Block 6552, lot 051
3984 26th St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 1
- Rooms
- 2 bedrooms, 1 bathroom
- Building
- 1,446 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 27, 2024 | Completed final sign-off Apr 2025 | 3984 26th St | Ciarrai Construction | kitchen remodel in kind. bathroom remodel, add a bathroom, relocate laundry. move two doors, demo existing chimney, electrical & plumbing work. tile work, sheetrock/taping, flooring & painting. all work to be carried out on the second fl of the buildingDetails
kitchen remodel in kind. bathroom remodel, add a bathroom, relocate laundry. move two doors, demo existing chimney, electrical & plumbing work. tile work, sheetrock/taping, flooring & painting. all work to be carried out on the second fl of the building | $150,000 |
| Apr 13, 2016 | Never finaled issued Apr 2016, no final | 3984 26th St | street space permitDetails
street space permit | ||
| Jun 16, 2010 | Completed final sign-off Jul 2010 | 3984 26th St | Details Details | replace (e) deck railing. replace (e) deck stair to grade.Details
replace (e) deck railing. replace (e) deck stair to grade. | $2,500 |
| Jul 16, 2008 | Completed final sign-off Sep 2008 | 3982 26th St | Keep Construction | master bathrm remodel. t-24 compliant electric work plumbing. replace 1 window.Details
master bathrm remodel. t-24 compliant electric work plumbing. replace 1 window. | $30,000 |
| May 14, 2008 | Completed final sign-off Jul 2008 | 3982 26th St | Details Details | repair deck no more than 50%.Details
repair deck no more than 50%. | $5,000 |
| Jan 18, 2008 | Completed final sign-off Jul 2008 | 3982 26th St | Details Details | seismic strenghtening of foundation under back rooms of buildings. (these were merly wash rooms) and capping of foundation along back wall of building.Details
seismic strenghtening of foundation under back rooms of buildings. (these were merly wash rooms) and capping of foundation along back wall of building. | $20,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.