Permits filed here
45 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 26, 2022 | Completed final sign-off Jun 2023 | 106 Sanchez St | Au Electric Corporation/Aec Alarms | upgrade (e) fire alarm system by installing new lf sounders (wireless) in all sleeping areas (for 1103.7.6.1 compliance)Details
upgrade (e) fire alarm system by installing new lf sounders (wireless) in all sleeping areas (for 1103.7.6.1 compliance) | $30,000 |
| Apr 6, 2021 | Completed final sign-off Nov 2021 | 106 Sanchez St | B-Side Inc. | unit 15 - remodel 1 bath and 1 kitchen. replace washer/dryer at exisitng location. no change of layout of walls and openings.Details
unit 15 - remodel 1 bath and 1 kitchen. replace washer/dryer at exisitng location. no change of layout of walls and openings. | $25,000 |
| Jan 8, 2021 | Completed final sign-off Dec 2021 | 106 Sanchez St | B-Side Inc. | unit 9 - convert existing kitchen to study. relocate kitchen. rehabilitate existing bathroom. install washer/dryerDetails
unit 9 - convert existing kitchen to study. relocate kitchen. rehabilitate existing bathroom. install washer/dryer | $40,000 |
| Jan 7, 2021 | Never finaled issued Jan 2021, no final | 106 Sanchez St | B-Side Inc. | unit #9: rehab bathroom & kitchenDetails
unit #9: rehab bathroom & kitchen | $25,000 |
| Nov 6, 2020 | Never finaled issued Nov 2020, no final | 106 Sanchez St | B-Side Inc. | unit# 9 - replace washer/dryer, upgrade line. no structural work, no moving walls.Details
unit# 9 - replace washer/dryer, upgrade line. no structural work, no moving walls. | $5,000 |
| Sep 2, 2020 | Completed final sign-off Dec 2020 | 106 Sanchez St | B-Side Inc. | unit #11: rehab bathroom,kitchen in kind. replace washer & dryer.no structtural work, no walls to be removed.Details
unit #11: rehab bathroom,kitchen in kind. replace washer & dryer.no structtural work, no walls to be removed. | $36,000 |
| Aug 13, 2020 | Never finaled issued Aug 2020, no final | 106 Sanchez St | B-Side Inc. | unit# 8 - replace washer/dryer. upgrade line.Details
unit# 8 - replace washer/dryer. upgrade line. | $5,000 |
| Aug 6, 2020 | Completed final sign-off Apr 2021 | 106 Sanchez St | B-Side Inc. | #16: 1) relocate bedroom. 2) convert extg kitchen to bedroom. 3)relocate kitchen. 4)rehabilitate extg bathroom. 5) install washer and dryer.Details
#16: 1) relocate bedroom. 2) convert extg kitchen to bedroom. 3)relocate kitchen. 4)rehabilitate extg bathroom. 5) install washer and dryer. | $40,000 |
| Dec 26, 2019 | Never finaled issued Dec 2019, no final | 106 Sanchez St | street spaceDetails
street space | ||
| Oct 25, 2019 | Never finaled issued Dec 2019, no final | 106 Sanchez St | B-Side Inc. | unit 14 - convert (e) kitchen to bedroom; relocate kitchen, rehabilitate (e) bathroom and install washer/dryerDetails
unit 14 - convert (e) kitchen to bedroom; relocate kitchen, rehabilitate (e) bathroom and install washer/dryer | $38,000 |
| Jun 21, 2019 | Never finaled issued Jun 2019, no final | 106 Sanchez St | B-Side Inc. | unit 4: install washer/dryer at existing kitchen, ventless 120v. discharge to approved plumbing fixture.Details
unit 4: install washer/dryer at existing kitchen, ventless 120v. discharge to approved plumbing fixture. | $4,000 |
| Jun 14, 2019 | Never finaled issued Jul 2019, no final | 106 Sanchez St | B-Side Inc. | apt #17: convert (e) kitchen to study rm, convert (e) living rm to bedroom, (e)bedroom to living. relocate kitchen, rehabilitate (e) bathroom, install washer & dryer.Details
apt #17: convert (e) kitchen to study rm, convert (e) living rm to bedroom, (e)bedroom to living. relocate kitchen, rehabilitate (e) bathroom, install washer & dryer. | $45,000 |
| Mar 12, 2019 | Never finaled issued Mar 2019, no final | 106 Sanchez St | B-Side Inc. | unit #10: installl ventless 110 washer/dryer and a dishwasher in kichen. no change of (e) floor plan. maher n/aDetails
unit #10: installl ventless 110 washer/dryer and a dishwasher in kichen. no change of (e) floor plan. maher n/a | $4,000 |
| Jul 6, 2018 | Never finaled issued Jul 2018, no final | 106 Sanchez St | Brighter Bay Builders Inc | street spaceDetails
street space | |
| Jun 26, 2018 | Never finaled issued Jun 2018, no final | 106 Sanchez St | street spaceDetails
street space | ||
| Apr 20, 2018 | Completed final sign-off Aug 2018 | 106 Sanchez St | Brighter Bay Builders Inc | unit 12 - rehabilitate (e) bathroom and kitchen, install washer/dryerDetails
unit 12 - rehabilitate (e) bathroom and kitchen, install washer/dryer | $30,000 |
| Apr 13, 2018 | Completed final sign-off Aug 2018 | 106 Sanchez St | Brighter Bay Builders Inc | unit 7: rehabilitate e kitchen, rehabilitate e bathroom, install washer/dryer. maher ord 155-13 naDetails
unit 7: rehabilitate e kitchen, rehabilitate e bathroom, install washer/dryer. maher ord 155-13 na | $28,000 |
| Jul 6, 2017 | Never finaled issued Jul 2017, no final | 106 Sanchez St | street spaceDetails
street space | ||
| Jul 6, 2016 | Completed final sign-off Jun 2018 | 106 Sanchez St | soft story retrofit per sfbc chapter 34b, 2012 iebc appedix a-4. n/a maher ordinanceDetails
soft story retrofit per sfbc chapter 34b, 2012 iebc appedix a-4. n/a maher ordinance | $50,000 | |
| Dec 11, 2015 | Completed final sign-off Mar 2016 | 106 Sanchez St | Malagic Construction | #14: replace old kitchen cabinets, new counter top, new tile floor. new bathroom floor and shower tile. no structural work. no change to wall or fixture locations.Details
#14: replace old kitchen cabinets, new counter top, new tile floor. new bathroom floor and shower tile. no structural work. no change to wall or fixture locations. | $10,000 |
| Feb 11, 2014 | Completed final sign-off Apr 2014 | 106 Sanchez St | Malagic Construction | #4- replace kitchen counter, new tile floor, new bath tile & floor tile. no structural work.Details
#4- replace kitchen counter, new tile floor, new bath tile & floor tile. no structural work. | $3,500 |
| Aug 21, 2013 | Completed final sign-off Aug 2013 | 106 Sanchez St | Schoepp Construction Inc | revision to pa# 201301248730. reduce scope of work to: no change of 2 windows at (e) bedroom where facing to street only replace one winodw at (n) bedroom per approved plans.Details
revision to pa# 201301248730. reduce scope of work to: no change of 2 windows at (e) bedroom where facing to street only replace one winodw at (n) bedroom per approved plans. | |
| May 8, 2013 | Completed final sign-off Jul 2013 | 106 Sanchez St | Schoepp Construction Inc | relocate mailbox from outside to inside. line mailbox opening with 5/8" type x gypsum board.Details
relocate mailbox from outside to inside. line mailbox opening with 5/8" type x gypsum board. | $2,800 |
| Feb 12, 2013 | Never finaled issued Feb 2013, no final | 106 Sanchez St | street spaceDetails
street space | ||
| Jan 24, 2013 | Completed final sign-off Aug 2013 | 106 Sanchez St | Schoepp Construction Inc | all work in unit#3. revision to pa#2012-1115-4299. new lighting plan for modified space. remodel bath. relocate kitchen. convert (e) kitchen into (n) bedroom. (n) washer/dryer. replace window (2) windows in bedroom and (1) window in the kitchen. replace 3 windowsDetails
all work in unit#3. revision to pa#2012-1115-4299. new lighting plan for modified space. remodel bath. relocate kitchen. convert (e) kitchen into (n) bedroom. (n) washer/dryer. replace window (2) windows in bedroom and (1) window in the kitchen. replace 3 windows | $20,000 |
| Jan 18, 2013 | Completed final sign-off May 2013 | 106 Sanchez St | Schoepp Construction Inc | all work in unit #18:remodel kitchen and bath. add/remove interior walls. new lighting plan and dryer.Details
all work in unit #18:remodel kitchen and bath. add/remove interior walls. new lighting plan and dryer. | $16,000 |
| Nov 21, 2012 | Expired or cancelled expired Feb 2016 | 106 Sanchez St | Schoepp Construction Inc | unit #3-remodel kitchen & 2 bathrooms-countertop, cabients & sink. bathroom-toilet, vanity & sinkDetails
unit #3-remodel kitchen & 2 bathrooms-countertop, cabients & sink. bathroom-toilet, vanity & sink | $10,000 |
| Nov 15, 2012 | Expired or cancelled expired Feb 2016 | 106 Sanchez St | Schoepp Construction Inc | remodel kitchen & bath in unit #3, coutertops, cabinets,sink (kitchen) toilet,sink vanity in bathroom lighting must comply w/150 (k) no windows or doors on this permit,Details
remodel kitchen & bath in unit #3, coutertops, cabinets,sink (kitchen) toilet,sink vanity in bathroom lighting must comply w/150 (k) no windows or doors on this permit, | $10,000 |
| Oct 26, 2012 | Completed final sign-off Nov 2012 | 106 Sanchez St | Liberty Fire Systems Inc | install dc backflow device on existing trash chute fire sprinkler system.Details
install dc backflow device on existing trash chute fire sprinkler system. | $900 |
| Aug 2, 2012 | Completed final sign-off May 2013 | 106 Sanchez St | Schoepp Construction Inc | #6: remodel kitchen/bath- countertops, cabinets, sink @ kitchen. toilet, sink, vanity @ bath. no lighting change.Details
#6: remodel kitchen/bath- countertops, cabinets, sink @ kitchen. toilet, sink, vanity @ bath. no lighting change. | $15,000 |
| Apr 3, 2012 | Completed final sign-off Jul 2012 | 106 Sanchez St | C Green Consulting Dba Anchway Property | revision to pa# 2011-1025-7551-change location of post in garage & use (4) #4 rebars instead of (3) #5'sDetails
revision to pa# 2011-1025-7551-change location of post in garage & use (4) #4 rebars instead of (3) #5's | |
| Oct 25, 2011 | Completed final sign-off Jul 2012 | 106 Sanchez St | C Green Consulting Dba Anchway Property | unit #5-kitchen remodel, remove wall & add washer & dryerDetails
unit #5-kitchen remodel, remove wall & add washer & dryer | $22,000 |
| Oct 14, 2011 | Expired or cancelled expired Feb 2016 | 106 Sanchez St | C Green Consulting Dba Anchway Property | revision to pa# 201109084093. add skylight, added detail as per inspection requestDetails
revision to pa# 201109084093. add skylight, added detail as per inspection request | $2,500 |
| Sep 8, 2011 | Expired or cancelled expired Feb 2016 | 106 Sanchez St | C Green Consulting Dba Anchway Property | unit #16-revision to pa# 2011-0616-8301-move kitchen to family room, remove non bearing wallsDetails
unit #16-revision to pa# 2011-0616-8301-move kitchen to family room, remove non bearing walls | $6,000 |
| Jun 16, 2011 | Expired or cancelled expired Feb 2016 | 106 Sanchez St | C Green Consulting Dba Anchway Property | work on #16 - remodel existing kitchen and bathroom, repair existing walls.Details
work on #16 - remodel existing kitchen and bathroom, repair existing walls. | $18,000 |
| May 9, 2011 | Completed final sign-off Jun 2011 | 106 Sanchez St | Arcon Construction Corp | apt. # 8 ---remodel (e) kitchen & bathroom. add electrical sub-panel, painting. no doors, walls, windows under this permitDetails
apt. # 8 ---remodel (e) kitchen & bathroom. add electrical sub-panel, painting. no doors, walls, windows under this permit | $5,000 |
| Apr 8, 2011 | Completed final sign-off Apr 2011 | 106 Sanchez St | C Green Consulting Dba Anchway Property | install plywood along garage area on the face of the cripple wall 3 ft. high x 100 lf.Details
install plywood along garage area on the face of the cripple wall 3 ft. high x 100 lf. | $1,000 |
| Apr 4, 2011 | Completed final sign-off Apr 2011 | 106 Sanchez St | C Green Consulting Dba Anchway Property | all repair work to be done in kind, install grade beam as epr inspection direction, repair dry rotDetails
all repair work to be done in kind, install grade beam as epr inspection direction, repair dry rot | $1,500 |
| Mar 21, 2011 | Never finaled issued Mar 2011, no final | 106 Sanchez St | street spaceDetails
street space | ||
| Mar 18, 2011 | Expired or cancelled expired Feb 2016 | 106 Sanchez St | C Green Consulting Dba Anchway Property | to comply with nov 2004 53831 dated 9/22/2004Details
to comply with nov 2004 53831 dated 9/22/2004 | $6,000 |
| Mar 10, 2011 | Completed final sign-off Mar 2011 | 106 Sanchez St | C Green Consulting Dba Anchway Property | to comply with nov 200344789 repair less than 50%; central stairs used as emergency egress, maintain egress at all timesDetails
to comply with nov 200344789 repair less than 50%; central stairs used as emergency egress, maintain egress at all times | $1,000 |
| Feb 22, 2011 | Completed final sign-off Apr 2011 | 106 Sanchez St | C Green Consulting Dba Anchway Property | remove & replace driveway, 756sf. repair garage floor partially. (in-kind replacement). comply with his nov 200344789 & 200453831 dated 10/16/2003 & 9/22/2004Details
remove & replace driveway, 756sf. repair garage floor partially. (in-kind replacement). comply with his nov 200344789 & 200453831 dated 10/16/2003 & 9/22/2004 | $7,500 |
| Aug 17, 2005 | Completed final sign-off Sep 2005 | 106 Sanchez St | Frankie English Dba Doe Mabuhay Builders | janitor rom sheetrock all walls 1hr. fire rated laundry room as well tile all floors painted allDetails
janitor rom sheetrock all walls 1hr. fire rated laundry room as well tile all floors painted all | $10,000 |
| Aug 22, 2003 | Completed final sign-off Aug 2012 | 106 Sanchez St | Klee Construction | voluntary foundation upgrade revisions to app 200306116778Details
voluntary foundation upgrade revisions to app 200306116778 | |
| Jun 11, 2003 | Completed final sign-off Sep 2003 | 106 Sanchez St | Klee Construction | voluntary foundation upgrade retaining walls, footings & bracing existing brick walls & his notice 2Details
voluntary foundation upgrade retaining walls, footings & bracing existing brick walls & his notice 2 | $80,000 |