Block 1248, lot 006
651 Cole St
- City’s use
- Multi-Family Residential
- Built
- 1962
- Stories
- 2
- Units
- 4
- Rooms
- 4 bedrooms, 4 bathrooms
- Building
- 2,790 sq ft
- Lot
- 2,119 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 24, 2026 | Completed final sign-off Jul 2026 | 651 Cole St | Ccf Construction, Llc | unit 3: bathroom and kitchen remodel in-kind. no wall alteration.Details
unit 3: bathroom and kitchen remodel in-kind. no wall alteration. | $50,000 |
| Feb 24, 2026 | Completed final sign-off Jun 2026 | 651 Cole St | Ccf Construction, Llc | fix all dry rot in lightwell rear door frame. reframe rough opening door structure reroof lightwell. restucco surround of lightwell an surrounding of door. not street visible. no strutural change, replace door and window in kind, 2 doors and 2 windows, v=0.3Details
fix all dry rot in lightwell rear door frame. reframe rough opening door structure reroof lightwell. restucco surround of lightwell an surrounding of door. not street visible. no strutural change, replace door and window in kind, 2 doors and 2 windows, v=0.3 | $500 |
| Feb 24, 2026 | In progress issued Feb 2026 | 651 Cole St | Ccf Construction, Llc | address correction to change 651 cole street unit 2 & 4 to units 1 & 4 on pa#202602035114.Details
address correction to change 651 cole street unit 2 & 4 to units 1 & 4 on pa#202602035114. | |
| Feb 3, 2026 | Completed final sign-off Jun 2026 | 651 Cole St | Ccf Construction, Llc | unit 2 & 4: 2 bathrooms and 2 kitchens remodel in-kind.Details
unit 2 & 4: 2 bathrooms and 2 kitchens remodel in-kind. | $25,000 |
| Dec 19, 2025 | Completed final sign-off Apr 2026 | 651 Cole St | Ccf Construction, Llc | remove two (e) front balconies and replace with (e) patio doors with new windows within the same opening.Details
remove two (e) front balconies and replace with (e) patio doors with new windows within the same opening. | $15,000 |
| Mar 7, 2018 | Completed final sign-off Apr 2018 | 651 Cole St | install two sliding doors and two windows in-kind (marvin) wood clad. complaint # 201716291 dated 11/2/2017, 4, 5, 8, 13, 22, 23, 24, 25; complaint #201717341, items 1,2,3,4,5Details
install two sliding doors and two windows in-kind (marvin) wood clad. complaint # 201716291 dated 11/2/2017, 4, 5, 8, 13, 22, 23, 24, 25; complaint #201717341, items 1,2,3,4,5 | $5,000 | |
| Feb 22, 2018 | Never finaled issued Feb 2018, no final | 651 Cole St | street spaceDetails
street space | ||
| Jan 30, 2018 | Completed final sign-off Apr 2018 | 651 Cole St | to comply complaints#201710681, 201756471, 201715992, 201716291. refrain deck at front of bldg less than 50% of repairDetails
to comply complaints#201710681, 201756471, 201715992, 201716291. refrain deck at front of bldg less than 50% of repair | $8,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ccf Construction, Llc (5)
- Architects
- Kevin Ma
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.