Block 4881, lot 023
1600 Donner Ave
- City’s use
- Industrial
- Built
- 1962
- Stories
- 2
- Units
- 3
- Rooms
- 6 bathrooms
- Building
- 137,280 sq ft
- Lot
- 215,504 sq ft
- Zoning
- M1
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 28, 2025 | In progress issued Feb 2025 | 1600 Donner Av | Excel Signs | illuminated single sided facing street pole sign 'sign a' for "envision cold" share plans with 202502281293 and 1293.Details
illuminated single sided facing street pole sign 'sign a' for "envision cold" share plans with 202502281293 and 1293. | $8,700 |
| Feb 28, 2025 | In progress issued Feb 2025 | 1600 Donner Av | Excel Signs | non illuminated single sided facing parking lot (not street visible) pole sign for 'sign b' for "envision cold" share plans with 202502281293Details
non illuminated single sided facing parking lot (not street visible) pole sign for 'sign b' for "envision cold" share plans with 202502281293 | $600 |
| Feb 28, 2025 | In progress issued Feb 2025 | 1600 Donner Av | Excel Signs | 2 x non illuinated vinyl banner sign single sided located at rear gates for 'sign c' fir "envision cold" share plansDetails
2 x non illuinated vinyl banner sign single sided located at rear gates for 'sign c' fir "envision cold" share plans | $300 |
| Sep 1, 2021 | Completed final sign-off Jun 2022 | 1600 Donner Av | Central Coating Company | reroofing. to comply with coof roof requirements per 2019 california energy code 141.0(b)2bDetails
reroofing. to comply with coof roof requirements per 2019 california energy code 141.0(b)2b | $382,915 |
| Jul 9, 2021 | Never finaled issued Aug 2021, no final | 1600 Donner Av | Cold Storage Manufacturing Inc | furnish and install a new bac vca-420a evaporative condenser on existing condenser platform. this condenser will replace the existing evaporative condenser. the new condenser matches the capacity of existing condenserDetails
furnish and install a new bac vca-420a evaporative condenser on existing condenser platform. this condenser will replace the existing evaporative condenser. the new condenser matches the capacity of existing condenser | $195,000 |
| Oct 6, 2017 | Expired or cancelled cancelled Aug 2023 | 1600 Donner Av | Magnum Construction Group Inc | install new fire sprinkler system per nfpa 13 throughout the bldg including 4" underground fire service, total 64 heads.Details
install new fire sprinkler system per nfpa 13 throughout the bldg including 4" underground fire service, total 64 heads. | $35,000 |
| Jun 28, 2013 | Completed final sign-off Dec 2013 | 1600 Donner Av | Strong Builders Construction Inc. | construction of approx 36 lf non-bearing/non rated partition, 2 new outlets, 1 dual switch for (e) lights, ref pa #2013.05.15.7011 for barrier removalDetails
construction of approx 36 lf non-bearing/non rated partition, 2 new outlets, 1 dual switch for (e) lights, ref pa #2013.05.15.7011 for barrier removal | $5,000 |
| May 15, 2013 | Completed final sign-off Dec 2013 | 1600 Donner Av | Strong Builders Construction Inc. | barrier removal-ramp to entry, handrails to compliance, 3 restrooms to complianceDetails
barrier removal-ramp to entry, handrails to compliance, 3 restrooms to compliance | $30,000 |
| May 12, 2008 | Never finaled issued May 2008, no final | 1600 Donner Av | Bay Alarm Company | install fire alarm system and monitor of dry pipe sprinkler including 5 water flows, 5 os&y tamper , 5 bells, 10 modules, 1 facu, 1 sd, 1 pull box to cental station.Details
install fire alarm system and monitor of dry pipe sprinkler including 5 water flows, 5 os&y tamper , 5 bells, 10 modules, 1 facu, 1 sd, 1 pull box to cental station. | $2,795 |
| Apr 18, 2008 | Expired or cancelled cancelled Jan 2026 | 1600 Donner Av | install fire sprinkler monitoring systemDetails
install fire sprinkler monitoring system | $2,795 | |
| Oct 23, 2001 | Completed final sign-off Nov 2001 | 1600 Donner Av | replace damaged chord on lower truss & provide temporary support during constructionDetails
replace damaged chord on lower truss & provide temporary support during construction | $6,000 | |
| Aug 16, 2000 | Expired or cancelled expired Jan 2002 | 1600 Donner Av | reroofingDetails
reroofing | $100,200 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Excel Signs (3), Strong Builders Construction Inc. (2), Bay Alarm Company, Central Coating Company, Cold Storage Manufacturing Inc, Magnum Construction Group Inc
- Architects
- Peter Petruzzi (2)
- Engineers
- Joshua Allen Hill
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.