Block 3563, lot 023
2399 Market St
- City’s use
- Commercial Misc
- Built
- 1958
- Stories
- 1
- Rooms
- 2 bathrooms
- Lot
- 5,140 sq ft
- Zoning
- UPMKT
- Construction type
- S
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 15, 2008 | Expired or cancelled cancelled Jul 2012 | 2399 Market St | remove illegal signs inspected by fuel outdoor, 2 locations, 4 total. remove sign only. not (e) pole support.Details
remove illegal signs inspected by fuel outdoor, 2 locations, 4 total. remove sign only. not (e) pole support. | $1,000 | |
| Dec 12, 2008 | Never finaled issued Dec 2008, no final | 2399 Market St | Sign Designs Inc. | replace illuminated sign face, wall and double faced sign.Details
replace illuminated sign face, wall and double faced sign. | $500 |
| Dec 12, 2008 | Never finaled issued Dec 2008, no final | 2399 Market St | Sign Designs Inc. | to erect single faced, wall, electric sign.Details
to erect single faced, wall, electric sign. | $2,000 |
| Nov 12, 2008 | Completed final sign-off Dec 2008 | 2399 Market St | revision to pa #200807015751, removed existing wall, remove 1 post and remain existing post. replace demoed wall headers w/ new beam, demoed wall was a shearwall, moved to proposed 1 hr wall, new header @ entrance doors.Details
revision to pa #200807015751, removed existing wall, remove 1 post and remain existing post. replace demoed wall headers w/ new beam, demoed wall was a shearwall, moved to proposed 1 hr wall, new header @ entrance doors. | $1,000 | |
| Oct 22, 2008 | Completed final sign-off Dec 2008 | 2399 Market St | revision to pa #200807015751, keep existing mechanical system, adequlate ventilation through new doors. if new ducts are used insulate as needed. existing mechanical equipment to use requires as proposed in previous mech. dwg.Details
revision to pa #200807015751, keep existing mechanical system, adequlate ventilation through new doors. if new ducts are used insulate as needed. existing mechanical equipment to use requires as proposed in previous mech. dwg. | ||
| Jul 1, 2008 | Completed final sign-off Dec 2008 | 2399 Market St | expand (e) retail space into (e) auto repair bay, upgrade bathrm & entry for accessibility requiremts,infill (e) door @ bath, front (e) single door to double door. upgrade (e) mech & lighting, install walk-in cooler, display cases & cabinets for retail space.Details
expand (e) retail space into (e) auto repair bay, upgrade bathrm & entry for accessibility requiremts,infill (e) door @ bath, front (e) single door to double door. upgrade (e) mech & lighting, install walk-in cooler, display cases & cabinets for retail space. | $53,000 | |
| Nov 22, 2005 | Never finaled issued Nov 2005, no final | 2395 Market St | sidewalkDetails
sidewalk | ||
| Feb 26, 2002 | Expired or cancelled expired Jun 2002 | 2395 Market St | sidewalk repair permitDetails
sidewalk repair permit |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Sign Designs Inc. (2)
- Architects
- Erick Fong (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.