21 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 9, 2019 | Completed final sign-off Jun 2019 | 235 Laussat St | to comply with physical inspection report #cc-8317Details
to comply with physical inspection report #cc-8317 | $100 | |
| Dec 10, 2018 | Completed final sign-off May 2019 | 237 Laussat St | Celebrity Tile | bath room remodel in-kind; demo (e) shower stall bathroom floor wiens tile coting, demo replace with new tile in all areas remove and replace vanity change electrical switches remove and replace shower valve and water test shower panDetails
bath room remodel in-kind; demo (e) shower stall bathroom floor wiens tile coting, demo replace with new tile in all areas remove and replace vanity change electrical switches remove and replace shower valve and water test shower pan | $9,000 |
| Mar 2, 2018 | Never finaled issued Mar 2018, no final | 237 Laussat St | street space permit - renewal of permit 3 201801128505Details
street space permit - renewal of permit 3 201801128505 | ||
| Mar 2, 2018 | Completed final sign-off Jan 2019 | 235 Laussat St | inkind replacement of two wooden front doors with wood doors. same size openingDetails
inkind replacement of two wooden front doors with wood doors. same size opening | $3,000 | |
| Jan 12, 2018 | Completed final sign-off Aug 2018 | 237 Laussat St | replace new kitchen cabinets in same location on (e). tile on exterior deck.Details
replace new kitchen cabinets in same location on (e). tile on exterior deck. | $28,000 | |
| Aug 7, 2015 | Completed final sign-off Sep 2015 | 235 Laussat St | to obtain final inspection for work approved under pa#201304114357. all work is complete.Details
to obtain final inspection for work approved under pa#201304114357. all work is complete. | ||
| Aug 7, 2015 | Completed final sign-off Aug 2015 | 235 Laussat St | to obtain final inspection for work approved under pa#201304114357. all work is complete.Details
to obtain final inspection for work approved under pa#201304114357. all work is complete. | ||
| Sep 9, 2013 | Expired or cancelled cancelled Jul 2015 | 235 Laussat St | comply with nov#201315601 & revision to pa#201109164871 back of origin design.Details
comply with nov#201315601 & revision to pa#201109164871 back of origin design. | ||
| Apr 11, 2013 | Completed final sign-off Aug 2015 | 235 Laussat St | revision to pa# 2011-0916-4871s/s1-comply with nov# 201153679-new revision, structural plan with connection details. removal of 1 deck on 1st floor from scope of work. half bathroom become full bathroomDetails
revision to pa# 2011-0916-4871s/s1-comply with nov# 201153679-new revision, structural plan with connection details. removal of 1 deck on 1st floor from scope of work. half bathroom become full bathroom | $300 | |
| Mar 27, 2013 | Never finaled issued Mar 2013, no final | 237 Laussat St | street spaceDetails
street space | ||
| Dec 21, 2012 | Never finaled issued Dec 2012, no final | 235 Laussat St | street spaceDetails
street space | ||
| Oct 23, 2012 | Never finaled issued Oct 2012, no final | 235 Laussat St | street spaceDetails
street space | ||
| May 29, 2012 | Completed final sign-off Nov 2013 | 235 Laussat St | bathroom remodel on the first floor and thrid floor of 235 and 237 laussat st. lighting to comply with cec 150(k).Details
bathroom remodel on the first floor and thrid floor of 235 and 237 laussat st. lighting to comply with cec 150(k). | $6,000 | |
| Apr 3, 2012 | Completed final sign-off Nov 2013 | 235 Laussat St | new foundation on three sides of building & below existing middle girder and add retaining concrete wall support for existing brick retaining wall at basement front wall.Details
new foundation on three sides of building & below existing middle girder and add retaining concrete wall support for existing brick retaining wall at basement front wall. | $20,000 | |
| Mar 21, 2012 | Completed final sign-off Jun 2013 | 235 Laussat St | removal of less than 60% of interior, walls (plaster), floor, ceiling & replace with new plywood & sheetrock. work in living room, hallway, nook, dining room.Details
removal of less than 60% of interior, walls (plaster), floor, ceiling & replace with new plywood & sheetrock. work in living room, hallway, nook, dining room. | $2,000 | |
| Jan 10, 2012 | Expired or cancelled cancelled Jan 2026 | 235 Laussat St | voluntary add (n) joist to (e) floor joist at first floor nailed with 2 rows of 12d @ 12"o.c., joist will be full bearing on (e) walls & (e) beams, total 7 joists at each side of beam near front of building. no damaged to (e) joists. otherwise plans are required.Details
voluntary add (n) joist to (e) floor joist at first floor nailed with 2 rows of 12d @ 12"o.c., joist will be full bearing on (e) walls & (e) beams, total 7 joists at each side of beam near front of building. no damaged to (e) joists. otherwise plans are required. | $1,000 | |
| Nov 28, 2011 | Never finaled issued Nov 2011, no final | 237 Laussat St | street spaceDetails
street space | ||
| Sep 16, 2011 | Completed final sign-off Aug 2015 | 235 Laussat St | replace current deck & replace siding on building back side. sunroom addition at basement & 1st floor.Details
replace current deck & replace siding on building back side. sunroom addition at basement & 1st floor. | $20,000 | |
| Jul 7, 2009 | Completed final sign-off Aug 2009 | 237 Laussat St | Mr. Roofing, Inc. | reroofingDetails
reroofing | $15,000 |
| Apr 23, 2009 | Completed final sign-off Feb 2011 | 235 Laussat St | remove kitchen on top floor & basement, new kitchen & bathroom. make 3rd floor bathroom up to code. removal of fireplace on 2nd & 3rd floors (remove 2 illegal units to clear nov)Details
remove kitchen on top floor & basement, new kitchen & bathroom. make 3rd floor bathroom up to code. removal of fireplace on 2nd & 3rd floors (remove 2 illegal units to clear nov) | $30,000 | |
| Mar 19, 2009 | Completed final sign-off Feb 2011 | 237 Laussat St | soft demolition removing cement plaster and floor replace floor with new floor removal of less than 65% of interior walls voluntary seismic strengthings approx 800 sq. ft. of wall areaDetails
soft demolition removing cement plaster and floor replace floor with new floor removal of less than 65% of interior walls voluntary seismic strengthings approx 800 sq. ft. of wall area | $12,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Celebrity Tile, Mr. Roofing, Inc.
- Engineers
- Albert Urrutia, Donald David
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.