Ryan Morris
- Listed as
- architect, authorized agent-others
- Firm
- Morris Architecture
- Based in
- Milbrae
- On San Francisco permits
- Apr 2017 to Jul 2026
10 permits since 2000 (architect on 9 permits, authorized agent-others on 1 permit): 8 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 14, 2026 | In progress filed Jul 2026, not yet issued | 4145 Ocean Av | new 1 bed & 1 bath attached adu. convert one car garage & conditioned space in lower level of a 2 story split level sfd into an adu. upper floor work entails only straightening stair down to lower level. laundry moved from mechanical basement to new laundry room.Details
new 1 bed & 1 bath attached adu. convert one car garage & conditioned space in lower level of a 2 story split level sfd into an adu. upper floor work entails only straightening stair down to lower level. laundry moved from mechanical basement to new laundry room. | $155,000 | |
| Jan 20, 2026 | In progress issued Jul 2026 | 4390 Cesar Chavez St | Ciarrai Construction | add bathroom to crawl space, add kitchenette to basement. foundation & structural work per plans. electrical & plumbing work to be carried out. adding new laundry in crawl space.Details
add bathroom to crawl space, add kitchenette to basement. foundation & structural work per plans. electrical & plumbing work to be carried out. adding new laundry in crawl space. | $222,000 |
| Apr 17, 2025 | Completed final sign-off Oct 2025 | 762 29th Av | Olcote Builders Inc | revision pa 2024-0201-5085 structural changes to proposed deck. remove window #2 from proposed scope & shear wallsDetails
revision pa 2024-0201-5085 structural changes to proposed deck. remove window #2 from proposed scope & shear walls | |
| Aug 27, 2024 | Completed final sign-off Apr 2025 | 3984 26th St | Ciarrai Construction | kitchen remodel in kind. bathroom remodel, add a bathroom, relocate laundry. move two doors, demo existing chimney, electrical & plumbing work. tile work, sheetrock/taping, flooring & painting. all work to be carried out on the second fl of the buildingDetails
kitchen remodel in kind. bathroom remodel, add a bathroom, relocate laundry. move two doors, demo existing chimney, electrical & plumbing work. tile work, sheetrock/taping, flooring & painting. all work to be carried out on the second fl of the building | $150,000 |
| Aug 22, 2022 | Completed final sign-off Dec 2023 | 2179 31st Av | Fu Chung Cheung | revision to bpa#202008061220. structural detail clarificationsDetails
revision to bpa#202008061220. structural detail clarifications | |
| Jul 11, 2022 | Completed final sign-off Dec 2023 | 1027 Felton St | Behan Construction | addition to back side of single family residence to include new bedrooms with 2nd floor deck above. remodel at 1st floor to include media room and bathrooms.Details
addition to back side of single family residence to include new bedrooms with 2nd floor deck above. remodel at 1st floor to include media room and bathrooms. | $32,300 |
| Jan 29, 2021 | Completed final sign-off Oct 2025 | 1504 23rd Av | legalization of unauthorized first floor unit within existing multi-family building. relocate existing unit kitchen counter and sink to opposite wall within unitDetails
legalization of unauthorized first floor unit within existing multi-family building. relocate existing unit kitchen counter and sink to opposite wall within unit | $20,000 | |
| Aug 6, 2020 | Completed final sign-off Dec 2023 | 2179 31st Av | Fu Chung Cheung | remodel of an existing 2-story home. scope includes a new stair & conversion of ground floor basement storage area into living areas. a new kitchen & family room configuration on 1st fl with the addition of bathroom & office. new rear deck & stairs.Details
remodel of an existing 2-story home. scope includes a new stair & conversion of ground floor basement storage area into living areas. a new kitchen & family room configuration on 1st fl with the addition of bathroom & office. new rear deck & stairs. | $200,000 |
| Mar 14, 2018 | Completed final sign-off Oct 2018 | 1916 15th Av | Behan Construction | deck addition in front yard; change front windows to sliding glass door. replace (e) door & window & with new wood clad windows & 2 skylights; in kind, same sizes and same locations.Details
deck addition in front yard; change front windows to sliding glass door. replace (e) door & window & with new wood clad windows & 2 skylights; in kind, same sizes and same locations. | $25,000 |
| Apr 18, 2017 | Completed final sign-off Mar 2018 | 35 Noe St | Behan Construction | convert existing bedroom to new bath & closet, remodel (e) bath & portion of kitchen, remove one load bearing wall.Details
convert existing bedroom to new bath & closet, remodel (e) bath & portion of kitchen, remove one load bearing wall. | $35,000 |