Block 0665, lot 010
1628 Bush St
- City’s use
- Multi-Family Residential
- Built
- 1911
- Stories
- 3
- Units
- 7
- Rooms
- 7 bathrooms
- Building
- 3,596 sq ft
- Lot
- 1,500 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 16, 2026 | In progress issued Jun 2026 | 1628 Bush St | Bz And Bz Corporation Inc | unit# 2: like to like remodel of the kitchen.Details
unit# 2: like to like remodel of the kitchen. | $15,000 |
| Mar 3, 2023 | Completed final sign-off Nov 2023 | 1628 Bush St | unit 3: replace (6) rear windows inkind, aluminum or vinyl. uf<0.3Details
unit 3: replace (6) rear windows inkind, aluminum or vinyl. uf<0.3 | $3,000 | |
| Dec 5, 2022 | Completed final sign-off Nov 2023 | 1628 Bush St | unit 3 - 2nd flr: repair sheetrock, tiles, floor, & plywood. provide 5/8" gp-x @ all walls of living room, kitchen, bedroom & ceiling of l.r. & kitchen. tile back splash of kitchen counter. install vinyl plank flooring @ kitchen. plywood exterior walls of bed r., living r., & kitchen (from interior)Details
unit 3 - 2nd flr: repair sheetrock, tiles, floor, & plywood. provide 5/8" gp-x @ all walls of living room, kitchen, bedroom & ceiling of l.r. & kitchen. tile back splash of kitchen counter. install vinyl plank flooring @ kitchen. plywood exterior walls of bed r., living r., & kitchen (from interior) | $6,000 | |
| Sep 14, 2018 | Completed final sign-off Jan 2022 | 1628 Bush St | Allied Teamwork Construction Co | seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit per 2015 cebc appendix a4 commercialDetails
seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit per 2015 cebc appendix a4 commercial | $60,000 |
| Sep 14, 2018 | Completed final sign-off Jan 2022 | 1628 Bush St | Allied Teamwork Construction Co | seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit per 2015 cebc appendix a4 commercialDetails
seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit per 2015 cebc appendix a4 commercial | $20,000 |
| Jul 26, 2012 | Never finaled issued Jul 2012, no final | 1628 Bush St | street spaceDetails
street space | ||
| Dec 23, 2002 | Expired or cancelled expired Mar 2004 | 1628 Bush St | Sai Ping Cheung | re sheet rock entire apt#7. kitchen remodel under separate permit approx 400 sq ft.Details
re sheet rock entire apt#7. kitchen remodel under separate permit approx 400 sq ft. | $3,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Allied Teamwork Construction Co (2), Bz And Bz Corporation Inc, Sai Ping Cheung
- Engineers
- Darren Wong (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.