Block 1447, lot 042
300 16th Ave
- City’s use
- Multi-Family Residential
- Built
- 1930
- Stories
- 6
- Units
- 36
- Rooms
- 36 bathrooms
- Building
- 34,920 sq ft
- Lot
- 7,104 sq ft
- Zoning
- RM1
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
29 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 21, 2026 | In progress issued Jul 2026 | 300 16th Av | The Frame Construction | apt #403: remodel kitchen and bathroom like for like rewire apartment, new copper lines in apt.Details
apt #403: remodel kitchen and bathroom like for like rewire apartment, new copper lines in apt. | $65,000 |
| Dec 11, 2025 | Expired or cancelled withdrawn Jun 2026 | 300 16th Av | Byington Electric Corp | replace fire alarm system to meet sf/ca code interpretation 1103.6.71 add lf horns in units & add wireless monitor "all units"Details
replace fire alarm system to meet sf/ca code interpretation 1103.6.71 add lf horns in units & add wireless monitor "all units" | $68,000 |
| Dec 27, 2024 | Completed final sign-off Apr 2025 | 300 16th Av | The Frame Construction | apt #304: remodel kitchen & bathroom. paint apartment. no removal of wallsDetails
apt #304: remodel kitchen & bathroom. paint apartment. no removal of walls | $80,000 |
| Jan 9, 2024 | Completed final sign-off Feb 2024 | 300 16th Av | The Frame Construction | unit 501. demo existing kitchen and paint apartment. install cabinets and tile kitchen and bathroom.Details
unit 501. demo existing kitchen and paint apartment. install cabinets and tile kitchen and bathroom. | $18,000 |
| Oct 27, 2022 | Completed final sign-off Sep 2023 | 300 16th Av | Hinojosa Roofing Inc | reroofingDetails
reroofing | $20,000 |
| Aug 16, 2022 | Never finaled issued Apr 2023, no final | 300 16th Av | Xclusive Wireless Resources Llc. | verizon - replace 9 antennas, relocate 2 and remove 4 antenna mounts, replace 3 and add 6 rrus, replace 3 and remove 1 ovp, add 3 combiners and 3 diplexers, replace section of cable tray, replace 8 runs of coax cable with 3 runs hybrid cable, install roof traffic pads and unistrut as needed.Details
verizon - replace 9 antennas, relocate 2 and remove 4 antenna mounts, replace 3 and add 6 rrus, replace 3 and remove 1 ovp, add 3 combiners and 3 diplexers, replace section of cable tray, replace 8 runs of coax cable with 3 runs hybrid cable, install roof traffic pads and unistrut as needed. | $70,000 |
| Jul 8, 2021 | Completed final sign-off Mar 2022 | 300 16th Av | Hinojosa Roofing Inc | re-roofingDetails
re-roofing | $18,000 |
| Mar 31, 2021 | Completed final sign-off Sep 2021 | 300 16th Av | apt 101 - kitchen and bath renovation. no wall modification. no strurcturalDetails
apt 101 - kitchen and bath renovation. no wall modification. no strurctural | $35,000 | |
| Oct 7, 2019 | Never finaled issued Oct 2019, no final | 300 16th Av | street spaceDetails
street space | ||
| Aug 8, 2018 | Completed final sign-off Jan 2019 | 300 16th Av | San Francisco Fire Protection | phase 1 - like for like fire system replacement w/new control panel, smoke detectors & pull systems at the same location due to elev. modernization. install relay modules for elev. recall, monitor module for flow switch connection. tie-in e bell to new panel. phase 2 - will comply w/new sffc by 2021Details
phase 1 - like for like fire system replacement w/new control panel, smoke detectors & pull systems at the same location due to elev. modernization. install relay modules for elev. recall, monitor module for flow switch connection. tie-in e bell to new panel. phase 2 - will comply w/new sffc by 2021 | $12,000 |
| Jul 3, 2018 | Expired or cancelled cancelled Feb 2022 | 1495 Clement St | Quality Telecom Consultants | in existing: installation of (2) 4in conduits (80lf),2 pull cans,(4) 4in core drills, 1.25in innerduct approx 15 3/4in mule tape in each 4in conduit. no modfication to any equipment (antennaes, radios, batteries, etc) that would affect the rf status of the site.Details
in existing: installation of (2) 4in conduits (80lf),2 pull cans,(4) 4in core drills, 1.25in innerduct approx 15 3/4in mule tape in each 4in conduit. no modfication to any equipment (antennaes, radios, batteries, etc) that would affect the rf status of the site. | $15,000 |
| Apr 25, 2017 | Completed final sign-off Jul 2017 | 300 16th Av | unit #602: one kitchen remodel: new cabinets, counter tops, back splash, sink, sink faucet, exhaust fan, floorDetails
unit #602: one kitchen remodel: new cabinets, counter tops, back splash, sink, sink faucet, exhaust fan, floor | $14,000 | |
| May 31, 2016 | Completed final sign-off Sep 2016 | 300 16th Av | unit 206: bathroom remodel: new tub, shower valve, sink, faucent, toilet, floor tile, lighting fan, tile (tub), medicvine cabinet; kitchen remodel: new countertops, backsplash, cabinets, sink, faucent, exhaust fan, floor tile, lighting.Details
unit 206: bathroom remodel: new tub, shower valve, sink, faucent, toilet, floor tile, lighting fan, tile (tub), medicvine cabinet; kitchen remodel: new countertops, backsplash, cabinets, sink, faucent, exhaust fan, floor tile, lighting. | $20,000 | |
| Nov 10, 2015 | Expired or cancelled withdrawn Jan 2022 | 300 16th Av | remove 9 (e) antennas & replace with 9 new antennas. add 9 new rrus. remove 3 (e) rrus. all work for verizon wireless. 6 wall mounts to be removed, area to be restored to original condition.Details
remove 9 (e) antennas & replace with 9 new antennas. add 9 new rrus. remove 3 (e) rrus. all work for verizon wireless. 6 wall mounts to be removed, area to be restored to original condition. | $40,000 | |
| Sep 3, 2015 | Completed final sign-off Mar 2016 | 300 16th Av | unit b: bathroom & kitchen remodel, patio door replacement & replacement windows (2) not visible from street in-kind.Details
unit b: bathroom & kitchen remodel, patio door replacement & replacement windows (2) not visible from street in-kind. | $20,000 | |
| Jun 29, 2015 | Never finaled issued Jun 2015, no final | 300 16th Av | street spaceDetails
street space | ||
| Apr 7, 2014 | Completed final sign-off Sep 2014 | 300 16th Av | #305. bathroom remodel: new tub, shower valve, sink, faucet, low flow toilet, tile, floor tile, lighting, exhaust fan. kitchen remodel: backsplash, counter tops, sink faucet, lighting, faucet valve, floor tile. no doors, windows, walls unde this scope.Details
#305. bathroom remodel: new tub, shower valve, sink, faucet, low flow toilet, tile, floor tile, lighting, exhaust fan. kitchen remodel: backsplash, counter tops, sink faucet, lighting, faucet valve, floor tile. no doors, windows, walls unde this scope. | $19,000 | |
| Apr 7, 2014 | Completed final sign-off Aug 2014 | 300 16th Av | #204: bathroom remodel: new tub, sink, faucet, low flow toilet, tile, floor tile, shower valve, lighting, exhaust fan. no walls to be removed. no window, door, walls under this scope.Details
#204: bathroom remodel: new tub, sink, faucet, low flow toilet, tile, floor tile, shower valve, lighting, exhaust fan. no walls to be removed. no window, door, walls under this scope. | $12,000 | |
| Aug 23, 2013 | Completed final sign-off Feb 2014 | 300 16th Av | bathroom - replace shower valve, tub, toilet, sink all tile. replace exhaust fan & lighting bathroom window (tempered) for unit 104Details
bathroom - replace shower valve, tub, toilet, sink all tile. replace exhaust fan & lighting bathroom window (tempered) for unit 104 | $12,000 | |
| Jun 21, 2013 | Completed final sign-off Feb 2014 | 300 16th Av | Quality Telecom Consultants | from newest version of antenna sheet (3) existing vw panel antennas to be installed and (3) new vw panel antenas to be removed (3) new vw rrus 12 (2) new vw raycap surge protectors (1) new vw hybrid jumpers (1) new vw homerun ret cableDetails
from newest version of antenna sheet (3) existing vw panel antennas to be installed and (3) new vw panel antenas to be removed (3) new vw rrus 12 (2) new vw raycap surge protectors (1) new vw hybrid jumpers (1) new vw homerun ret cable | $40,000 |
| Mar 21, 2012 | Expired or cancelled expired Mar 2016 | 300 16th Av | Collier Warehouse Inc. | #704- replace 2 existing push out wood double casements windows with 2 marvin wood double casements, top floor unit facing 16th ave. remove sashes & insert complete marvin window.Details
#704- replace 2 existing push out wood double casements windows with 2 marvin wood double casements, top floor unit facing 16th ave. remove sashes & insert complete marvin window. | $6,500 |
| Jul 12, 2010 | Never finaled issued Jul 2010, no final | 300 16th Av | street space for scaffoldDetails
street space for scaffold | ||
| May 14, 2009 | Completed final sign-off Aug 2009 | 300 16th Av | Park Place Contractors, N S A Wireless Inc | replacement of (6) existing 4' antennas with (6) new 4' antennas. swap like for like antennas.Details
replacement of (6) existing 4' antennas with (6) new 4' antennas. swap like for like antennas. | $2,500 |
| Jun 6, 2008 | Completed final sign-off Aug 2008 | 300 16th Av | Unhique Construction | replace existing aluminum windows with new vinyl windows in 11 units. only on the south side (back & side). 58 windows. 0.67 u-factor max.Details
replace existing aluminum windows with new vinyl windows in 11 units. only on the south side (back & side). 58 windows. 0.67 u-factor max. | $23,000 |
| Mar 31, 2008 | Completed final sign-off Apr 2008 | 1495 Clement St | C E I Roofing California A Tecta Americ | reroofingDetails
reroofing | $7,000 |
| Feb 6, 2007 | Completed final sign-off Jun 2007 | 300 16th Av | J B 3 Enterprises Inc | renew appl#200501284194, 200602285591 for final inspectionDetails
renew appl#200501284194, 200602285591 for final inspection | |
| Feb 28, 2006 | Expired or cancelled cancelled Oct 2021 | 300 16th Av | J B 3 Enterprises Inc | renew 200501284194 for final inspection.Details
renew 200501284194 for final inspection. | |
| Jan 28, 2005 | Expired or cancelled expired Jun 2007 | 300 16th Av | Broken Arrow Communications Inc | replace center antenna per sector - like for likeDetails
replace center antenna per sector - like for like | $2,500 |
| Dec 7, 2000 | Completed final sign-off Mar 2001 | 300 16th Av | Har Bro Of No. California | replace 3-14' 2x12 patch sub floor 32a. rewire 4 rooms check elec. steam heat repair.Details
replace 3-14' 2x12 patch sub floor 32a. rewire 4 rooms check elec. steam heat repair. | $30,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- The Frame Construction (3), Hinojosa Roofing Inc (2), J B 3 Enterprises Inc (2), Quality Telecom Consultants (2), Broken Arrow Communications Inc, Byington Electric Corp, C E I Roofing California A Tecta Americ, Collier Warehouse Inc., Har Bro Of No. California, N S A Wireless Inc, Park Place Contractors, San Francisco Fire Protection, Unhique Construction, Xclusive Wireless Resources Llc.
- Architects
- Nestor Popowych (2)
- Engineers
- Daniel Connel, Kevin Sorensen, Tahzay Ramirez
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.