2,066 permits since 2000: 1,678 completed, 1 in progress, 157 never finaled, 230 expired or cancelled.
Of the 157 never-finaled permits, 4 are 3 to 5 years old, 12 are 5 to 10 years old, 141 are over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
157 bathroom remodel permits: 136 completed, 13 never finaled, 8 expired or cancelled. Typically 0 days from filing to permit and 64 days from permit to final inspection.
Showing the 100 most recent of 157.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2026 | Completed final sign-off Jul 2026 | 249 Topeka Av | replace bathroom tilesDetails
replace bathroom tiles | $11,685 |
| Feb 26, 2024 | Completed final sign-off May 2025 | 30 19th Av | 1/f: add 1-family room, 1/2-bath, laundry room, stairs to 2/f; 2/f: remodel kitchen, bathroom, in-fill north side; 3/f: remodel bathroom; rebuild side stairs; add new patio.Details
1/f: add 1-family room, 1/2-bath, laundry room, stairs to 2/f; 2/f: remodel kitchen, bathroom, in-fill north side; 3/f: remodel bathroom; rebuild side stairs; add new patio. | $135,000 |
| Dec 4, 2023 | Completed final sign-off Dec 2023 | 8 Vicksburg St | replace 2/f bathroom floor tile and walls tile in kind.Details
replace 2/f bathroom floor tile and walls tile in kind. | $10,000 |
| Oct 20, 2023 | Completed final sign-off Dec 2023 | 118 Roanoke St | replace 2/f bathroom, floor tile, wall tile, shower tile. existing toilet, vanity and shower to remainDetails
replace 2/f bathroom, floor tile, wall tile, shower tile. existing toilet, vanity and shower to remain | $8,000 |
| May 9, 2023 | Completed final sign-off May 2023 | 284 Arleta Av | (1) bathroom remodel in kind.Details
(1) bathroom remodel in kind. | $12,000 |
| Jun 21, 2022 | Completed final sign-off Jul 2022 | 1687 35th Av | remodel bathroom, replace allshower and floor tiles, install new vanity sink, faucets, install new flooringDetails
remodel bathroom, replace allshower and floor tiles, install new vanity sink, faucets, install new flooring | $20,000 |
| Apr 6, 2022 | Completed final sign-off Aug 2022 | 655 Page St | unit #8: replace kitchen countertop & cabinet. replace bathroom tile. no structural work - no wall/framing modificaiton.Details
unit #8: replace kitchen countertop & cabinet. replace bathroom tile. no structural work - no wall/framing modificaiton. | $12,000 |
| Jan 19, 2022 | Completed final sign-off May 2022 | 156 Princeton St | 1.install vinyl siding back of home (unvisible) :2. replace 5 vinyl window in back (unvisible) replace 2 aluminum window in front (visible) 3. remodel kitchen and 2 bathrooms.Details
1.install vinyl siding back of home (unvisible) :2. replace 5 vinyl window in back (unvisible) replace 2 aluminum window in front (visible) 3. remodel kitchen and 2 bathrooms. | $72,000 |
| Oct 29, 2021 | Never finaled issued Oct 2021, no final | 2 Vicksburg St | replace in kind. 1) replace kitchen cabinet and countertop only. no layout changes. 2)replace bathroom floor tiles and wall tiles.Details
replace in kind. 1) replace kitchen cabinet and countertop only. no layout changes. 2)replace bathroom floor tiles and wall tiles. | $21,000 |
| Sep 30, 2021 | Completed final sign-off Nov 2021 | 175 Bluxome St | replace floor tiles for two bathroom only. unit 301Details
replace floor tiles for two bathroom only. unit 301 | $5,000 |
| Jul 8, 2021 | Completed final sign-off Oct 2021 | 687 Teresita Bl | remodel ground floor bonus room to master bedroom with one full bathroom and office.Details
remodel ground floor bonus room to master bedroom with one full bathroom and office. | $50,000 |
| Jul 1, 2021 | Completed final sign-off Aug 2021 | 1 San Gabriel Av | remodel upstairs bathroom in-kind, no wall alteration/structural work.Details
remodel upstairs bathroom in-kind, no wall alteration/structural work. | $10,000 |
| Jan 28, 2021 | Never finaled issued Jan 2021, no final | 655 Page St | unit 1: replace bathroom tile & kitchen cabinets. no structural changes.Details
unit 1: replace bathroom tile & kitchen cabinets. no structural changes. | $9,000 |
| Sep 30, 2020 | Completed final sign-off Oct 2021 | 1500 Castro St | remodel bathroom in-kind, upgrade electrical, replace furnaces, (e) six windows in-kind (aluminum in front and rear, windows in-kind.Details
remodel bathroom in-kind, upgrade electrical, replace furnaces, (e) six windows in-kind (aluminum in front and rear, windows in-kind. | $45,000 |
| May 21, 2020 | Completed final sign-off Jul 2020 | 2640 Webster St | remodel master bathroom in kind due to leak. no structural changes.Details
remodel master bathroom in kind due to leak. no structural changes. | $10,000 |
| Feb 13, 2020 | Completed final sign-off Jul 2020 | 143 Ramsell St | remodel bathroom - no structural changes. replace kitchen counter top. all work in kind.Details
remodel bathroom - no structural changes. replace kitchen counter top. all work in kind. | $20,000 |
| Jan 13, 2020 | Completed final sign-off Jan 2020 | 320 18th Av | repair water leak around master bathroom window. no structural changes. work in back of home. not visible from street.Details
repair water leak around master bathroom window. no structural changes. work in back of home. not visible from street. | $2,000 |
| Nov 20, 2019 | Completed final sign-off Jan 2020 | 655 Page St | unit 6: replace bathroom tile & kitchen cabinets. no structural changesDetails
unit 6: replace bathroom tile & kitchen cabinets. no structural changes | $8,000 |
| Oct 29, 2019 | Completed final sign-off Jan 2020 | 655 Page St | apt 3: replace kitchen countertop & bathroom tile (floor & wall). no structural changes. (not a full kitchen & bathroom remodel).Details
apt 3: replace kitchen countertop & bathroom tile (floor & wall). no structural changes. (not a full kitchen & bathroom remodel). | $6,000 |
| Jul 18, 2019 | Completed final sign-off Sep 2019 | 910 Lawton St | remodel upstairs bathroom-no structural changes. rmeodel in-kind. to copmly with cec 150.0(k)5.Details
remodel upstairs bathroom-no structural changes. rmeodel in-kind. to copmly with cec 150.0(k)5. | $12,000 |
| Jun 27, 2019 | Completed final sign-off Aug 2019 | 320 18th Av | remodel guest bathroom, no structural change.Details
remodel guest bathroom, no structural change. | $11,000 |
| Jan 3, 2019 | Completed final sign-off May 2019 | 1517 Shrader St | 1/f: legalize (e) bathroom & media room.Details
1/f: legalize (e) bathroom & media room. | $10,000 |
| Dec 21, 2018 | Completed final sign-off Jan 2020 | 4127 Anza St | install new full bathroom, remodel kitchen, remodel (e) bathroom and install washier/ dryer. all work on 3rd fl. unit #4127Details
install new full bathroom, remodel kitchen, remodel (e) bathroom and install washier/ dryer. all work on 3rd fl. unit #4127 | $89,000 |
| Nov 14, 2018 | Completed final sign-off May 2019 | 1517 Shrader St | remodel ktichen & bathroom, no structural work.Details
remodel ktichen & bathroom, no structural work. | $30,000 |
| Sep 14, 2018 | Completed final sign-off Jan 2019 | 148 Faith St | remodel 6x10 master bath in kind. no structural changes. replace kitchen floor tile, replace (7) windos and dry rot back and side. replace (5) side door and dryrot. not visible from street.Details
remodel 6x10 master bath in kind. no structural changes. replace kitchen floor tile, replace (7) windos and dry rot back and side. replace (5) side door and dryrot. not visible from street. | $40,000 |
| Jul 18, 2018 | Completed final sign-off Oct 2018 | 309 Oak St | construct new bathroom at office area and remodel kitchen.Details
construct new bathroom at office area and remodel kitchen. | $30,000 |
| Jul 3, 2018 | Completed final sign-off Aug 2018 | 1145 Divisadero St | remodel master bathroom. no structural changes.Details
remodel master bathroom. no structural changes. | $12,000 |
| Jul 3, 2018 | Completed final sign-off Sep 2018 | 736 Thornton Av | remodel ktichen & bathroom. no structural changes.Details
remodel ktichen & bathroom. no structural changes. | $25,000 |
| Mar 30, 2018 | Completed final sign-off Feb 2019 | 4129 Anza St | convert water closet room to full bathroom with showerDetails
convert water closet room to full bathroom with shower | $12,000 |
| Feb 9, 2018 | Expired or cancelled cancelled Apr 2018 | 236 Holladay Av | replace bathroom tile, no structural changesDetails
replace bathroom tile, no structural changes | $3,000 |
| Feb 9, 2018 | Completed final sign-off Feb 2019 | 4129 Anza St | remodel kitchen & bathrooms - upgrade electrical, no structural changes, no rough framing/change in (e) layoutDetails
remodel kitchen & bathrooms - upgrade electrical, no structural changes, no rough framing/change in (e) layout | $22,000 |
| Oct 6, 2017 | Completed final sign-off Apr 2018 | 701 12th Av | interior remodel kitchen & bathroom on 2/f. new rooms down at g/f, full bathroom, walk-in closet, master bedroom, master bathroom, laundry room. repair front stairs in kind.Details
interior remodel kitchen & bathroom on 2/f. new rooms down at g/f, full bathroom, walk-in closet, master bedroom, master bathroom, laundry room. repair front stairs in kind. | $35,000 |
| Sep 20, 2017 | Completed final sign-off Apr 2019 | 4431 24th St | replace 2nd dwelling unit: removed under app#9810438(kitchen/bath) install washer/dryer. convert storage room at rear building to office.Details
replace 2nd dwelling unit: removed under app#9810438(kitchen/bath) install washer/dryer. convert storage room at rear building to office. | $75,000 |
| Sep 7, 2017 | Completed final sign-off Dec 2017 | 4129 Anza St | remodel kitchen & bath in kind, no structural changes, replace (1) door & (1) window with new.Details
remodel kitchen & bath in kind, no structural changes, replace (1) door & (1) window with new. | $30,000 |
| Jun 5, 2017 | Completed final sign-off Jul 2017 | 18 Minerva St | replace floor tile in master bath. replace 6 windows & 3 patio doors. no structural changes, not visible from street.Details
replace floor tile in master bath. replace 6 windows & 3 patio doors. no structural changes, not visible from street. | $8,800 |
| May 8, 2017 | Completed final sign-off Oct 2017 | 1 San Gabriel Av | rooms down to include full bathroom and 2 bedrooms (garage level)Details
rooms down to include full bathroom and 2 bedrooms (garage level) | $35,000 |
| Apr 11, 2017 | Completed final sign-off Feb 2018 | 370 31st Av | interior remodel 1st, 2nd and 3rd floor. change layout on 2nd floor. new construction on ground floor to include full bathroom, bedroom, kitchen and laundry. foundation upgrade on ground floorDetails
interior remodel 1st, 2nd and 3rd floor. change layout on 2nd floor. new construction on ground floor to include full bathroom, bedroom, kitchen and laundry. foundation upgrade on ground floor | $200,000 |
| Feb 16, 2017 | Completed final sign-off Apr 2017 | 309 Sargent St | add bathroom to level one. enlarge level 2 master bathroom. ref app#201612195368- add full bathroom at lower level.Details
add bathroom to level one. enlarge level 2 master bathroom. ref app#201612195368- add full bathroom at lower level. | $15,000 |
| Dec 19, 2016 | Completed final sign-off Apr 2017 | 309 Sargent St | kitchen and 3 bathrooms remodel. legalize bedroom at ground floor.Details
kitchen and 3 bathrooms remodel. legalize bedroom at ground floor. | $45,000 |
| Nov 10, 2016 | Completed final sign-off Nov 2016 | 1 San Gabriel Av | replace vinyl siding to west wall of home and (1) bathroom window, no structural changes, not visable from street, u factor 0.32 max.Details
replace vinyl siding to west wall of home and (1) bathroom window, no structural changes, not visable from street, u factor 0.32 max. | $3,500 |
| Oct 12, 2016 | Completed final sign-off Dec 2016 | 2011 Thomas Av | remodel hall bathroom. no structural changes.Details
remodel hall bathroom. no structural changes. | $14,000 |
| Oct 6, 2016 | Completed final sign-off Oct 2016 | 1646 Stockton St | replace bathroom, floor tile.Details
replace bathroom, floor tile. | $3,000 |
| Oct 4, 2016 | Completed final sign-off Oct 2016 | 2378 Union St | replace bathroom floor tile.Details
replace bathroom floor tile. | $2,500 |
| Aug 26, 2016 | Completed final sign-off Oct 2016 | 1701 Pierce St | remodel bathroomDetails
remodel bathroom | $12,000 |
| Aug 23, 2016 | Completed final sign-off Apr 2017 | 1201 California St | #901 - replace tiles in guest bathroomDetails
#901 - replace tiles in guest bathroom | $4,000 |
| Aug 23, 2016 | Completed final sign-off Dec 2016 | 43 Maddux Av | remodel 1 bathroom & kitchen on 2/f- no change of walls; structural changes.Details
remodel 1 bathroom & kitchen on 2/f- no change of walls; structural changes. | $23,000 |
| Jun 27, 2016 | Completed final sign-off Aug 2016 | 80 Teresita Bl | bathroom remodel - no structural changesDetails
bathroom remodel - no structural changes | $10,000 |
| Jun 22, 2016 | Completed final sign-off Apr 2017 | 1201 California St | one bathroom remodel in unit #901: no new wall and no existing wall relocation. lighting in bathroom remodel shall comply with cec 150.0(k)5. all new sheet rock shall not be less than 5/8" type x gyp board where apply. no change in fixture counts. no structural changes. n/a maher ord. 155-13Details
one bathroom remodel in unit #901: no new wall and no existing wall relocation. lighting in bathroom remodel shall comply with cec 150.0(k)5. all new sheet rock shall not be less than 5/8" type x gyp board where apply. no change in fixture counts. no structural changes. n/a maher ord. 155-13 | $9,500 |
| Jun 9, 2016 | Completed final sign-off Aug 2016 | 173 Warren Dr | remodel bathroom in kind. no structural changes.Details
remodel bathroom in kind. no structural changes. | $10,000 |
| Apr 25, 2016 | Never finaled issued Apr 2016, no final | 43 Maddux Av | construct new full bathroom, bedroom & media/office on ground floor (garage area)Details
construct new full bathroom, bedroom & media/office on ground floor (garage area) | $17,000 |
| Apr 14, 2016 | Completed final sign-off May 2016 | 117 Amber Dr | remodel top floor bathroom - no structural changes.Details
remodel top floor bathroom - no structural changes. | $7,000 |
| Mar 29, 2016 | Completed final sign-off May 2016 | 100 Bronte St | replace bathroom wall tile and floor tile. no change to fixtures, no plumbing nwork. no structural change.sDetails
replace bathroom wall tile and floor tile. no change to fixtures, no plumbing nwork. no structural change.s | $3,500 |
| Feb 4, 2016 | Completed final sign-off Mar 2016 | 1225 Taylor St | unit #407 remodel kitchen & bathroom. no walls moved, removed added or infilled. all (e) layouts to remain unchanged. n/a for maher.Details
unit #407 remodel kitchen & bathroom. no walls moved, removed added or infilled. all (e) layouts to remain unchanged. n/a for maher. | $30,000 |
| Jan 21, 2016 | Expired or cancelled cancelled Feb 2016 | 1255 Taylor St | unit #407: remodel kitchen and bath. no structural changes. no wall changes.Details
unit #407: remodel kitchen and bath. no structural changes. no wall changes. | $22,000 |
| Dec 31, 2015 | Completed final sign-off May 2016 | 199 Elsie St | interior remodel with new rooms down to include full bathroom, master bed & bath room & den, family room. relocate kitchen on 2nd floor.Details
interior remodel with new rooms down to include full bathroom, master bed & bath room & den, family room. relocate kitchen on 2nd floor. | $50,000 |
| Nov 24, 2015 | Completed final sign-off Feb 2016 | 585 Vienna St | remodel kitchen and bathroom, no structural changes,same configuration.Details
remodel kitchen and bathroom, no structural changes,same configuration. | $20,000 |
| Oct 6, 2015 | Never finaled issued Oct 2015, no final | 206 Clipper St | remdel master bath, replace exhaust fan, remodel guest bath & kitchen. no structural changes. no changes to wall or fixture location. all new lites shall be led.Details
remdel master bath, replace exhaust fan, remodel guest bath & kitchen. no structural changes. no changes to wall or fixture location. all new lites shall be led. | $30,000 |
| Sep 29, 2015 | Completed final sign-off Dec 2015 | 29 West Clay St | remodel (2) full baths and (1) 1/2 bath, re-sheetrock in living room, hallway, basement room & hallway, no structural changes, no layout change and no opening change.Details
remodel (2) full baths and (1) 1/2 bath, re-sheetrock in living room, hallway, basement room & hallway, no structural changes, no layout change and no opening change. | $35,000 |
| Aug 3, 2015 | Completed final sign-off Oct 2015 | 4036 California St | remodel (2) kitchens & (2) bathrooms in-kind; replace 17 vinyl windows in back & (2) sides of home. no structural changes. not visible from street. no alteration of wall & door. u=0.32 max.Details
remodel (2) kitchens & (2) bathrooms in-kind; replace 17 vinyl windows in back & (2) sides of home. no structural changes. not visible from street. no alteration of wall & door. u=0.32 max. | $80,000 |
| Jul 2, 2015 | Never finaled issued Jul 2015, no final | 1251 Filbert St | replace bathroom tile at one bathroom on second floorDetails
replace bathroom tile at one bathroom on second floor | $3,500 |
| Jun 15, 2015 | Completed final sign-off Jul 2015 | 1160 Pine St | #11- remodel kitchen & 1 bathroom, no structural changes. n/a ordinance #155-13Details
#11- remodel kitchen & 1 bathroom, no structural changes. n/a ordinance #155-13 | $20,000 |
| May 29, 2015 | Completed final sign-off Aug 2015 | 670 46th Av | remodel top floor bathroom; replace 5 windows no structural changes; not visible from street; to comply with cec150.0k)5; u-factor not >.32Details
remodel top floor bathroom; replace 5 windows no structural changes; not visible from street; to comply with cec150.0k)5; u-factor not >.32 | $28,000 |
| May 27, 2015 | Completed final sign-off Feb 2016 | 314 Baker St | 3rf floor: renovate unit #314 a. reconfigure for 2 bedrooms/1 bath layout. no change to unit size. revision to app#201505227000Details
3rf floor: renovate unit #314 a. reconfigure for 2 bedrooms/1 bath layout. no change to unit size. revision to app#201505227000 | $25,000 |
| May 22, 2015 | Completed final sign-off Feb 2016 | 314 Baker St | replace bathroom floor and wall tiles, no other fixture replacement and no lighting work.Details
replace bathroom floor and wall tiles, no other fixture replacement and no lighting work. | $3,500 |
| May 15, 2015 | Completed final sign-off Aug 2015 | 670 46th Av | construct family room and a full bathroom in garage (ground floor) level.Details
construct family room and a full bathroom in garage (ground floor) level. | $30,000 |
| May 6, 2015 | Completed final sign-off Jul 2015 | 1645 Golden Gate Av | unit 1: remodel kitchen & bathroom, no structural changes.Details
unit 1: remodel kitchen & bathroom, no structural changes. | $15,000 |
| May 6, 2015 | Completed final sign-off Jun 2015 | 2682 Folsom St | remodel kitchen & bathroom, no structural changes.Details
remodel kitchen & bathroom, no structural changes. | $5,000 |
| May 6, 2015 | Completed final sign-off Jul 2015 | 1645 Golden Gate Av | #4- remodel kitchen and bathroom, no structural changes.Details
#4- remodel kitchen and bathroom, no structural changes. | $15,000 |
| Apr 13, 2015 | Completed final sign-off May 2015 | 1225 Taylor St | unit# 304 remodel kitchen, replace bathroom sink & toilet & floor tile. no structural work. no wall modification. n/a for maher.Details
unit# 304 remodel kitchen, replace bathroom sink & toilet & floor tile. no structural work. no wall modification. n/a for maher. | $24,000 |
| Apr 13, 2015 | Never finaled issued Apr 2015, no final | 31 Maddux Av | remodel kitchen, bathroom & upgrade electrical to second fl. replace 6 vinyl windows not visible from street. no structural work. no wall modification.Details
remodel kitchen, bathroom & upgrade electrical to second fl. replace 6 vinyl windows not visible from street. no structural work. no wall modification. | $29,000 |
| Apr 13, 2015 | Completed final sign-off May 2015 | 1225 Taylor St | unit# 204. remodel kitchen, replace bathroom sink & toilet & floor tile. no structural work. no wall modification. n/a for maher.Details
unit# 204. remodel kitchen, replace bathroom sink & toilet & floor tile. no structural work. no wall modification. n/a for maher. | $24,000 |
| Mar 11, 2015 | Never finaled issued Mar 2015, no final | 3323 Scott St | replace bathroom tile due to water damage in basement, replace kitchen cabinets & counter top, no structural changes, no lighting change.Details
replace bathroom tile due to water damage in basement, replace kitchen cabinets & counter top, no structural changes, no lighting change. | $7,000 |
| Feb 18, 2015 | Completed final sign-off Feb 2015 | 480 Douglass St | replace basement bathroom tile floor & tubwalls.Details
replace basement bathroom tile floor & tubwalls. | $3,000 |
| Feb 3, 2015 | Completed final sign-off Mar 2015 | 145 Merced Av | replace bathroom window on side not visible from street. u-factor 0.32 max.Details
replace bathroom window on side not visible from street. u-factor 0.32 max. | $1,000 |
| Nov 4, 2014 | Completed final sign-off Feb 2015 | 3321 Scott St | remodel 1-1/2 baths and kitchen, upgrade electrical wiring. replace in-kind wood windows (6) on front facade - no change to grid pattern; replace (13) side and rear windows with vinyl windows. no structural changes. max u-factor 0.32Details
remodel 1-1/2 baths and kitchen, upgrade electrical wiring. replace in-kind wood windows (6) on front facade - no change to grid pattern; replace (13) side and rear windows with vinyl windows. no structural changes. max u-factor 0.32 | $45,000 |
| Sep 5, 2014 | Completed final sign-off Mar 2015 | 67 Randall St | remodel kitchen and 2 baths in kind. no structural changes.Details
remodel kitchen and 2 baths in kind. no structural changes. | $30,000 |
| Jun 30, 2014 | Completed final sign-off Jan 2015 | 163 Pixley St | remodel kitchen cabinets, appliances, hardwood floors at level 3; new tiles and plumbing fixtures at bathroom; to comply with cec150(k) 8 & 10Details
remodel kitchen cabinets, appliances, hardwood floors at level 3; new tiles and plumbing fixtures at bathroom; to comply with cec150(k) 8 & 10 | $17,500 |
| May 21, 2014 | Completed final sign-off Oct 2014 | 1750 Noe St | construct sleeping rom at (e) ground floor family room, relocate (e) bathroom to allow for access to rear yard hallway,Details
construct sleeping rom at (e) ground floor family room, relocate (e) bathroom to allow for access to rear yard hallway, | $10,000 |
| May 15, 2014 | Completed final sign-off Aug 2014 | 1750 Noe St | remodel (2) bathrooms (5'x8') and kitchens (10'x12') - no structural changes. repair back deck dry rot - less than 50%, replace 10 windows and 4 patio doors to home. rewire home. remove sheet metal - siding in back of home side - apply stuccoDetails
remodel (2) bathrooms (5'x8') and kitchens (10'x12') - no structural changes. repair back deck dry rot - less than 50%, replace 10 windows and 4 patio doors to home. rewire home. remove sheet metal - siding in back of home side - apply stucco | $80,000 |
| May 12, 2014 | Completed final sign-off Aug 2014 | 161 Pixley St | level 1 electrical upgrade, level 1 add 1/2 bath, remodel laundry and add playroom; level 2, electrical upgrade, remodel bath, n/a maherDetails
level 1 electrical upgrade, level 1 add 1/2 bath, remodel laundry and add playroom; level 2, electrical upgrade, remodel bath, n/a maher | $19,000 |
| Apr 18, 2014 | Completed final sign-off Aug 2014 | 1715 30th Av | remodel kitchen and bathroom at 2nd floor. construct new sleeping room and full bathroom at ground floor.Details
remodel kitchen and bathroom at 2nd floor. construct new sleeping room and full bathroom at ground floor. | $15,000 |
| Feb 25, 2014 | Completed final sign-off Mar 2014 | 420 Monterey Bl | remodel upstairs 1 bathroom. upgrade main electrical panel.Details
remodel upstairs 1 bathroom. upgrade main electrical panel. | $95,000 |
| Feb 25, 2014 | Completed final sign-off Mar 2014 | 147 Lee Av | remodel upstairs 1 bathroom. upgrade main electrical panel.Details
remodel upstairs 1 bathroom. upgrade main electrical panel. | $12,000 |
| Jan 22, 2014 | Completed final sign-off Apr 2014 | 145 Merced Av | remodel master bathroom in kind, no structural changes tu b and toiletDetails
remodel master bathroom in kind, no structural changes tu b and toilet | $8,000 |
| Jan 16, 2014 | Completed final sign-off Jul 2018 | 480 Douglass St | remodel kitchen: upgrade electrical wire for unit, all new lights shall be flourescent, remove all sheetrock walls & ceilings for insulation. replace 8 windows in back & side of home, max u factor =0.40. remodel bathroom, (n) exhaust fan with humidistat. no structural changes.Details
remodel kitchen: upgrade electrical wire for unit, all new lights shall be flourescent, remove all sheetrock walls & ceilings for insulation. replace 8 windows in back & side of home, max u factor =0.40. remodel bathroom, (n) exhaust fan with humidistat. no structural changes. | $48,000 |
| Jan 9, 2014 | Never finaled issued Jan 2014, no final | 830 Lawton St | replace bathroom tile in basement.Details
replace bathroom tile in basement. | $2,000 |
| Oct 16, 2013 | Completed final sign-off Jan 2014 | 746 Shrader St | remodel kitchen & bathroom. no structural changes. remodel laundry room. no structural workDetails
remodel kitchen & bathroom. no structural changes. remodel laundry room. no structural work | $18,000 |
| Aug 7, 2013 | Completed final sign-off Dec 2013 | 1245 Folsom St | upgrade handicap bathroomDetails
upgrade handicap bathroom | $15,000 |
| Jul 22, 2013 | Completed final sign-off Sep 2013 | 3323 Scott St | remodel bathroom and kitchen, upgrade electrical subpanel, replace 5 wood windows to front of bldg. and 7 vinyl to back and side. no structural changes.Details
remodel bathroom and kitchen, upgrade electrical subpanel, replace 5 wood windows to front of bldg. and 7 vinyl to back and side. no structural changes. | $28,000 |
| Jun 21, 2013 | Completed final sign-off Aug 2013 | 145 Merced Av | add full bath at existing sunroom. new lighting, tile, plumbing, fixturesDetails
add full bath at existing sunroom. new lighting, tile, plumbing, fixtures | $15,000 |
| Jun 19, 2013 | Completed final sign-off Sep 2013 | 521 Dellbrook Av | upstairs bathroom remodel, in-kind, no structural changes.Details
upstairs bathroom remodel, in-kind, no structural changes. | $9,000 |
| Jun 6, 2013 | Completed final sign-off Jul 2013 | 4330 20th St | remodel bathroom - no structural changes, storm/rain master from roofs shall drain directly into sanitary system. extend flue in back of bldg above roof.Details
remodel bathroom - no structural changes, storm/rain master from roofs shall drain directly into sanitary system. extend flue in back of bldg above roof. | $9,000 |
| May 1, 2013 | Never finaled issued May 2013, no final | 2501 Moraga St | repair living room water damage, replace electrical wiring in living room, replace bathroom faucet, u factor 0.40, replace 19 windows to home, no structural changes, 19 windows front, wood window in kind.Details
repair living room water damage, replace electrical wiring in living room, replace bathroom faucet, u factor 0.40, replace 19 windows to home, no structural changes, 19 windows front, wood window in kind. | $22,000 |
| Apr 19, 2013 | Completed final sign-off Sep 2013 | 647 Myra Wy | construct family room & full bathroom at garage level, install new balocny & install spiral staircase in rear yard.Details
construct family room & full bathroom at garage level, install new balocny & install spiral staircase in rear yard. | $60,000 |
| Apr 12, 2013 | Completed final sign-off May 2013 | 5567 Diamond Heights Bl | remodel downstairs bathroom, no structural changes.Details
remodel downstairs bathroom, no structural changes. | $9,600 |
| Apr 12, 2013 | Completed final sign-off May 2013 | 1597 15th Av | remodel upstairs master bath, no structural changes.Details
remodel upstairs master bath, no structural changes. | $9,800 |
| Mar 27, 2013 | Never finaled issued Mar 2013, no final | 2501 Moraga St | remodel bathroom, retrofit basement, bolt foundation only.Details
remodel bathroom, retrofit basement, bolt foundation only. | $18,000 |
| Feb 13, 2013 | Completed final sign-off Mar 2013 | 480 Fillmore St | remodel bathroom, no structural changes, no change on wall.Details
remodel bathroom, no structural changes, no change on wall. | $9,800 |
| Jan 15, 2013 | Completed final sign-off Apr 2013 | 1818 31st Av | remodel 1 kitchen, 1 bath to 2nd floor, upgrade electrical & main panel, install new furnace, replace windows to back of home, (3) with vinyl, repair garage door, in kind, no structural changes.Details
remodel 1 kitchen, 1 bath to 2nd floor, upgrade electrical & main panel, install new furnace, replace windows to back of home, (3) with vinyl, repair garage door, in kind, no structural changes. | $35,000 |
| Oct 15, 2012 | Completed final sign-off Jan 2013 | 29 West Clay St | remodel top floor bathroom and replace 1 window on side wallDetails
remodel top floor bathroom and replace 1 window on side wall | $25,000 |