Block 1061, lot 050
105 Palm Av
- City’s use
- Single Family Residential
- Built
- 1919
- Stories
- 3
- Units
- 1
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 1,202 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 16, 2017 | Completed final sign-off Nov 2017 | 105 Palm Av | Flanagan Construction | dry rot repair work on rear stairs and walkways/landings. replace in-kind. less than 50%Details
dry rot repair work on rear stairs and walkways/landings. replace in-kind. less than 50% | $7,000 |
| Nov 30, 2016 | Completed final sign-off Dec 2018 | 105 Palm Av | Connor Daly Corporation | comply with nov 201642431; soft story retrofit per sfbc chapter 34b: 212 iebc appendix a-4, add plywood diapghram to crawl space ceiling.add shear walls where indicated on plans. comply with sfebc chapter 4d, created with ordinance 66-13Details
comply with nov 201642431; soft story retrofit per sfbc chapter 34b: 212 iebc appendix a-4, add plywood diapghram to crawl space ceiling.add shear walls where indicated on plans. comply with sfebc chapter 4d, created with ordinance 66-13 | $75,000 |
| Jul 31, 2015 | Expired or cancelled suspend Aug 2015 | 105 Palm Av | street spaceDetails
street space | ||
| Mar 4, 2010 | Completed final sign-off Jul 2010 | 105 Palm Av | Allen Bellis | unit #10: remodel one bathroom. no structural 40 sq ft. remove and replace all fixutures and surfaces:walls & floor tile, toilet,sink etcDetails
unit #10: remodel one bathroom. no structural 40 sq ft. remove and replace all fixutures and surfaces:walls & floor tile, toilet,sink etc | $25,000 |
| Apr 4, 2007 | Completed final sign-off Jan 2008 | 105 Palm Av | unit #11-revise pa# 200702224669-add full bathroom in bedroom, remodel (e) bathroom.Details
unit #11-revise pa# 200702224669-add full bathroom in bedroom, remodel (e) bathroom. | $8,000 | |
| Feb 22, 2007 | Completed final sign-off Jan 2008 | 105 Palm Av | 105 palm av. #11 - interior remodel in condo, convert closet to 1/2/ bath in bedroom. reduce size of bath window.Details
105 palm av. #11 - interior remodel in condo, convert closet to 1/2/ bath in bedroom. reduce size of bath window. | $5,000 | |
| Feb 20, 2007 | Completed final sign-off Jun 2007 | 105 Palm Av | Jjj & K Inc./Dba: Alexander Company | replace 134 windows. size for size. all windows on the building. aluminium to aluminium. 80 windows at front (aluminium). 54 windows at rear (vinyl)Details
replace 134 windows. size for size. all windows on the building. aluminium to aluminium. 80 windows at front (aluminium). 54 windows at rear (vinyl) | $71,000 |
| Oct 1, 2004 | Completed final sign-off Nov 2004 | 105 Palm Av | Goodlife Kitchens | kitchen remodel - no structural changes, replace cabinets & counter topsDetails
kitchen remodel - no structural changes, replace cabinets & counter tops | $15,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Allen Bellis, Connor Daly Corporation, Flanagan Construction, Goodlife Kitchens, Jjj & K Inc./Dba: Alexander Company
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.