Block 3062, lot 023
95 Melrose Ave
- City’s use
- Single Family Residential
- Built
- 1943
- Stories
- 1
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,300 sq ft
- Lot
- 2,495 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 28, 2016 | Completed final sign-off May 2016 | 95 Melrose Av | rear of building - replace 2 windows with aluminum windows. dry rot repair on exterior wall.Details
rear of building - replace 2 windows with aluminum windows. dry rot repair on exterior wall. | $10,000 | |
| Dec 2, 2015 | Completed final sign-off May 2016 | 95 Melrose Av | inkind repair of stucco on front and side facades, revision to 201509298366,add dry rot repair as required on front & side elevations.Details
inkind repair of stucco on front and side facades, revision to 201509298366,add dry rot repair as required on front & side elevations. | $15,000 | |
| Sep 29, 2015 | Completed final sign-off May 2016 | 95 Melrose Av | replace front and side windows - 5 totalDetails
replace front and side windows - 5 total | $8,000 | |
| Sep 8, 2011 | Completed final sign-off Sep 2011 | 95 Melrose Av | Oliver Mackin Construction | revision to pa# 2011-0829-3507-increase dry rot repair, (e) windows re-installation, 3 total. stucco repair or west elevation (due to defective construction by previous contractor).Details
revision to pa# 2011-0829-3507-increase dry rot repair, (e) windows re-installation, 3 total. stucco repair or west elevation (due to defective construction by previous contractor). | $13,000 |
| Aug 29, 2011 | Never finaled issued Aug 2011, no final | 95 Melrose Av | dry rot repair on west elevation (partial) framing/stucco repair.Details
dry rot repair on west elevation (partial) framing/stucco repair. | $3,000 | |
| Jul 8, 2009 | Completed final sign-off Jan 2010 | 95 Melrose Av | Oliver Mackin Construction | replace in kind front stairs dure to leaksDetails
replace in kind front stairs dure to leaks | $7,000 |
| Oct 1, 2004 | Completed final sign-off Oct 2004 | 95 Melrose Av | renew for final 200209277614Details
renew for final 200209277614 | ||
| Sep 3, 2004 | Completed final sign-off Sep 2004 | 95 Melrose Av | replace damaged 4 by 4 post w/pt post per pest report. repair/replace (e) damged stair assembly & wDetails
replace damaged 4 by 4 post w/pt post per pest report. repair/replace (e) damged stair assembly & w | $3,200 | |
| May 17, 2004 | Completed final sign-off Jul 2004 | 95 Melrose Av | Bay Area General Const | remove right side property stucco to investigate possible dryrot/repair wndws/dryrot around windwDetails
remove right side property stucco to investigate possible dryrot/repair wndws/dryrot around windw | $2,000 |
| Sep 27, 2002 | Never finaled issued Sep 2002, no final | 95 Melrose Av | removal of (e) non load bearing wall around stair. replace w/code compliant guard rail & stair.Details
removal of (e) non load bearing wall around stair. replace w/code compliant guard rail & stair. | $12,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Oliver Mackin Construction (2), Bay Area General Const
- Architects
- Deepak Patankar
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.