Block 3711, lot 012
77 Beale St
- City’s use
- Commercial Office
- Lot
- 6,255 sq ft
- Zoning
- C3O
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
54 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 3, 2009 | Completed final sign-off Aug 2009 | 77 Beale St | R L H Fire Protection Inc | basement - t.i. upgrade of (e) fire sprinkler system. relocate 5 pendent heads, delete 1 and add 3 pendent heads.Details
basement - t.i. upgrade of (e) fire sprinkler system. relocate 5 pendent heads, delete 1 and add 3 pendent heads. | $2,000 |
| Apr 30, 2009 | Completed final sign-off Jul 2009 | 77 Beale St | Paradigm General Contractors | basement room 1 bo7 reconfiguration - add partition walls & door.Details
basement room 1 bo7 reconfiguration - add partition walls & door. | $42,000 |
| Apr 20, 2009 | Expired or cancelled cancelled Jan 2026 | 77 Beale St | electrical, mechanical & life safety drawings. (none sprinkler needed). ref. appl.#20061120/8134.Details
electrical, mechanical & life safety drawings. (none sprinkler needed). ref. appl.#20061120/8134. | $120,000 | |
| Apr 9, 2009 | Completed final sign-off Aug 2009 | 77 Beale St | R L H Fire Protection Inc | upgrade fire sprinkler system to comply with high rise sprinkler ordinance #377-93. relocate 37 heads and 74 heads (121 total: 29 relocate, 50 add, 16 relocate, 24 add, 2 relocate).Details
upgrade fire sprinkler system to comply with high rise sprinkler ordinance #377-93. relocate 37 heads and 74 heads (121 total: 29 relocate, 50 add, 16 relocate, 24 add, 2 relocate). | $25,000 |
| Apr 2, 2009 | Completed final sign-off Apr 2009 | 77 Beale St | Siemens Industry, Inc. | at 3rd fl: addition of 1 strobe, onto the existing life safety system, for the break room within the "p g & e" space on floor 3.Details
at 3rd fl: addition of 1 strobe, onto the existing life safety system, for the break room within the "p g & e" space on floor 3. | $900 |
| Mar 23, 2009 | Completed final sign-off Apr 2009 | 77 Beale St | Ayoob & Peery Plumbing Co Inc | relocate and remove fire sprinklers per tenat improvement (2 relocate, 1 removal)Details
relocate and remove fire sprinklers per tenat improvement (2 relocate, 1 removal) | $300 |
| Mar 19, 2009 | Never finaled issued Mar 2009, no final | 77 Beale St | Sabah International Incorporated | basement: install new inergen fire supression system for 1 sl8500 tape library, storage tek unitDetails
basement: install new inergen fire supression system for 1 sl8500 tape library, storage tek unit | $30,000 |
| Feb 4, 2009 | Never finaled issued Mar 2009, no final | 77 Beale St | Paradigm General Contractors | b1 (basement) level data center - life safety upgrade. as built for appl#200612190078, 200812057933.Details
b1 (basement) level data center - life safety upgrade. as built for appl#200612190078, 200812057933. | $10,000 |
| Dec 16, 2008 | Completed final sign-off Apr 2009 | 77 Beale St | Richlen Construction | 3rd floor: addition of new break room on 3rd floor, 228 sf. hvac, plumbing, sprinklers to be design build - under separate permit.Details
3rd floor: addition of new break room on 3rd floor, 228 sf. hvac, plumbing, sprinklers to be design build - under separate permit. | $50,000 |
| Dec 5, 2008 | Never finaled issued Dec 2008, no final | 77 Beale St | C B 2 Builders Incorporated | level b1 data center upgrade life safety to obtain final inspection. for work approved under pa#200612190078. all work has been completed.Details
level b1 data center upgrade life safety to obtain final inspection. for work approved under pa#200612190078. all work has been completed. | |
| Nov 14, 2008 | Completed final sign-off Apr 2009 | 77 Beale St | Richlen Construction | new non-rated security partitions & doors, new electrical power poles, repair damaged ceiling tilesDetails
new non-rated security partitions & doors, new electrical power poles, repair damaged ceiling tiles | $100,000 |
| Aug 22, 2008 | Never finaled issued Aug 2008, no final | 77 Beale St | Paradigm General Contractors | add closet with 2 new walls at 29th floor. arch. ti under pa# 2007.09.27.3940Details
add closet with 2 new walls at 29th floor. arch. ti under pa# 2007.09.27.3940 | $2,000 |
| Mar 31, 2008 | Completed final sign-off Apr 2008 | 77 Beale St | C B 2 Builders Incorporated | add 1 strobe on b1 floor. the strobe is going to tie into existing circuit a14 on the floor.Details
add 1 strobe on b1 floor. the strobe is going to tie into existing circuit a14 on the floor. | $5,000 |
| Feb 6, 2008 | Completed final sign-off Apr 2008 | 77 Beale St | Ayoob & Peery Plumbing Co Inc | ground floor-relocate fire sprinkler heads per tenant improvements-total 2 heads relocatedDetails
ground floor-relocate fire sprinkler heads per tenant improvements-total 2 heads relocated | $800 |
| Jan 29, 2008 | Never finaled issued Jan 2008, no final | 77 Beale St | R L H Fire Protection Inc | 21st floor - t.i. upgrade on (e) fire sprinkler system for suite 2135, relocate 2 heads.Details
21st floor - t.i. upgrade on (e) fire sprinkler system for suite 2135, relocate 2 heads. | $400 |
| Jan 15, 2008 | Completed final sign-off Apr 2008 | 77 Beale St | C B 2 Builders Incorporated | 3rd floor: revision to application 200706224839 - show fire rated partition @ corridor, finish schedule @ restrooms, fire smoke specs. clarifications for finishes.Details
3rd floor: revision to application 200706224839 - show fire rated partition @ corridor, finish schedule @ restrooms, fire smoke specs. clarifications for finishes. | $2,000 |
| Jan 10, 2008 | Never finaled issued Jan 2008, no final | 77 Beale St | Paradigm General Contractors | revision to p.a. 2006/09/13/2477 for no longer installation of panic bar hardware at exit doors. not required by code. (delete panic hardware)Details
revision to p.a. 2006/09/13/2477 for no longer installation of panic bar hardware at exit doors. not required by code. (delete panic hardware) | |
| Jan 10, 2008 | Never finaled issued Jan 2008, no final | 77 Beale St | Paradigm General Contractors | renew app#2006/09/15/2475 for final insp.Details
renew app#2006/09/15/2475 for final insp. | |
| Jan 4, 2008 | Completed final sign-off Jan 2008 | 77 Beale St | Paradigm General Contractors | renew pa#200510216177 for final inspection.Details
renew pa#200510216177 for final inspection. | |
| Dec 21, 2007 | Completed final sign-off Apr 2008 | 77 Beale St | Young Electric Co | finish & install: 2 speackers, 2 strobes, 3 duck smoke detectors and connections to 3 fire smoke dampers.Details
finish & install: 2 speackers, 2 strobes, 3 duck smoke detectors and connections to 3 fire smoke dampers. | $10,400 |
| Dec 19, 2007 | Completed final sign-off Jan 2008 | 77 Beale St | revision to pa# 2007/07/03/5862. delete construction of new ramp, a pair of 3'-0" doors and remove security office from scope of work.Details
revision to pa# 2007/07/03/5862. delete construction of new ramp, a pair of 3'-0" doors and remove security office from scope of work. | ||
| Dec 18, 2007 | Expired or cancelled expired Oct 2010 | 77 Beale St | 29th floor. new non-structural partitions, new & relocated doors. (electrical & mechanical under separate permit). no life safety or sprinkler work.Details
29th floor. new non-structural partitions, new & relocated doors. (electrical & mechanical under separate permit). no life safety or sprinkler work. | $23,400 | |
| Dec 18, 2007 | Completed final sign-off Jan 2008 | 77 Beale St | C B 2 Builders Incorporated | installation of new fire/life safety devices for b1 data roomDetails
installation of new fire/life safety devices for b1 data room | $150,000 |
| Dec 11, 2007 | Never finaled issued Dec 2007, no final | 77 Beale St | Paradigm General Contractors | 21st floor, add 1 wall to divide 1 office into 2, add 2 doors- sprinklers separate permits...Details
21st floor, add 1 wall to divide 1 office into 2, add 2 doors- sprinklers separate permits... | $30,000 |
| Nov 19, 2007 | Expired or cancelled expired Oct 2010 | 77 Beale St | 7th floor: construction of (3) new offices ( non-structural partitions) including restroom upgrades and signage for disabled access.Details
7th floor: construction of (3) new offices ( non-structural partitions) including restroom upgrades and signage for disabled access. | $39,800 | |
| Nov 13, 2007 | Never finaled issued Nov 2007, no final | 77 Beale St | Ayoob & Peery Plumbing Co Inc | 3rd floor - relocate (21) fire sprinkler heads per tenant improvement.Details
3rd floor - relocate (21) fire sprinkler heads per tenant improvement. | $4,500 |
| Nov 6, 2007 | Completed final sign-off Jan 2008 | 77 Beale St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler heads per tenant improvement, total 8 headsDetails
relocate fire sprinkler heads per tenant improvement, total 8 heads | $3,820 |
| Sep 27, 2007 | Completed final sign-off Feb 2008 | 77 Beale St | revision #1-remove (e) low conc. wall. -add new railing to match (e). -canopy is wider and longer w/ new 4 post base revision to appl.# 2006/0913/2157Details
revision #1-remove (e) low conc. wall. -add new railing to match (e). -canopy is wider and longer w/ new 4 post base revision to appl.# 2006/0913/2157 | $25,000 | |
| Sep 5, 2007 | Expired or cancelled expired Oct 2010 | 77 Beale St | C B 2 Builders Incorporated | 32nd floor - mechancial - relocate (4) supply, (2)return ducts : diffusers in restrooms, remove (2) return grills, install (5) new fire/smoke dampers, demo some (e) ductwork.Details
32nd floor - mechancial - relocate (4) supply, (2)return ducts : diffusers in restrooms, remove (2) return grills, install (5) new fire/smoke dampers, demo some (e) ductwork. | $20,000 |
| Aug 30, 2007 | Never finaled issued Aug 2007, no final | 77 Beale St | Young Electric Co | 32/f- fire alarm system modifications required due to restroom, corridor and elecavor lobby renovations. 1 power supply, 6 smk.det., 1 tri mod., 5 duct det., 12 strobes, 12 speakers, 4 door holdersDetails
32/f- fire alarm system modifications required due to restroom, corridor and elecavor lobby renovations. 1 power supply, 6 smk.det., 1 tri mod., 5 duct det., 12 strobes, 12 speakers, 4 door holders | $59,695 |
| Jul 3, 2007 | Completed final sign-off Jan 2008 | 77 Beale St | remove wall to make larger office. , adding demising wall, adding wall for small office., adding security door at rated corriordor, adding new accessible raqmp., upgrade mens & womens toilets for accessible.Details
remove wall to make larger office. , adding demising wall, adding wall for small office., adding security door at rated corriordor, adding new accessible raqmp., upgrade mens & womens toilets for accessible. | $50,000 | |
| Jun 22, 2007 | Completed final sign-off Apr 2008 | 77 Beale St | add 1 hr. rated corridor, add men's & women (accessible) toilet, add security exit gate, plumbing, electrical - less than 50% of the change.Details
add 1 hr. rated corridor, add men's & women (accessible) toilet, add security exit gate, plumbing, electrical - less than 50% of the change. | $350,000 | |
| May 3, 2007 | Never finaled issued May 2007, no final | 77 Beale St | C B 2 Builders Incorporated | oti-2 32nd floor elDetails
oti-2 32nd floor el | $40,000 |
| Jan 5, 2007 | Expired or cancelled expired Oct 2010 | 77 Beale St | C B 2 Builders Incorporated | oti-1, 32nd floor, pg & e, el, ls, spDetails
oti-1, 32nd floor, pg & e, el, ls, sp | $337,000 |
| Dec 19, 2006 | Expired or cancelled expired Oct 2010 | 77 Beale St | Paradigm General Contractors | level b1 data center upgrade life safetyDetails
level b1 data center upgrade life safety | $200,000 |
| Nov 20, 2006 | Expired or cancelled expired Oct 2010 | 77 Beale St | oti-1 20th floor el me lsDetails
oti-1 20th floor el me ls | $315,000 | |
| Oct 17, 2006 | Expired or cancelled expired Jan 2008 | 77 Beale St | Paradigm General Contractors | to renew pa# 2005/10/21/6177. to continue & complete work.Details
to renew pa# 2005/10/21/6177. to continue & complete work. | $500 |
| Sep 15, 2006 | Expired or cancelled expired Oct 2010 | 77 Beale St | oti-1, 26th floor, el, lsDetails
oti-1, 26th floor, el, ls | $94,200 | |
| Sep 15, 2006 | Expired or cancelled expired Oct 2010 | 77 Beale St | Paradigm General Contractors | oti-2, 26th floor, el, meDetails
oti-2, 26th floor, el, me | $10,000 |
| Sep 13, 2006 | Completed final sign-off Feb 2008 | 77 Beale St | Paradigm General Contractors | re-stripping @ garage levels, no chage in no of parking, signage., new van access, ble parking canopyDetails
re-stripping @ garage levels, no chage in no of parking, signage., new van access, ble parking canopy | $50,000 |
| Jan 5, 2006 | Completed final sign-off Jan 2006 | 77 Beale St | R L H Fire Protection Inc | fire sprinkler difiency correction, add 2 heads in exhaust hood on 3/fDetails
fire sprinkler difiency correction, add 2 heads in exhaust hood on 3/f | $500 |
| Dec 16, 2005 | Never finaled issued Dec 2005, no final | 77 Beale St | Acco Engineered Systems Inc. Dba Acco En | replacement of (e) computer room air conditioning units (acu's) with built in smoke detector and emergency interlock shsut off - also verify (e) below floor smoke detectors - two locationsDetails
replacement of (e) computer room air conditioning units (acu's) with built in smoke detector and emergency interlock shsut off - also verify (e) below floor smoke detectors - two locations | $10,000 |
| Oct 21, 2005 | Expired or cancelled expired Jan 2008 | 77 Beale St | Paradigm General Contractors | add wall to (e) office, sprinkler & alarm (fire)under seperate permit if necessaryDetails
add wall to (e) office, sprinkler & alarm (fire)under seperate permit if necessary | $1,200 |
| Oct 28, 2004 | Expired or cancelled expired Feb 2007 | 77 Beale St | Paradigm General Contractors | emergency generator replacement in kind, 4th floor penthouse. piping under separate application.Details
emergency generator replacement in kind, 4th floor penthouse. piping under separate application. | $550,000 |
| Dec 2, 2003 | Expired or cancelled expired Nov 2005 | 77 Beale St | Paradigm General Contractors | request permit in lieu of expired oti-1 #200 009059633for final sign off. no exterior work. work haDetails
request permit in lieu of expired oti-1 #200 009059633for final sign off. no exterior work. work ha | |
| Dec 2, 2003 | Expired or cancelled expired Nov 2005 | 77 Beale St | Paradigm General Contractors | request permit in lieu of expired oti-2 #200110150800 for final sign off. no exterior work. work haDetails
request permit in lieu of expired oti-2 #200110150800 for final sign off. no exterior work. work ha | |
| Aug 14, 2003 | Completed final sign-off Mar 2004 | 77 Beale St | Paradigm General Contractors | oti-1 29th flr, elec,mech, ls, sprinklersDetails
oti-1 29th flr, elec,mech, ls, sprinklers | $65,000 |
| Nov 13, 2002 | Expired or cancelled expired Aug 2006 | 77 Beale St | Paradigm General Contractors | add speaker/strobes to (e) fire system on the bi level, 8 devices total no increase in office spaceDetails
add speaker/strobes to (e) fire system on the bi level, 8 devices total no increase in office space | $50,000 |
| Oct 15, 2001 | Expired or cancelled expired Nov 2003 | 77 Beale St | Paradigm General Contractors | oti-2 26th fl meDetails
oti-2 26th fl me | $3,000 |
| Sep 20, 2000 | Expired or cancelled expired Nov 2003 | 77 Beale St | Acker & Guerrero Roof Co | reroofingDetails
reroofing | $45,405 |
| Feb 17, 2000 | Completed final sign-off Oct 2000 | 77 Beale St | Paradigm General Contractors | install addit'l strobes speakers & smoke detectorsDetails
install addit'l strobes speakers & smoke detectors | $65,500 |
| Feb 14, 2000 | Completed final sign-off Oct 2000 | 77 Beale St | additional strobes,speakers & strobe detectorsDetails
additional strobes,speakers & strobe detectors | $42,000 | |
| Jan 31, 2000 | Completed final sign-off Oct 2000 | 77 Beale St | Paradigm General Contractors | install add'l strobes speakers & smoke detectorsDetails
install add'l strobes speakers & smoke detectors | $42,000 |
| Jan 14, 2000 | Completed final sign-off Jan 2001 | 77 Beale St | Paradigm General Contractors | oti-1 el ls 23rd floorDetails
oti-1 el ls 23rd floor | $50,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Paradigm General Contractors (21), C B 2 Builders Incorporated (7), Ayoob & Peery Plumbing Co Inc (4), R L H Fire Protection Inc (4), Richlen Construction (2), Young Electric Co (2), Acco Engineered Systems Inc. Dba Acco En, Acker & Guerrero Roof Co, Sabah International Incorporated, Siemens Industry, Inc.
- Architects
- Charles Beavers (4), George Nam Kung, Interactive Resources, Jon Toby, Thomas Earle Ramsey, Wynn Newton
- Engineers
- Dennis Cheung, Siemens Building Technologies, Wynn Newton
- Authorized agent-otherss
- Jose We (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.