Block 1031, lot 011
3000 Pine St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 6
- Rooms
- 6 bathrooms
- Building
- 5,475 sq ft
- Lot
- 2,500 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 20, 2019 | Completed final sign-off Jun 2019 | 3000 Pine St | repair rear stairs, replace rotten members < 50%, repaintDetails
repair rear stairs, replace rotten members < 50%, repaint | $4,800 | |
| Sep 11, 2017 | Completed final sign-off Feb 2023 | 3000 Pine St | Dylan Arrants Construction | soft story retrofiter per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofiter per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $55,000 |
| Aug 19, 2013 | Completed final sign-off Aug 2013 | 3000 Pine St | Community Reconstruction Solutions | repair fire escape decay located at back of building, not visible from street. repair work less than 50% in-kind, mainly the guardrail and handrail. handrail and guardrail repair work shall comply with cbc section 1012 & 1013 respectively.Details
repair fire escape decay located at back of building, not visible from street. repair work less than 50% in-kind, mainly the guardrail and handrail. handrail and guardrail repair work shall comply with cbc section 1012 & 1013 respectively. | $850 |
| Nov 17, 2008 | Completed final sign-off Dec 2008 | 3000 Pine St | California Roof Management | to correct nov #200873143 item #2 replace the wooden utility ladder leading to the roof with osha compliant ladder, no structural changesDetails
to correct nov #200873143 item #2 replace the wooden utility ladder leading to the roof with osha compliant ladder, no structural changes | $1,000 |
| Apr 13, 2007 | Completed final sign-off Jun 2007 | 3000 Pine St | Qse Construction | revision to pa #200704118560, add front steel moment frame around garage door to strengthen the soft front and tie front foundations w/ new grade beam.Details
revision to pa #200704118560, add front steel moment frame around garage door to strengthen the soft front and tie front foundations w/ new grade beam. | $9,540 |
| Apr 11, 2007 | Completed final sign-off Apr 2007 | 3000 Pine St | Qse Construction | complete voluntary seismic upgrade of foundation sill plates w/ a.b. s. this permit is to remove (e) plywood interior wall sheathing, add 3/4" x 12" long redhead expansion a.b.'s . @ 48" o.c.(i.c.b.o#1372) and replace (e) plywood wall sheathing for entire fdn. all abs to have plate washers.Details
complete voluntary seismic upgrade of foundation sill plates w/ a.b. s. this permit is to remove (e) plywood interior wall sheathing, add 3/4" x 12" long redhead expansion a.b.'s . @ 48" o.c.(i.c.b.o#1372) and replace (e) plywood wall sheathing for entire fdn. all abs to have plate washers. | $5,245 |
| Apr 18, 2006 | Never finaled issued Apr 2006, no final | 3000 Pine St | street space and sidewalk permitDetails
street space and sidewalk permit | ||
| Jun 1, 2004 | Completed final sign-off Jun 2004 | 3000 Pine St | A-1 Construction Co | comply with nov 200449473-less than 50 percent of structureDetails
comply with nov 200449473-less than 50 percent of structure | $2,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Qse Construction (2), A-1 Construction Co, California Roof Management, Community Reconstruction Solutions, Dylan Arrants Construction
- Engineers
- Mike Hom
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.