Block 3919, lot 001
2299 Alameda St
- City’s use
- Industrial
- Built
- 1958
- Stories
- 1
- Units
- 2
- Rooms
- 5 bathrooms
- Building
- 60,000 sq ft
- Lot
- 55,334 sq ft
- Zoning
- M1
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
31 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 3, 2026 | Completed final sign-off Aug 2026 | 2299 Alameda St | C C I Commercial Construction & Improv | revision to pa #202606153232. structural only for tiDetails
revision to pa #202606153232. structural only for ti | |
| Jun 15, 2026 | Completed final sign-off Aug 2026 | 2299 Alameda St | C C I Commercial Construction & Improv | interior t.i in an existing showroom. interior partitions, lighting and electrical, and new millwork fixtures.Details
interior t.i in an existing showroom. interior partitions, lighting and electrical, and new millwork fixtures. | $422,704 |
| Oct 8, 2025 | Completed final sign-off Jan 2026 | 111 Potrero Av | re roofing: apply tpo roofing on existing roof 52,000 sf roof area, no hot work. comply with insulation requirementsDetails
re roofing: apply tpo roofing on existing roof 52,000 sf roof area, no hot work. comply with insulation requirements | $183,000 | |
| Mar 19, 2024 | Completed final sign-off May 2024 | 2299 Alameda St | Ewsf Inc. | revision to 20240114109, 202403077355: adding structural calculations and details . moving doorwayDetails
revision to 20240114109, 202403077355: adding structural calculations and details . moving doorway | |
| Mar 7, 2024 | Completed final sign-off May 2024 | 2299 Alameda St | Ewsf Inc. | revision to pa 202401174109 build non bearing partition walls; add electrical outlets in partition walls; install new sub panel (electrical)Details
revision to pa 202401174109 build non bearing partition walls; add electrical outlets in partition walls; install new sub panel (electrical) | $1,000 |
| Jan 17, 2024 | Completed final sign-off May 2024 | 2299 Alameda St | Ewsf Inc. | combine 2 tenant spaces into 1. relocate (e) egress stairs/ relocate door. to comply w/ bid complaint#202417815.Details
combine 2 tenant spaces into 1. relocate (e) egress stairs/ relocate door. to comply w/ bid complaint#202417815. | $20,000 |
| Sep 24, 2018 | Completed final sign-off Jul 2019 | 2299 Alameda St | Rago Neon Inc. | install 3 "eq3" electric single faced wall signDetails
install 3 "eq3" electric single faced wall sign | $7,000 |
| Sep 24, 2018 | Completed final sign-off Jul 2019 | 2299 Alameda St | Rago Neon Inc. | install 1 "eq3" single faced non-electric wall signDetails
install 1 "eq3" single faced non-electric wall sign | $1,500 |
| Apr 21, 2014 | Completed final sign-off Apr 2014 | 2299 Alameda St | Star Plumbing & Fire Const Co. | extend 19 existing sprinkler heads to pendents for new ceiling height. compliance with ordinance no. 155-13 not required.Details
extend 19 existing sprinkler heads to pendents for new ceiling height. compliance with ordinance no. 155-13 not required. | $4,000 |
| Apr 16, 2014 | Completed final sign-off Jun 2014 | 2299 Alameda St | Ewsf Inc. | tenant improvement of existing retail. no work in mech system. fire sprinkler and alarm sep permit. maher not required.Details
tenant improvement of existing retail. no work in mech system. fire sprinkler and alarm sep permit. maher not required. | $60,000 |
| Apr 11, 2014 | Never finaled issued Apr 2014, no final | 2299 Alameda St | Rago Neon Inc. | to install 3 internally illuminated wall signs reading eq3. n/a for the maher ordinance #155-13Details
to install 3 internally illuminated wall signs reading eq3. n/a for the maher ordinance #155-13 | $4,000 |
| Mar 10, 2014 | Completed final sign-off Jun 2014 | 2299 Alameda St | Ewsf Inc. | provide ada compliant flooring, repair work, install display units sheling;compliance with ord no 155-13 not requiredDetails
provide ada compliant flooring, repair work, install display units sheling;compliance with ord no 155-13 not required | $40,000 |
| Aug 18, 2008 | Completed final sign-off Nov 2008 | 2277 Alameda St | Arrow Sign Company | erect a single faced wall non-electric sign.Details
erect a single faced wall non-electric sign. | |
| Nov 15, 2005 | Expired or cancelled expired Mar 2007 | 2299 Alameda St | Sign & Sign Again | erect electric single faced wall signDetails
erect electric single faced wall sign | |
| Sep 1, 2005 | Never finaled issued Sep 2005, no final | 2299 Alameda St | Potter Fire Protection | add fire sprinklers in a warehouse corridor and restrooms.Details
add fire sprinklers in a warehouse corridor and restrooms. | $1,850 |
| Aug 18, 2005 | Completed final sign-off Aug 2005 | 2299 Alameda St | Pacific Coast Structures Inc | install warehouse shelving in exist stockroom on ground floor.Details
install warehouse shelving in exist stockroom on ground floor. | $18,000 |
| Aug 8, 2005 | Expired or cancelled expired Sep 2007 | 2299 Alameda St | non structural interior tenant improvement. new light fixtures, interior partitions. (e) heatingDetails
non structural interior tenant improvement. new light fixtures, interior partitions. (e) heating | $104,300 | |
| Aug 4, 2005 | Never finaled issued Aug 2005, no final | 2299 Alameda St | non structural demolition to expose condition of (e) building walls, ceiling, floor. sprinkler systDetails
non structural demolition to expose condition of (e) building walls, ceiling, floor. sprinkler syst | $7,500 | |
| May 11, 2004 | Never finaled issued May 2004, no final | 111 Potrero Av | streetspaceDetails
streetspace | ||
| Apr 1, 2004 | Never finaled issued Apr 2004, no final | 111 Potrero Av | street space permitDetails
street space permit | ||
| Dec 12, 2003 | Never finaled issued Dec 2003, no final | 2299 Alameda St | address assignmentDetails
address assignment | ||
| Dec 11, 2003 | Never finaled issued Dec 2003, no final | 2233 Alameda St | house numberDetails
house number | ||
| Dec 11, 2003 | Never finaled issued Dec 2003, no final | 138 Utah St | house numberDetails
house number | ||
| Dec 11, 2003 | Never finaled issued Dec 2003, no final | 2211 Alameda St | address assignmentDetails
address assignment | ||
| Dec 11, 2003 | Never finaled issued Dec 2003, no final | 168 Utah St | house numberDetails
house number | ||
| Dec 11, 2003 | Never finaled issued Dec 2003, no final | 2277 Alameda St | house numberDetails
house number | ||
| Dec 11, 2003 | Never finaled issued Dec 2003, no final | 128 Utah St | house numberDetails
house number | ||
| Nov 18, 2003 | Expired or cancelled cancelled Mar 2004 | 164 Utah St | Fire Innovation | fire alarm subpanel installation, new fire alarm devices in new area- 1st floorDetails
fire alarm subpanel installation, new fire alarm devices in new area- 1st floor | $1,700 |
| Oct 7, 2003 | Never finaled issued Oct 2003, no final | 111 Potrero Av | street spaceDetails
street space | ||
| Sep 29, 2003 | Never finaled issued Sep 2003, no final | 111 Potrero Av | street spaceDetails
street space | ||
| Jul 3, 2003 | Completed final sign-off Oct 2004 | 111 Potrero Av | provide seismic upgrade-section 3403.6 &1605.4.3 sf bc'2001Details
provide seismic upgrade-section 3403.6 &1605.4.3 sf bc'2001 | $325,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ewsf Inc. (5), Rago Neon Inc. (3), C C I Commercial Construction & Improv (2), Arrow Sign Company, Fire Innovation, Pacific Coast Structures Inc, Potter Fire Protection, Sign & Sign Again, Star Plumbing & Fire Const Co.
- Architects
- Dax Studio (2), Janet Crane (2), Don M Dacumos
- Engineers
- Albert Urrutia (3)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.