Block 1040, lot 020
390 Arguello Blvd
- City’s use
- Multi-Family Residential
- Built
- 1916
- Stories
- 2
- Units
- 10
- Rooms
- 10 bathrooms
- Building
- 12,340 sq ft
- Lot
- 9,500 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 22, 2024 | Expired or cancelled withdrawn Sep 2026 | 390 Arguello Bl | Halyard Inc | upgrade (e) fire alarm system to current codes, nfpa 72 (2022) to comply with sffc 1103.7.6.1 to provide low freq sounders in sleeping areas.Details
upgrade (e) fire alarm system to current codes, nfpa 72 (2022) to comply with sffc 1103.7.6.1 to provide low freq sounders in sleeping areas. | $6,500 |
| Aug 31, 2020 | Completed final sign-off Jun 2021 | 390 Arguello Bl | Brighter Bay Builders Inc | renovation of 2 apts unit #7 (2nd floor) & unit #8 (3rd floor): new bedroom & bathroom. new kitchen cabinets & plumbing fixtures. new washer/dryer & dishwashers. new lighting at (e) j-box locations. no exterior work. no fire/alarm/sprinkler work. structrual drawing provided.Details
renovation of 2 apts unit #7 (2nd floor) & unit #8 (3rd floor): new bedroom & bathroom. new kitchen cabinets & plumbing fixtures. new washer/dryer & dishwashers. new lighting at (e) j-box locations. no exterior work. no fire/alarm/sprinkler work. structrual drawing provided. | $125,000 |
| Nov 15, 2018 | Never finaled issued Nov 2018, no final | 390 Arguello Bl | street spaceDetails
street space | ||
| Jun 22, 2017 | Completed final sign-off Apr 2019 | 390 Arguello Bl | A J O Group Build Inc | compliance with mandatory seismic retrofit program per 2016 cebc appendix a-4.Details
compliance with mandatory seismic retrofit program per 2016 cebc appendix a-4. | $50,000 |
| Apr 23, 2015 | Never finaled issued Apr 2015, no final | 390 Arguello Bl | street space and sidewalkDetails
street space and sidewalk | ||
| Jun 24, 2013 | Never finaled issued Jun 2013, no final | 390 Arguello Bl | street space permitDetails
street space permit | ||
| Nov 13, 2007 | Completed final sign-off Jun 2008 | 390 Arguello Bl | Grande Construction | work on unit#8 only.remove existing cabinets & counter install new cabinets counter. reinstall sink, faucet, frige range, dishwasher, paint walls trim , no structural same floor plan. work in kitchen only.Details
work on unit#8 only.remove existing cabinets & counter install new cabinets counter. reinstall sink, faucet, frige range, dishwasher, paint walls trim , no structural same floor plan. work in kitchen only. | $10,000 |
| Nov 9, 2005 | Never finaled issued Nov 2005, no final | 390 Arguello Bl | sidewalkDetails
sidewalk |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- A J O Group Build Inc, Brighter Bay Builders Inc, Grande Construction, Halyard Inc
- Architects
- Jacob Herczeg
- Engineers
- Donald David
- Authorized agent-otherss
- Bill Hung
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.