Block 1458, lot 007
439 26th Ave
- City’s use
- Multi-Family Residential
- Built
- 1995
- Stories
- 2
- Units
- 3
- Rooms
- 9 bedrooms, 5 bathrooms
- Building
- 4,197 sq ft
- Lot
- 3,227 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 12, 2024 | Completed final sign-off Apr 2024 | 439 26th Av | reroofingDetails
reroofing | $8,000 | |
| Dec 6, 2019 | Completed final sign-off Jul 2021 | 439 26th Av | Guardian Remodeling Construction | unit #3: no changes to exterior. convert existing walk-in closet into new bath. convert existing laundry into powder roomDetails
unit #3: no changes to exterior. convert existing walk-in closet into new bath. convert existing laundry into powder room | $15,000 |
| Dec 6, 2019 | Completed final sign-off Jul 2021 | 439 26th Av | Guardian Remodeling Construction | comply w/ nov 201967381 - fire damage repair & replacement in kind. work only in unit #3 on 3rd floor. replace 2 exterior sliding doors at rear of building. replace guardrails & decking at roof deck. replace 5/8" gypsum bd. type x at interior walls througout where fire damage occurs.remove solariumDetails
comply w/ nov 201967381 - fire damage repair & replacement in kind. work only in unit #3 on 3rd floor. replace 2 exterior sliding doors at rear of building. replace guardrails & decking at roof deck. replace 5/8" gypsum bd. type x at interior walls througout where fire damage occurs.remove solarium | $15,000 |
| Oct 21, 2019 | Completed final sign-off Jul 2021 | 439 26th Av | Guardian Remodeling Construction | apt 1: remodel 2 bathrooms; new tub fixtures (shower head/valve), isntall new insulation in walls 7 ceilings, install new sheetrock,txtures and paint. install new tiling, new laminate flooring, install 12 recessed lights throughout.Details
apt 1: remodel 2 bathrooms; new tub fixtures (shower head/valve), isntall new insulation in walls 7 ceilings, install new sheetrock,txtures and paint. install new tiling, new laminate flooring, install 12 recessed lights throughout. | $30,000 |
| Jul 11, 2019 | Completed final sign-off Apr 2021 | 439 26th Av | Universal Services Restoration Inc | demolition on affected area by water damage on apartments number 1,2,3, garage and common hallways. materials affected to be performed the demolition: drywaylls & insulations. street facing. framing to remain.Details
demolition on affected area by water damage on apartments number 1,2,3, garage and common hallways. materials affected to be performed the demolition: drywaylls & insulations. street facing. framing to remain. | $10,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Guardian Remodeling Construction (3), Universal Services Restoration Inc
- Engineers
- Jorge Carbonell (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.