Block 1202, lot 002A
1290 Hayes St
24 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 6, 2023 | Completed | 1290 Hayes St | Crime Watch Security Sys Llc | as built to permit 202210315505. removed 1 smoke detector, riser diagram and equipment list. | |
| Oct 31, 2022 | Completed | 1290 Hayes St | Crime Watch Security Sys Llc | upgrade existing fire alarm system to comply with sffc section 1103.1.6.1. | $18,600 |
| Jul 21, 2022 | Completed | 1290 Hayes St | Sure, Inc. | unit #7. remodel 1 54 sq ft kitchen and 1 30 sq ft bath. no wall moving, replace 1 bathtub to walk-in shower. (n) electrical wiring and panel inside of the unit. no layout change. | $32,000 |
| Aug 8, 2019 | Never finaled | 1290 Hayes St | street space w/mta | ||
| Jul 16, 2019 | Never finaled | 1290 Hayes St | street space | ||
| Jul 11, 2019 | Never finaled | 1290 Hayes St | street space | ||
| Mar 27, 2019 | Never finaled | 600 Divisadero St | Baragon General Construction Inc. | accessible business entrance program per ordiance 51-16: replace existing wood door w/ada compliant door in same opening no structural chamge outside. door will not swing over the public row. | $5,500 |
| Sep 8, 2017 | Completed | 1290 Hayes St | Sure, Inc. | work in unit #3: remodeling bathroom. replace kitchen countertops and all appliances only - not full kitchen remodel | $25,000 |
| Aug 2, 2017 | Never finaled | 1290 Hayes St | Sure, Inc. | #4 & #8 - replace 2 kitchen counter tops, remodel 2 bathrooms. | $38,000 |
| Sep 20, 2016 | Completed | 1290 Hayes St | Sure, Inc. | #9- kitchen and bath remodeling. | $25,000 |
| Jan 29, 2015 | Never finaled | 604 Divisadero St | Bt Construction | electrical layout (plans) t-24, ref. to application 201412053165. | |
| Jan 29, 2015 | Completed | 604 Divisadero St | Bt Construction | revision to 201412053165. minor dryrot repair under exsting storefront sill | $500 |
| Dec 5, 2014 | Never finaled | 604 Divisadero St | Bt Construction | commercial t.i. selective demolition and new construction of ada restroom upgrade: doors,frames, minor electrical and plumbing. | $50,000 |
| Dec 1, 2011 | Completed | 600 Divisadero St | Sure, Inc. | remove existing walls and fixtures of restroom. install new drywall for restroom. new and relocated restroom fixtures. new flooring, enlarge opening to rentable space. no structural work. currently vacant. remain vacant. upgrade existing restroom for accessble reqmt | $12,000 |
| Aug 24, 2011 | Never finaled | 600 Divisadero St | street space | ||
| Jul 18, 2011 | Completed | 600 Divisadero St | Qse Construction | voluntary seismic upgrade w/ front steel moment frame, shearwalls, anchor bolts and brick wall supports for this commercial area only. | $35,000 |
| Jan 21, 2011 | Completed | 600 Divisadero St | Sure, Inc. | g/f- remove interior finishes. install drywall to 1 hr fire rating on walls and ceiling, restore to shell condition for future tenant ( currently vacant, was a meat market). no structural work. | $12,000 |
| May 21, 2009 | Never finaled | 600 Divisadero St | Clear Channel Outdoor | remove junior 6x12 poster panel general advertising sign to comply with nov# 9381 | $300 |
| Apr 5, 2007 | Expired or cancelled | 1290 Hayes St | install food service equipment for food sales. | $10,000 | |
| Oct 27, 2006 | Never finaled | 600 Divisadero St | street space & sidewalk | ||
| Sep 28, 2006 | Completed | 1290 Hayes St | Sure, Inc. | replace kchn cabinets, bathroom vanity, bathroom medicine cabinet, flourescent light 50% in kchn, bath light flourescent or controlled by motion sensor in unit 2 only 1 bath and 1 kchn only | $12,000 |
| Feb 5, 2003 | Completed | 1290 Hayes St | Lara Construction Co. | remove cabinets in kitchen. install new kitchen cabinets +formica top. replace tile on bathtub wall. | $6,500 |
| Jul 10, 2002 | Completed | 1290 Hayes St | Lara Construction Co. | remove existing cabinets and cntrtop,install new, new tile in bathtub only | $4,200 |
| Apr 23, 2002 | Completed | 1290 Hayes St | Lara Construction Co. | remove ex kitchen cabinets/cntr install new cabinets/laminate counter no structural walls touched | $4,500 |