Block 6548, lot 018
280 Clipper St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 2,809 sq ft
- Lot
- 2,850 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 26, 2026 | In progress issued Jun 2026 | 280 Clipper St | Westco Roofing Co. Inc. | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $37,000 |
| Jan 5, 2023 | Completed final sign-off Apr 2023 | 280 Clipper St | Orchard Construction | bathroom remodelDetails
bathroom remodel | $15,000 |
| Apr 4, 2016 | Completed final sign-off Aug 2016 | 280 Clipper St | House To Home Remodeling | revision to app#201312124058 for architectural changes to rear. facade as per drawings by q architecture dated 4/1/16 6" curb change to 42" 1 hour wall at roof deck east side, add 2 solar tube skylights, and 2 pairs of doors changed to one pair and 2 side lites.Details
revision to app#201312124058 for architectural changes to rear. facade as per drawings by q architecture dated 4/1/16 6" curb change to 42" 1 hour wall at roof deck east side, add 2 solar tube skylights, and 2 pairs of doors changed to one pair and 2 side lites. | $5,000 |
| Oct 27, 2015 | Never finaled issued Feb 2016, no final | 280 Clipper St | street spaceDetails
street space | ||
| Sep 1, 2015 | Never finaled issued Sep 2015, no final | 280 Clipper St | street spaceDetails
street space | ||
| Sep 1, 2015 | Never finaled issued Sep 2015, no final | 280 Clipper St | street space permitDetails
street space permit | ||
| Sep 1, 2015 | Never finaled issued Oct 2015, no final | 280 Clipper St | House To Home Remodeling | add a steel moment frame at the front elevation of the houseDetails
add a steel moment frame at the front elevation of the house | $20,000 |
| Jul 13, 2015 | Completed final sign-off Mar 2016 | 280 Clipper St | House To Home Remodeling | install underground rainwater cistern & equipment.Details
install underground rainwater cistern & equipment. | $25,000 |
| Jul 8, 2015 | Never finaled issued Jul 2015, no final | 280 Clipper St | street spaceDetails
street space | ||
| Mar 10, 2015 | Never finaled issued Mar 2015, no final | 280 Clipper St | street space permitDetails
street space permit | ||
| Jan 21, 2015 | Completed final sign-off Aug 2016 | 280 Clipper St | House To Home Remodeling | structural revision to bpa#201312124058-r2 to account for (e) conditions at rear of (e) houseDetails
structural revision to bpa#201312124058-r2 to account for (e) conditions at rear of (e) house | $5,000 |
| Dec 12, 2013 | Completed final sign-off Aug 2016 | 280 Clipper St | House To Home Remodeling | a one story addition on ground level only. the additional space will be a living room. replace extg rear windows with 2 french doors.Details
a one story addition on ground level only. the additional space will be a living room. replace extg rear windows with 2 french doors. | $90,000 |
| Aug 14, 2009 | Never finaled issued Aug 2009, no final | 280 Clipper St | street space permit.Details
street space permit. | ||
| Mar 17, 2000 | Expired or cancelled expired Jul 2000 | 280 Clipper St | document as built conditionsDetails
document as built conditions | $750 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- House To Home Remodeling (5), Orchard Construction, Westco Roofing Co. Inc.
- Architects
- Dawn Ma
- Engineers
- Engin Yagmur
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.