Permit GraphShortlistSan Francisco building permits since 2000

Block 5278, lot 016

4301 03rd St

City’s use
Commercial Misc
Built
1927
Stories
1
Building
9,857 sq ft
Lot
9,857 sq ft
Zoning
NC3
Construction type
NA

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

18 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 8, 2019Completed
final sign-off Jan 2020
4301 03rd StMares & Dow Constructioninstall sub-surface drain
Details
Permit
201911086844
Permit issued
Nov 14, 2019
Final sign-off
Jan 16, 2020

install sub-surface drain

Open the permit page

$61,000
Sep 30, 2015Never finaled
issued Oct 2015, no final
4301 03rd StPyro-Comm Systems, Inc.relocate 3 extg relay modules and add one smoke detector to extg fire alarm system in extg bldg. ref app#201507171814. n/a for maher
Details
Permit
201509308439
Permit issued
Oct 1, 2015

relocate 3 extg relay modules and add one smoke detector to extg fire alarm system in extg bldg. ref app#201507171814. n/a for maher

Open the permit page

$2,000
Jul 17, 2015Never finaled
issued Jul 2015, no final
4301 03rd StPlant Construction Co, Lpimprovements to 2nd floor elevator machine room. n/a for maher. ref #201103071510 s1/r1
Details
Permit
201507171814
Permit issued
Jul 22, 2015

improvements to 2nd floor elevator machine room. n/a for maher. ref #201103071510 s1/r1

Open the permit page

$16,000
Dec 6, 2012Never finaled
issued Dec 2012, no final
4301 03rd StPyro-Comm Systems, Inc.fire alarm as builts revisions to pa# 2011-1213-0571. deleting shunt trip remove 2 heat detectors, 1 relay and 1 module- revise the sequence of operation to show removal of shunt trip-.
Details
Permit
201212065609
Permit issued
Dec 6, 2012

fire alarm as builts revisions to pa# 2011-1213-0571. deleting shunt trip remove 2 heat detectors, 1 relay and 1 module- revise the sequence of operation to show removal of shunt trip-.

Open the permit page

Aug 21, 2012Completed
final sign-off Dec 2012
4301 03rd StThomas Swan Sign Co Incto erect non-electrical sign " college track" in front of building.
Details
Permit
201208217957
Permit issued
Sep 6, 2012
Final sign-off
Dec 17, 2012

to erect non-electrical sign " college track" in front of building.

Open the permit page

$2,000
Aug 21, 2012Completed
final sign-off Dec 2012
4301 03rd StThomas Swan Sign Co Incinstall illuminated sigh at top of entrance "ct"
Details
Permit
201208217961
Permit issued
Sep 6, 2012
Final sign-off
Dec 17, 2012

install illuminated sigh at top of entrance "ct"

Open the permit page

$10,000
Jul 16, 2012Never finaled
issued Jul 2012, no final
4301 03rd Ststreet space
Details
Permit
M335347
Permit issued
Jul 16, 2012

street space

Open the permit page

Jul 13, 2012Never finaled
issued Jul 2012, no final
4301 03rd Ststreet space & sidewalk repair
Details
Permit
M334927
Permit issued
Jul 13, 2012

street space & sidewalk repair

Open the permit page

Jun 6, 2012Completed
final sign-off Aug 2012
4301 03rd StValue Fire Protection Incinstall approx 10' pf underground fire line. refer pa# 2012-0217-4462
Details
Permit
201206062002
Permit issued
Jun 11, 2012
Final sign-off
Aug 13, 2012

install approx 10' pf underground fire line. refer pa# 2012-0217-4462

Open the permit page

$4,500
May 1, 2012Never finaled
issued May 2012, no final
4301 03rd Ststreet space & sidewalk
Details
Permit
M318027
Permit issued
May 1, 2012

street space & sidewalk

Open the permit page

Feb 17, 2012Completed
final sign-off Aug 2012
4301 03rd StValue Fire Protection Increfer to pa# 2011-0307-1510-install overhead sprinkler system for college track
Details
Permit
201202174462
Permit issued
Feb 21, 2012
Final sign-off
Aug 20, 2012

refer to pa# 2011-0307-1510-install overhead sprinkler system for college track

Open the permit page

$28,000
Dec 13, 2011Completed
final sign-off Jan 2016
4301 03rd StPyro-Comm Systems, Inc.new fire alarm system installation
Details
Permit
201112130571
Permit issued
Dec 13, 2011
Final sign-off
Jan 14, 2016

new fire alarm system installation

Open the permit page

$8,000
Mar 7, 2011Completed
final sign-off Dec 2012
4301 03rd StPlant Construction Company Lpsite permit. change of use to "e" occupancy for "college track" restore (e) brick facade and add new 2nd floor within (e) building envelope.
Details
Permit
201103071510
Permit issued
Jun 8, 2011
Final sign-off
Dec 14, 2012

site permit. change of use to "e" occupancy for "college track" restore (e) brick facade and add new 2nd floor within (e) building envelope.

Open the permit page

$2,500,000
Feb 22, 2011Completed
final sign-off Dec 2012
4301 03rd StPlant Construction Company Lpsoft interior demolition for future work per ab 17. no exterior work.
Details
Permit
201102220730
Permit issued
Feb 23, 2011
Final sign-off
Dec 17, 2012

soft interior demolition for future work per ab 17. no exterior work.

Open the permit page

$35,000
Jan 31, 2008Never finaled
issued Jan 2011, no final
4301 03rd Stumb seismic mitigation work and required ada upgrades - 1 new accessible restroom & signage entrance signage & handrail at stairs.
Details
Permit
200801313743
Permit issued
Jan 14, 2011

umb seismic mitigation work and required ada upgrades - 1 new accessible restroom & signage entrance signage & handrail at stairs.

Open the permit page

$100,000
Jan 30, 2008Never finaled
issued Feb 2008, no final
4301 03rd Stexploritory work to remove portion of sheetrock for umb core testing at brick walls and at ceiling about 200 sf at roof framing to view connections
Details
Permit
200801303615
Permit issued
Feb 12, 2008

exploritory work to remove portion of sheetrock for umb core testing at brick walls and at ceiling about 200 sf at roof framing to view connections

Open the permit page

$200
Sep 1, 2000Completed
final sign-off Dec 2000
4301 03rd StSteve's Awninginstall new awning. made of tubing & frame, canvas cover on top attached to wall by lag screw.
Details
Permit
200009019503
Permit issued
Sep 1, 2000
Final sign-off
Dec 1, 2000

install new awning. made of tubing & frame, canvas cover on top attached to wall by lag screw.

Open the permit page

$750
Sep 1, 2000Completed
final sign-off Dec 2000
4301 03rd StSteve's Awninglettering paint on awning gold lettering.
Details
Permit
200009019510
Permit issued
Sep 1, 2000
Final sign-off
Dec 1, 2000

lettering paint on awning gold lettering.

Open the permit page

$250

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Pyro-Comm Systems, Inc. (3), Plant Construction Company Lp (2), Steve's Awning (2), Thomas Swan Sign Co Inc (2), Value Fire Protection Inc (2), Mares & Dow Construction, Plant Construction Co, Lp
Architects
Eric Haesloop, Gayle Permar, Stefan Hastrup
Engineers
Andre Stephen Hawks, Harold Engle
Authorized agents
Gayle Permar

Find contractors for work like this