Block 4075, lot 003
706 Vermont St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Units
- 2
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 2,285 sq ft
- Lot
- 2,500 sq ft
- Zoning
- RH2
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 18, 2023 | Completed final sign-off May 2025 | 706 Vermont St | Arch Plumbing Inc | installation of 2" combo service per nfpa 24. ref 202306089539.Details
installation of 2" combo service per nfpa 24. ref 202306089539. | $6,000 |
| Jun 8, 2023 | Completed final sign-off Jul 2025 | 706 Vermont St | Thorpe Design Inc | install of 13d f/s plan. sprinklers will be installed in both units of 3-story building. underground under separate permit.Details
install of 13d f/s plan. sprinklers will be installed in both units of 3-story building. underground under separate permit. | $15,500 |
| Mar 31, 2023 | Completed final sign-off Jul 2025 | 706 Vermont St | Caliber Carpentry Inc | rev to pa# 202002184616 s2, conversion of the green roof to an occupied roof deck.Details
rev to pa# 202002184616 s2, conversion of the green roof to an occupied roof deck. | |
| Jan 18, 2023 | Completed final sign-off Jul 2025 | 706 Vermont St | Caliber Carpentry Inc | revision to pa# 2020-0218-4616: deletion of steel beams from strucutral upgrades to ground floor, relocation of shear wall on 2nd fl. shortening of shear panel at 3rd fl. hall bathDetails
revision to pa# 2020-0218-4616: deletion of steel beams from strucutral upgrades to ground floor, relocation of shear wall on 2nd fl. shortening of shear panel at 3rd fl. hall bath | $800,000 |
| Feb 18, 2020 | Completed final sign-off Jul 2025 | 706 Vermont St | Caliber Carpentry Inc | expansion of conditioned living space at the third floor to include a new primary bedroom and en-suite bath, two bedrooms, hall bath, and re-configuration of the kitchen and bedroom areas at the second floor.Details
expansion of conditioned living space at the third floor to include a new primary bedroom and en-suite bath, two bedrooms, hall bath, and re-configuration of the kitchen and bedroom areas at the second floor. | $80,000 |
| Dec 3, 2019 | Never finaled filed Dec 2019, never issued | 706 Vermont St | replace 2 failing windows on front with like kind, no change in size. wood double hung.Details
replace 2 failing windows on front with like kind, no change in size. wood double hung. | $1,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Caliber Carpentry Inc (3), Arch Plumbing Inc, Thorpe Design Inc
- Architects
- Mark Topetcher (2)
- Engineers
- Michael Hom