Block 0248, lot 023
1463 Sacramento St
- City’s use
- Multi-Family Residential
- Built
- 1912
- Stories
- 3
- Units
- 6
- Rooms
- 6 bathrooms
- Building
- 5,283 sq ft
- Lot
- 2,748 sq ft
- Zoning
- RM3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 30, 2025 | In progress issued May 2025 | 1463 Sacramento St | Tom Lee Roofing Inc. | tearoff existing roof to wood sheathing using modified bitumen membrane roofing system along with an approved sa base sheet. less than 2/12 pitch. (no torch no hot work).Details
tearoff existing roof to wood sheathing using modified bitumen membrane roofing system along with an approved sa base sheet. less than 2/12 pitch. (no torch no hot work). | $28,400 |
| Oct 29, 2024 | In progress issued Oct 2024 | 1463 Sacramento St | Poly-On Security System Inc. | upgrade the (e) fire alarm system by replacing it with (1) address able fire alarm unit (1) wireless communicator next to facu (5) addressable manual pull station (5) addressable smoke detector (4) led horn strobes (21) low freq. horn to comply with sffc sec. 1103.7.6.1Details
upgrade the (e) fire alarm system by replacing it with (1) address able fire alarm unit (1) wireless communicator next to facu (5) addressable manual pull station (5) addressable smoke detector (4) led horn strobes (21) low freq. horn to comply with sffc sec. 1103.7.6.1 | $20,000 |
| May 14, 2019 | Completed final sign-off Nov 2019 | 1463 Sacramento St | Sincere Construction Company Inc | rev pa 201708235711; 1st fl. relocate steel moment frame, revised footing and shear wallsDetails
rev pa 201708235711; 1st fl. relocate steel moment frame, revised footing and shear walls | |
| Aug 23, 2017 | Completed final sign-off Nov 2019 | 1463 Sacramento St | Sincere Construction Company Inc | seismic retrofit of soft story comply with sfebc chapter 4d, mandatory retrofit per 2016 cebc appendix a-4. n/a maher ordinanceDetails
seismic retrofit of soft story comply with sfebc chapter 4d, mandatory retrofit per 2016 cebc appendix a-4. n/a maher ordinance | $90,000 |
| Aug 4, 2010 | Never finaled issued Aug 2010, no final | 1463 Sacramento St | street space permitDetails
street space permit |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Sincere Construction Company Inc (2), Poly-On Security System Inc., Tom Lee Roofing Inc.
- Engineers
- Darren Wong, Darren Wong
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.