Block 1703, lot 053
4611 Lincoln Way
- City’s use
- Multi-Family Residential
- Built
- 1967
- Stories
- 3
- Units
- 12
- Rooms
- 18 bedrooms, 12 bathrooms
- Building
- 11,340 sq ft
- Lot
- 5,000 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 24, 2023 | Completed final sign-off Jun 2023 | 4611 Lincoln Wy | replace siding plus (4) windows, (4) kitchen doors in rear of building due to water leakage.Details
replace siding plus (4) windows, (4) kitchen doors in rear of building due to water leakage. | $40,000 | |
| Apr 19, 2021 | Completed final sign-off Jul 2021 | 4611 Lincoln Wy | unit #2: remodel kitchen with new cabinets, stove,fridge,bathroom with new walk in shower,toilet,sink & vanity,replace kitchen sliding door visible from street,,bedroom window & bath window inkind to in kind. windows / sliding doors will be fiberglass.Details
unit #2: remodel kitchen with new cabinets, stove,fridge,bathroom with new walk in shower,toilet,sink & vanity,replace kitchen sliding door visible from street,,bedroom window & bath window inkind to in kind. windows / sliding doors will be fiberglass. | $50,000 | |
| Sep 14, 2020 | Completed final sign-off Dec 2020 | 4611 Lincoln Wy | Clear Windows And Clear Doors Inc | 4 window replacement in front (atp # 9,5,6,2) milguard ultra series fiberglass windows, dual pane title 24 equivalent. replace in-kind. double vent slider over 20" tempered glass picture windows. u factor 0.30.Details
4 window replacement in front (atp # 9,5,6,2) milguard ultra series fiberglass windows, dual pane title 24 equivalent. replace in-kind. double vent slider over 20" tempered glass picture windows. u factor 0.30. | $1,400 |
| Jul 15, 2019 | Completed final sign-off Aug 2019 | 4611 Lincoln Wy | Patrick K G Co. | to comply with nov# 201968901: dry rot repar due to the wter leaking from the second floor window to first floor on the right hand corner only at the back of the building and replace with one window(new) on the first floor. on on second floor. and sliding door on the 3rd floor.Details
to comply with nov# 201968901: dry rot repar due to the wter leaking from the second floor window to first floor on the right hand corner only at the back of the building and replace with one window(new) on the first floor. on on second floor. and sliding door on the 3rd floor. | $7,000 |
| Aug 23, 2017 | Completed final sign-off May 2018 | 4611 Lincoln Wy | Sft Construction Corp | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4; provide new ply shear walls w/new foundations, new fdrs underneath (e) steel moment frames.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4; provide new ply shear walls w/new foundations, new fdrs underneath (e) steel moment frames. | $80,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Clear Windows And Clear Doors Inc, Patrick K G Co., Sft Construction Corp
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.