Block 0624, lot 003B
1930 Sacramento St
- City’s use
- Multi-Family Residential
- Built
- 1924
- Stories
- 4
- Units
- 18
- Rooms
- 18 bathrooms
- Building
- 19,668 sq ft
- Lot
- 6,891 sq ft
- Zoning
- RM3
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
24 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 18, 2023 | Completed final sign-off Jun 2023 | 1930 Sacramento St | Sure, Inc. | #6: (1) 80 sqft kitchen and (1) 30 sqft bathroom remodeling in kind. no change to existing layout. no window changing. new led fixtures throughout the unit.Details
#6: (1) 80 sqft kitchen and (1) 30 sqft bathroom remodeling in kind. no change to existing layout. no window changing. new led fixtures throughout the unit. | $39,000 |
| Nov 7, 2022 | Completed final sign-off Mar 2023 | 1930 Sacramento St | Sure, Inc. | unit 5:(1) 80sqft kitchen and (1) 30sqft bathroom remodeling/ no change to the existing layout no window changing. new led fixtures throughout the unit.Details
unit 5:(1) 80sqft kitchen and (1) 30sqft bathroom remodeling/ no change to the existing layout no window changing. new led fixtures throughout the unit. | $33,000 |
| Nov 4, 2021 | Completed final sign-off Jun 2022 | 1930 Sacramento St | Crime Watch Security Sys Llc | upgrade extg fire alarm system to comply with sffc section 1103.7.6.1Details
upgrade extg fire alarm system to comply with sffc section 1103.7.6.1 | $30,000 |
| Jun 21, 2021 | Completed final sign-off Sep 2021 | 1930 Sacramento St | Sure, Inc. | unit #15: one bathroom renovation. no structural workDetails
unit #15: one bathroom renovation. no structural work | $23,000 |
| Mar 17, 2021 | Completed final sign-off Jun 2021 | 1930 Sacramento St | Sure, Inc. | unit #9:bathroom remodel with shower pan. no wall moving.Details
unit #9:bathroom remodel with shower pan. no wall moving. | $36,000 |
| Mar 17, 2021 | Completed final sign-off Jun 2021 | 1930 Sacramento St | unit #14:kitchen and bathroom remodel with shower pan. no wall moving.Details
unit #14:kitchen and bathroom remodel with shower pan. no wall moving. | $20,000 | |
| Mar 11, 2020 | Completed final sign-off Jul 2020 | 1930 Sacramento St | Sure, Inc. | unit #3 - kitchen & bath remodeling, approx 10'x8' & 5'x7'. remodel iun kind. comply w/cec 150.0(k)3.Details
unit #3 - kitchen & bath remodeling, approx 10'x8' & 5'x7'. remodel iun kind. comply w/cec 150.0(k)3. | $35,000 |
| Mar 15, 2019 | Completed final sign-off May 2019 | 1930 Sacramento St | Sure, Inc. | unit 17: kitchen and bathroom remodeling. kitchen: approx. 10' x 8' bathroom: 5' x 7'Details
unit 17: kitchen and bathroom remodeling. kitchen: approx. 10' x 8' bathroom: 5' x 7' | $35,000 |
| Oct 9, 2018 | Completed final sign-off Dec 2018 | 1930 Sacramento St | unit 18. kitchen and bath remodel. maher n/aDetails
unit 18. kitchen and bath remodel. maher n/a | $35,000 | |
| Sep 24, 2018 | Completed final sign-off Dec 2018 | 1930 Sacramento St | Sure, Inc. | remodel kitchen and bathroom. approx 8x10 for kitchen and 5x7 for bathroom.Details
remodel kitchen and bathroom. approx 8x10 for kitchen and 5x7 for bathroom. | $35,000 |
| May 16, 2018 | Completed final sign-off Aug 2018 | 1930 Sacramento St | Sure, Inc. | unit #2: interior remodel of extg studio . work to include the renovation of the extg kitchen and creation of a new bedroom. no structural work is required. n/a for maher.Details
unit #2: interior remodel of extg studio . work to include the renovation of the extg kitchen and creation of a new bedroom. no structural work is required. n/a for maher. | $15,000 |
| Dec 15, 2016 | Completed final sign-off Feb 2017 | 1930 Sacramento St | Sure, Inc. | #10- remodel bathroomDetails
#10- remodel bathroom | $12,000 |
| Jun 20, 2016 | Completed final sign-off Aug 2016 | 1930 Sacramento St | Sure, Inc. | unit 8: bathroom remodeling - no walls moved, removed, added or infilled. all existing layouts to remain unchanged.Details
unit 8: bathroom remodeling - no walls moved, removed, added or infilled. all existing layouts to remain unchanged. | $10,000 |
| Mar 14, 2016 | Completed final sign-off May 2016 | 1930 Sacramento St | Sure, Inc. | unit#16 one kitchen & one bath remodel. n/a for maher.Details
unit#16 one kitchen & one bath remodel. n/a for maher. | $25,000 |
| Feb 12, 2016 | Completed final sign-off May 2016 | 1930 Sacramento St | Sure, Inc. | unit #1: kitchen renovation. bedroom addition, bathroom renovation. n/a for maherDetails
unit #1: kitchen renovation. bedroom addition, bathroom renovation. n/a for maher | $10,000 |
| Jun 23, 2015 | Completed final sign-off Sep 2015 | 1930 Sacramento St | Sure, Inc. | unit 12: kitchen & bathroom remodel: shall maintain all fire rated assemblies. replace showr pan. no wals moved, removed, infill or added. replace bath tiles. all existing layouts to remain unchanged. replace kitchen countertops & cabinets. replace vanites.Details
unit 12: kitchen & bathroom remodel: shall maintain all fire rated assemblies. replace showr pan. no wals moved, removed, infill or added. replace bath tiles. all existing layouts to remain unchanged. replace kitchen countertops & cabinets. replace vanites. | $18,000 |
| Apr 29, 2014 | Never finaled issued Apr 2014, no final | 1930 Sacramento St | street space permit | ||
| Feb 19, 2013 | Never finaled issued Feb 2013, no final | 1930 Sacramento St | street space | ||
| Feb 1, 2012 | Completed final sign-off May 2012 | 1930 Sacramento St | Qse Construction | voluntary rear yard seismic safety retaining wall per cbc to be placed in rear against (e) 7' high u.r.m brick retaining wall for a 29' long & 8' highDetails
voluntary rear yard seismic safety retaining wall per cbc to be placed in rear against (e) 7' high u.r.m brick retaining wall for a 29' long & 8' high | $25,000 |
| Aug 10, 2011 | Completed final sign-off Nov 2011 | 1930 Sacramento St | Sure, Inc. | unit #9-replace kitchen cabinets & countertops & appliances, sink. replace bath tub, replace tiles. replace vanity & medicine cabinet. no structural work. all new lighting must comply with cec 150(k)Details
unit #9-replace kitchen cabinets & countertops & appliances, sink. replace bath tub, replace tiles. replace vanity & medicine cabinet. no structural work. all new lighting must comply with cec 150(k) | $18,500 |
| Feb 14, 2011 | Completed final sign-off May 2011 | 1930 Sacramento St | A B C Window Contractors | #5,6,9,10,14,15,18,19- install 40 anderson fibrex series 100 windows. all fire escape windows will be single hungs that slide up from the bottom because swing out casements would hit the railings and block the escape path of the residents. all windows do face the street.Details
#5,6,9,10,14,15,18,19- install 40 anderson fibrex series 100 windows. all fire escape windows will be single hungs that slide up from the bottom because swing out casements would hit the railings and block the escape path of the residents. all windows do face the street. | $24,975 |
| Dec 23, 2010 | Completed final sign-off Jan 2011 | 1930 Sacramento St | A B C Window Contractors | #19- install 3 vinyl windows in kind into existing frames. no change in size or location. windows do not face the street. if applicable, bedroom windows will comply with section cbc 1026 for rescue. all windows will be double pane and have a u-factor of .30Details
#19- install 3 vinyl windows in kind into existing frames. no change in size or location. windows do not face the street. if applicable, bedroom windows will comply with section cbc 1026 for rescue. all windows will be double pane and have a u-factor of .30 | $1,465 |
| Sep 21, 2010 | Completed final sign-off Dec 2010 | 1930 Sacramento St | Sure, Inc. | unit#19: replace kit. cabinets & appliances. replace bathtub & faucet. replace vanity & faucet. replace toilet.Details
unit#19: replace kit. cabinets & appliances. replace bathtub & faucet. replace vanity & faucet. replace toilet. | $22,000 |
| Nov 10, 2008 | Completed final sign-off Jan 2009 | 1930 Sacramento St | West Coast Property Mgnt Co | to repair sagging floor on ground level w/new footing & girder.Details
to repair sagging floor on ground level w/new footing & girder. | $15,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Sure, Inc. (15), A B C Window Contractors (2), Crime Watch Security Sys Llc, Qse Construction, West Coast Property Mgnt Co
- Engineers
- Lawrence Liao, Thomas Lutge
- Authorized agents
- Siu Man
- Designers
- Anthony Pantaleoni
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.