliances, new plumbing, new sheetrock, trim & paint | $31,000 |
| Nov 12, 2010 | Never finaled issued Nov 2010, no final | 547 02nd Av | renovation of (e) kitchen, relocation of (e) bath within confine of (e) structure & expand (e) deck within original bldg footprint.Details
renovation of (e) kitchen, relocation of (e) bath within confine of (e) structure & expand (e) deck within original bldg footprint. | $90,000 |
| Oct 19, 2009 | Completed final sign-off Dec 2009 | 1435 South Van Ness Av | legalization of an illegal kitchen cabinets & appliances renovation @ 1435 s. van ness ave.Details
legalization of an illegal kitchen cabinets & appliances renovation @ 1435 s. van ness ave. | $10,000 |