Block 0226, lot 047
721 Clay St
- City’s use
- Commercial Hotel
- Built
- 1912
- Stories
- 3
- Units
- 4
- Rooms
- 2 bathrooms
- Building
- 4,650 sq ft
- Lot
- 1,947 sq ft
- Zoning
- CCB
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 26, 2025 | Completed final sign-off Jan 2026 | 721 Clay St | Crime Watch Security Sys Llc | as built change log. replace plan 202509256141 per inspector comments. removed sprinkler tamper to reflect details on site no change to any office.Details
as built change log. replace plan 202509256141 per inspector comments. removed sprinkler tamper to reflect details on site no change to any office. | |
| Sep 25, 2025 | Completed final sign-off Jan 2026 | 721 Clay St | Crime Watch Security Sys Llc | upgrade existing fire alarm system to comply with sffc section 1103.7.6.1 to meet 75db in all sleeping areas.Details
upgrade existing fire alarm system to comply with sffc section 1103.7.6.1 to meet 75db in all sleeping areas. | $15,800 |
| May 26, 2016 | Never finaled issued Jun 2016, no final | 713 Clay St | beer and wine sale at existing restaurant, per conditional use #2015005078 cua, no construction work; maher n/aDetails
beer and wine sale at existing restaurant, per conditional use #2015005078 cua, no construction work; maher n/a | ||
| Sep 3, 2015 | Never finaled issued Feb 2016, no final | 713 Clay St | Discount Signs & Neon Inc | relocate (1) existing electric projecting sign to new location. n/a maher ordinanceDetails
relocate (1) existing electric projecting sign to new location. n/a maher ordinance | $2,000 |
| Jul 23, 2015 | Completed final sign-off Oct 2015 | 713 Clay St | Taico Builder Inc | revision & addition to pa #2015.0512.6030: new dumbwaiter between 1st floor & basement, new footing for hoistway. n/a maher ordinanceDetails
revision & addition to pa #2015.0512.6030: new dumbwaiter between 1st floor & basement, new footing for hoistway. n/a maher ordinance | $40,000 |
| May 12, 2015 | Completed final sign-off Oct 2015 | 713 Clay St | new open kitchen, new accessible path of travel & restroom, tenant improvements, mech. supply & exhaust. n/a ordinance #155-13.Details
new open kitchen, new accessible path of travel & restroom, tenant improvements, mech. supply & exhaust. n/a ordinance #155-13. | $35,000 | |
| May 12, 2014 | Completed final sign-off Jun 2014 | 719 Clay St | J L M Construction Inc. | install grab bars - 2 bars in shower stalls, 4 bars at toilets, correct his nov. #201459941 date 3/20/2014. compliance with ordinance no. 155-13 not required.Details
install grab bars - 2 bars in shower stalls, 4 bars at toilets, correct his nov. #201459941 date 3/20/2014. compliance with ordinance no. 155-13 not required. | $480 |
| Apr 23, 2013 | Completed final sign-off May 2013 | 721 Clay St | Abc Roofing Inc | reroofingDetails
reroofing | $10,500 |
| Jul 15, 2011 | Never finaled issued Jul 2011, no final | 721 Clay St | street spaceDetails
street space | ||
| May 7, 2002 | Expired or cancelled expired Sep 2002 | 713 Clay St | sidewalk repair.Details
sidewalk repair. | ||
| Apr 22, 2002 | Expired or cancelled expired Aug 2002 | 719 Clay St | streetspaceDetails
streetspace | ||
| Oct 2, 2000 | Expired or cancelled expired Apr 2001 | 713 Clay St | install 2 vinyl windows in existing openingsDetails
install 2 vinyl windows in existing openings | $8,440 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Crime Watch Security Sys Llc (2), Abc Roofing Inc, Discount Signs & Neon Inc, J L M Construction Inc., Taico Builder Inc
- Architects
- Samuel Kwong (2)
- Engineers
- Matthew Wang
- Designers
- Yin Kai Tong Di-Fun Tsang Tong (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.