Block 0478, lot 001B
2855 Polk St
10 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 24, 2025 | Completed | 2855 Polk St | Sure, Inc. | #302: convert existing studio unit to one bedroom unit. no structural work. no exterior work. | $15,000 |
| Apr 11, 2025 | Completed | 2855 Polk St | Sure, Inc. | replace concrete slab. add new butteress wall behind existing rear wall. | $30,000 |
| Jan 27, 2025 | Completed | 2855 Polk St | Sure, Inc. | unit #103: (1) kitchen 80sf (1) 40sf bathroom remodel. no change to layout. update wiring in the unit & new sub-panel in the unit. new led light fixtures throughout the unit. | $58,000 |
| Dec 26, 2024 | Completed | 2855 Polk St | Sure, Inc. | unit 104: 1 kitchen (80 sf) & 1 bathroom (40 sf) remodel. no change to layout, update wiring in uint & new sub panel. new led light fixtures thru out unit | $40,000 |
| Aug 23, 2024 | Completed | 2855 Polk St | Sure, Inc. | dry rot repair and spot stucco repair at the side of the building. and match finish texture. approx 200 sf total. | $5,000 |
| Jun 26, 2023 | Completed | 2855 Polk St | Byington Electric Corp | mandatory f/a upgrade to comply w/ca state fire marshal code #12-001 (7/23/2012) bulletin (9/9/2008) replace f/a panel, add horns in units & wireless radio communicator | $10,000 |
| Nov 4, 2020 | Completed | 2855 Polk St | Mdr Construction | install two new dryers with electrical connection. two washing with sewer line,buildt a ramp for machines, install a door on side of the house. | $7,000 |
| Aug 26, 2016 | Completed | 2855 Polk St | soft story retrofit per sfbc 34b engineering criteria 2012 iebc appendix a-4 | $85,000 | |
| Sep 7, 2007 | Never finaled | 2855 Polk St | sidewalk repair | ||
| Dec 13, 2001 | Completed | 2855 Polk St | Gutierrez Roofing Co. | reroofing | $9,900 |