Block 5235, lot 003
3830 03rd St
- City’s use
- Industrial
- Built
- 1985
- Stories
- 2
- Rooms
- 5 bathrooms
- Building
- 29,156 sq ft
- Lot
- 16,271 sq ft
- Zoning
- M2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 27, 2017 | Never finaled issued Feb 2017, no final | 3830 03rd St | Steve's Awning | install electric single faced wall signDetails
install electric single faced wall sign | $4,200 |
| Dec 8, 2014 | Completed final sign-off Jan 2016 | 3830 03rd St | install new lighting for self storage t.i. ref. pa# 201111299711. n/a ordinance #155-13.Details
install new lighting for self storage t.i. ref. pa# 201111299711. n/a ordinance #155-13. | $38,000 | |
| Nov 4, 2013 | Completed final sign-off Dec 2014 | 3830 03rd St | Crime Watch Security Sys Llc | installation of a sprinkler monitoring system with elevator recall including: new fire alalrm control unit, smoke detectors (4), heat detectors (1), pull station (1) monitor modules (2), door holder, and relay modules (4). ref. pa 2013.0411.4325Details
installation of a sprinkler monitoring system with elevator recall including: new fire alalrm control unit, smoke detectors (4), heat detectors (1), pull station (1) monitor modules (2), door holder, and relay modules (4). ref. pa 2013.0411.4325 | $3,000 |
| May 23, 2013 | Completed final sign-off Jan 2016 | 3830 03rd St | revision to approved pa201111299711:revise storage unit layout & details; eliminate stair form 2nd floor to garage; provide egress door on 2nd flr at existing stair landing to 3rd st.; revise bathroom layout on 1st flr; enlarge loading dock at fairfax ave; submit deferred elevator structural supportDetails
revision to approved pa201111299711:revise storage unit layout & details; eliminate stair form 2nd floor to garage; provide egress door on 2nd flr at existing stair landing to 3rd st.; revise bathroom layout on 1st flr; enlarge loading dock at fairfax ave; submit deferred elevator structural support | ||
| Apr 11, 2013 | Completed final sign-off Dec 2014 | 3830 03rd St | Polytec Construction Company Inc | install (314) new heads throughout per nfpa #13 and 15 feet of new underground piping from curb to bldg. ti # 2011/11/29/9711Details
install (314) new heads throughout per nfpa #13 and 15 feet of new underground piping from curb to bldg. ti # 2011/11/29/9711 | $43,800 |
| Nov 29, 2011 | Completed final sign-off Jan 2016 | 3830 03rd St | remodel (e) warehouse to be a new self storage.Details
remodel (e) warehouse to be a new self storage. | $300,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Crime Watch Security Sys Llc, Polytec Construction Company Inc, Steve's Awning
- Engineers
- John Lau (2), Donald David
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.