Block 1583, lot 046
600 41st Ave
- City’s use
- Multi-Family Residential
- Built
- 1927
- Stories
- 3
- Units
- 9
- Rooms
- 9 bathrooms
- Building
- 6,741 sq ft
- Lot
- 2,750 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 2, 2023 | Completed final sign-off Jan 2025 | 600 41st Av | Chiang C M Construction Inc. | to obtain final inspection for work approved under pa201709138037. all work is complete.Details
to obtain final inspection for work approved under pa201709138037. all work is complete. | |
| Nov 2, 2023 | In progress issued Nov 2023 | 600 41st Av | Chiang C M Construction Inc. | recommencement and completion of work approved under 201803234437.Details
recommencement and completion of work approved under 201803234437. | $46,000 |
| Aug 5, 2021 | Expired or cancelled cancelled Jan 2026 | 600 41st Av | Chiang C M Construction Inc. | change hvac from gas furnace to heat pump. ref app#201803234437Details
change hvac from gas furnace to heat pump. ref app#201803234437 | $15,000 |
| Mar 22, 2021 | Never finaled issued Apr 2021, no final | 600 41st Av | K K Electric & Alarm Company | upgrade existing fire alarm system per ord. 165-16 with new system for 75 dba.Details
upgrade existing fire alarm system per ord. 165-16 with new system for 75 dba. | $8,800 |
| Feb 23, 2021 | Never finaled issued Aug 2021, no final | 600 41st Av | Magnum Construction Group Inc | install new sprinkler system per nfpa 13 for the ground floor and both floors of adu units total = 52 heads; ref. # 2018-0612-1668; included 2" underground fire serviceDetails
install new sprinkler system per nfpa 13 for the ground floor and both floors of adu units total = 52 heads; ref. # 2018-0612-1668; included 2" underground fire service | $28,000 |
| Jan 23, 2019 | Completed final sign-off Jun 2019 | 600 41st Av | Kinstan Home Solutions Inc. | apt 3. one kitchen and one bathroom remodeling. no structural work.Details
apt 3. one kitchen and one bathroom remodeling. no structural work. | $25,000 |
| Jan 23, 2019 | Completed final sign-off Jun 2019 | 600 41st Av | Kinstan Home Solutions Inc. | apt 1. one kitchen and one bathroom remodeling. no structural work.Details
apt 1. one kitchen and one bathroom remodeling. no structural work. | $25,000 |
| Jun 28, 2018 | Never finaled issued Jun 2018, no final | 600 41st Av | street spaceDetails
street space | ||
| Mar 27, 2018 | Completed final sign-off May 2018 | 600 41st Av | Shek's Construction Co | unit #6: replace sheetrock approx 390 sf @ bedrooms on 3rd floor. replace sink, vanity and toilet. replace (e) electrical panel. rewire electrical at bedrooms. replace fire damage hardwood floor.Details
unit #6: replace sheetrock approx 390 sf @ bedrooms on 3rd floor. replace sink, vanity and toilet. replace (e) electrical panel. rewire electrical at bedrooms. replace fire damage hardwood floor. | $3,000 |
| Mar 23, 2018 | Never finaled issued Sep 2019, no final | 600 41st Av | Chiang C M Construction Inc., Kong Lai Construction | add units per ord #162-16. in 1st floor: convert existing garage space to have 2 adu unts per ord 162-16.Details
add units per ord #162-16. in 1st floor: convert existing garage space to have 2 adu unts per ord 162-16. | $80,000 |
| Feb 22, 2018 | Completed final sign-off Oct 2018 | 600 41st Av | Shek's Construction Co | 4th flr - unit #9 - repair fire damaged walls, ceiling and floorsDetails
4th flr - unit #9 - repair fire damaged walls, ceiling and floors | $5,000 |
| Sep 13, 2017 | Expired or cancelled expired Jan 2025 | 600 41st Av | Chiang C M Construction Inc. | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $100,000 |
| Oct 6, 2016 | Never finaled issued May 2017, no final | 600 41st Av | street spaceDetails
street space | ||
| Apr 13, 2007 | Completed final sign-off May 2007 | 600 41st Av | revision to pa# 200701242459 per inspector request. show stairway replacement to (e) condition. same conditions and same location. not visible from street.Details
revision to pa# 200701242459 per inspector request. show stairway replacement to (e) condition. same conditions and same location. not visible from street. | $5,000 | |
| Jan 24, 2007 | Completed final sign-off May 2007 | 600 41st Av | repair and replace some damage wood in rear stair. to match the existing less than 50%.Details
repair and replace some damage wood in rear stair. to match the existing less than 50%. | $3,000 | |
| Jul 1, 2005 | Never finaled issued Jul 2005, no final | 600 41st Av | street space permit only.Details
street space permit only. |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Chiang C M Construction Inc. (5), Kinstan Home Solutions Inc. (2), Shek's Construction Co (2), K K Electric & Alarm Company, Kong Lai Construction, Magnum Construction Group Inc
- Engineers
- Darren Wong
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.