Permit GraphShortlistSan Francisco building permits since 2000

Block 3725, lot 007

198 05th St

City’s use
Commercial Misc
Built
1912
Stories
5
Units
9
Building
10,195 sq ft
Lot
2,099 sq ft
Zoning
RSD
Construction type
NA

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

12 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 24, 2022Never finaled
issued Jun 2022, no final
198 05th StExxell Corp. Dba Exxell Fire Systemsrevision to 2021 0917 8663. adding dwgs to show spaces. connecting a pipe & nozzle from an (e) ansill r-102 system (fire supression) to new exhaust system. roll: bmcd 9710
Details
Permit
202203240814
Status
issued
Filed
Mar 24, 2022
Permit issued
Jun 7, 2022
Declared cost
$500
Address
198 05th St

revision to 2021 0917 8663. adding dwgs to show spaces. connecting a pipe & nozzle from an (e) ansill r-102 system (fire supression) to new exhaust system. roll: bmcd 9710

Open the permit page

$500
Sep 17, 2021Never finaled
issued Nov 2021, no final
198 05th StLefco Increplace kitchen hvac equip in the chieftan pub. replace air make-up fan, & grease exhaust fan (on roof), & includes ancillary work such as the addition of "air-maid" grease exhaust attentuation device (in kitchen, next to the exhaust hood) & addition of grease duct inspection parts.
Details
Permit
202109178663
Status
issued
Filed
Sep 17, 2021
Permit issued
Nov 30, 2021
Declared cost
$90,000
Address
198 05th St

replace kitchen hvac equip in the chieftan pub. replace air make-up fan, & grease exhaust fan (on roof), & includes ancillary work such as the addition of "air-maid" grease exhaust attentuation device (in kitchen, next to the exhaust hood) & addition of grease duct inspection parts.

Open the permit page

$90,000
Sep 30, 2020Completed
final sign-off May 2021
194 05th StAu Electric Corporation/Aec Alarmsupgrade existing fire alarm system to comply with sffc 11.03.7.6.1 & nfpa 72
Details
Permit
202009305491
Status
complete
Filed
Sep 30, 2020
Permit issued
Oct 27, 2020
Final sign-off
May 7, 2021
Declared cost
$35,000
Address
194 05th St

upgrade existing fire alarm system to comply with sffc 11.03.7.6.1 & nfpa 72

Open the permit page

$35,000
May 21, 2019Completed
final sign-off Dec 2021
198 05th StSwinerton Builderstie backs extending under 198 5th street. documentation for tieback encroachment agreement only. n/a for maher. ref. permit #2019-0521-1281.
Details
Permit
201905211288
Status
complete
Filed
May 21, 2019
Permit issued
Aug 8, 2019
Final sign-off
Dec 2, 2021
Address
198 05th St

tie backs extending under 198 5th street. documentation for tieback encroachment agreement only. n/a for maher. ref. permit #2019-0521-1281.

Open the permit page

Dec 12, 2018Never finaled
filed Dec 2018, never issued
906 Howard Stinstall tpo roof membrane. all new flashings. remove existing. flat roof. no additions or subtractions.
Details
Permit
201812128110
Status
filed
Filed
Dec 12, 2018
Address
906 Howard St

install tpo roof membrane. all new flashings. remove existing. flat roof. no additions or subtractions.

Open the permit page

Dec 12, 2018Completed
final sign-off Jan 2019
906 Howard StMike Mccurdy Roofing Increroofing
Details
Permit
201812128115
Status
complete
Filed
Dec 12, 2018
Permit issued
Dec 12, 2018
Final sign-off
Jan 28, 2019
Declared cost
$33,000
Address
906 Howard St

reroofing

Open the permit page

$33,000
Oct 28, 2013Never finaled
issued Oct 2013, no final
906 Howard Ststreet space and mta parking
Details
Permit
M438968
Status
issued
Filed
Oct 28, 2013
Permit issued
Oct 28, 2013
Address
906 Howard St

street space and mta parking

Open the permit page

Aug 26, 2013Completed
final sign-off Apr 2014
906 Howard StAmerican Home Renewal Increplacing windows with milgard wood clad/ulta windows. u-factor equal or less than .4
Details
Permit
201308265253
Status
complete
Filed
Aug 26, 2013
Permit issued
Aug 26, 2013
Final sign-off
Apr 16, 2014
Declared cost
$65,000
Address
906 Howard St

replacing windows with milgard wood clad/ulta windows. u-factor equal or less than .4

Open the permit page

$65,000
Feb 3, 2009Never finaled
issued Feb 2009, no final
198 05th StExxell Corp. Dba Exxell Fire Systems1st/fl. ul 300 upgrade of fire suppression system at hood/kitchen area.
Details
Permit
200902031283
Status
issued
Filed
Feb 3, 2009
Permit issued
Feb 3, 2009
Declared cost
$4,500
Address
198 05th St

1st/fl. ul 300 upgrade of fire suppression system at hood/kitchen area.

Open the permit page

$4,500
Aug 15, 2008Never finaled
issued Aug 2008, no final
198 05th Ststreet space permit
Details
Permit
M130907
Status
issued
Filed
Aug 15, 2008
Permit issued
Aug 15, 2008
Address
198 05th St

street space permit

Open the permit page

Aug 14, 2006Never finaled
issued Aug 2006, no final
906 Howard Ststreet space & sidewalk permit
Details
Permit
M39016
Status
issued
Filed
Aug 14, 2006
Permit issued
Aug 14, 2006
Address
906 Howard St

street space & sidewalk permit

Open the permit page

Nov 14, 2000Completed
final sign-off Mar 2001
198 05th Stremoval of all interior moulding,panels,floor covering
Details
Permit
200011145610
Status
complete
Filed
Nov 14, 2000
Permit issued
Nov 14, 2000
Final sign-off
Mar 1, 2001
Declared cost
$70,000
Address
198 05th St

removal of all interior moulding,panels,floor covering

Open the permit page

$70,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Exxell Corp. Dba Exxell Fire Systems (2), American Home Renewal Inc, Au Electric Corporation/Aec Alarms, Lefco Inc, Mike Mccurdy Roofing Inc, Swinerton Builders
Engineers
E.S. Lindquist, Meng Hsiu Chen
Authorized agent-otherss
Roger Tsai

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.