Block 0927, lot 001
3459 Divisadero St
- City’s use
- Multi-Family Residential
- Built
- 1929
- Stories
- 3
- Units
- 18
- Rooms
- 18 bathrooms
- Building
- 18,336 sq ft
- Lot
- 7,030 sq ft
- Zoning
- RM3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 24, 2026 | Completed final sign-off Aug 2026 | 3459 Divisadero St | Byington Electric Corp | revision of pa#: 202511079141. remove un-needed faa remote.Details
revision of pa#: 202511079141. remove un-needed faa remote. | |
| Nov 7, 2025 | In progress issued Nov 2025 | 3459 Divisadero St | Byington Electric Corp | replace fire alarm system to meet sf/ca cpdes + add lf horns in units + add wireless radio monitor.Details
replace fire alarm system to meet sf/ca cpdes + add lf horns in units + add wireless radio monitor. | $38,000 |
| Apr 28, 2022 | Completed final sign-off Aug 2022 | 3459 Divisadero St | #106: one kitchen renovation: cabinetry, countertop, sink, faucet, shut off valves, backsplash, appliances, flooring. one bathroom renovation: shower valves, toilet, sink, medicine cabinet, flooring tile surround.Details
#106: one kitchen renovation: cabinetry, countertop, sink, faucet, shut off valves, backsplash, appliances, flooring. one bathroom renovation: shower valves, toilet, sink, medicine cabinet, flooring tile surround. | $50,000 | |
| Apr 26, 2018 | Completed final sign-off Apr 2021 | 3459 Divisadero St | Bai Construction | seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit per 2016 cebc appendix a4 maher not reqDetails
seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit per 2016 cebc appendix a4 maher not req | $180,000 |
| Feb 26, 2015 | Completed final sign-off Jul 2015 | 3459 Divisadero St | bathroom and kitchen remodel. no change in openigs & layout; lighting change to provide min. 50% wattage high efficacy for kitchen & have main light being high efficacy; bathroom lighting shall be high efficacy or controlled by manual sensor.Details
bathroom and kitchen remodel. no change in openigs & layout; lighting change to provide min. 50% wattage high efficacy for kitchen & have main light being high efficacy; bathroom lighting shall be high efficacy or controlled by manual sensor. | $25,000 | |
| Feb 26, 2015 | Never finaled filed Feb 2015, never issued | 3459 Divisadero St | bathroom and kitchen remodel. no change in openigs & layout; lighting change to provide min. 50% wattage high efficacy for kitchen & have main light being high efficacy; bathroom lighting shall be high efficacy or controlled by manual sensor.Details
bathroom and kitchen remodel. no change in openigs & layout; lighting change to provide min. 50% wattage high efficacy for kitchen & have main light being high efficacy; bathroom lighting shall be high efficacy or controlled by manual sensor. | ||
| Jun 1, 2012 | Expired or cancelled expired Aug 2015 | 3459 Divisadero St | apt. #206- kitchen floors, counters, cabinets. remodel bathroom. replacement windows: 8 windows at the back not visible from street. u value = 0.40.Details
apt. #206- kitchen floors, counters, cabinets. remodel bathroom. replacement windows: 8 windows at the back not visible from street. u value = 0.40. | $25,000 | |
| Jun 7, 2010 | Completed final sign-off Jun 2010 | 3459 Divisadero St | New High Protection Roofing | reroofingDetails
reroofing | $35,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Byington Electric Corp (2), Bai Construction, New High Protection Roofing
- Engineers
- Darren Wong
- Designers
- Timothy Shaon (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.