Block 0055, lot 016
1855 Kearny St
- City’s use
- Multi-Family Residential
- Built
- 1983
- Stories
- 7
- Units
- 136
- Rooms
- 136 bathrooms
- Building
- 111,150 sq ft
- Lot
- 50,050 sq ft
- Zoning
- C2
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
27 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 29, 2025 | Completed final sign-off Feb 2025 | 1855 Kearny St | Saarman Construction,Ltd. | to obtain final inspection for work approved under pa # 2020-0110-1690. all work is complete.Details
to obtain final inspection for work approved under pa # 2020-0110-1690. all work is complete. | $50,000 |
| Nov 8, 2024 | Completed final sign-off Jul 2025 | 1855 Kearny St | Everest Waterproofing & Restoration Inc. | replacing guard rails along perimeter of parapet.Details
replacing guard rails along perimeter of parapet. | $38,000 |
| Apr 25, 2022 | Completed final sign-off Jun 2023 | 155 Francisco St | Pyro-Comm Systems, Inc. | addition to the (e) fa system. new notif. appliances will be added to provide proper coverage for area of work. all new notif. appliances will be connected to the (e) remote power supply. appliances will be activated on general alarm condition. 1 remote power supply, 1 voice comm, 1 annuciator, ...Details
addition to the (e) fa system. new notif. appliances will be added to provide proper coverage for area of work. all new notif. appliances will be connected to the (e) remote power supply. appliances will be activated on general alarm condition. 1 remote power supply, 1 voice comm, 1 annuciator, ... | $78,000 |
| Apr 25, 2022 | Completed final sign-off Jun 2023 | 1855 Kearny St | Pyro-Comm Systems, Inc. | addition to the (e) fire alarm system. new notification appliances will be added to provide proper coverage; all new notification appliances will be connected to the existing remote power supply. these appliances will be activated on general alarm condition.. (compliance with 1103.7.6.1)Details
addition to the (e) fire alarm system. new notification appliances will be added to provide proper coverage; all new notification appliances will be connected to the existing remote power supply. these appliances will be activated on general alarm condition.. (compliance with 1103.7.6.1) | $142,000 |
| May 25, 2021 | Completed final sign-off Jul 2021 | 1855 Kearny St | Enterprise Roofing Service Inc | re-roofing.Details
re-roofing. | $200,000 |
| May 25, 2021 | Completed final sign-off Jul 2021 | 155 Francisco St | Enterprise Roofing Service Inc | re-roofing.Details
re-roofing. | $200,000 |
| Mar 29, 2021 | Never finaled issued May 2021, no final | 155 Francisco St | Pyro-Comm Systems, Inc. | modify existing fire alarm system, elevator modernization, relay modules are being added for designated. alternate an ecs to an existing elevator replace existing smoke detectors.Details
modify existing fire alarm system, elevator modernization, relay modules are being added for designated. alternate an ecs to an existing elevator replace existing smoke detectors. | |
| Jan 10, 2020 | Never finaled issued Jan 2020, no final | 1855 Kearny St | Saarman Construction,Ltd. | notice violation #202009001 temporary secure building for waterproofing and security repair front window and sliding glass doorDetails
notice violation #202009001 temporary secure building for waterproofing and security repair front window and sliding glass door | $50,000 |
| Oct 21, 2019 | Never finaled issued Oct 2019, no final | 155 Francisco St | street spaceDetails
street space | ||
| Jun 4, 2019 | Never finaled issued Jun 2019, no final | 155 Francisco St | street spaceDetails
street space | ||
| Feb 27, 2019 | Never finaled issued Feb 2019, no final | 1855 Kearny St | street spaceDetails
street space | ||
| Dec 21, 2018 | Never finaled issued Dec 2018, no final | 1855 Kearny St | street spaceDetails
street space | ||
| Dec 21, 2018 | Completed final sign-off May 2020 | 155 Francisco St | Saarman Construction,Ltd. | replace 63 aluminun windows and 21 sliding glass doors in kind. perform deck repairs and waterproofing at 21 decks. replace deck railings and roof parapet railings in kind. replace exterior stucco claddingDetails
replace 63 aluminun windows and 21 sliding glass doors in kind. perform deck repairs and waterproofing at 21 decks. replace deck railings and roof parapet railings in kind. replace exterior stucco cladding | $1,880,528 |
| Dec 14, 2018 | Never finaled issued Dec 2018, no final | 1855 Kearny St | street spaceDetails
street space | ||
| Oct 19, 2018 | Never finaled issued Oct 2018, no final | 1855 Kearny St | street spaceDetails
street space | ||
| Aug 13, 2018 | Never finaled issued Aug 2018, no final | 155 Francisco St | Saarman Construction,Ltd. | performing dt on stucco cladding to investigate existing conditions of water proofing system. stucco cladding to be repaired in kind. rear and side facades. approx. 3000 sq ft. non visible from streetDetails
performing dt on stucco cladding to investigate existing conditions of water proofing system. stucco cladding to be repaired in kind. rear and side facades. approx. 3000 sq ft. non visible from street | $68,880 |
| Aug 10, 2018 | Never finaled issued Aug 2018, no final | 1855 Kearny St | Saarman Construction,Ltd. | at north east and south facades, remove 7 decorative non load-bearing projected beams located over fourth floor balconies, with associated repairs.Details
at north east and south facades, remove 7 decorative non load-bearing projected beams located over fourth floor balconies, with associated repairs. | $87,827 |
| Jun 21, 2018 | Completed final sign-off Jul 2019 | 1855 Kearny St | Saarman Construction,Ltd. | install balcony railings, install traffic coating on balconys at both 1855 kearny street & 155 francisco st. per plans. balcony & railing repairs wharf plaza 2 155 francisco st & 1855 kearny stDetails
install balcony railings, install traffic coating on balconys at both 1855 kearny street & 155 francisco st. per plans. balcony & railing repairs wharf plaza 2 155 francisco st & 1855 kearny st | $713,490 |
| Apr 13, 2018 | Never finaled issued Apr 2018, no final | 155 Francisco St | Saarman Construction,Ltd. | performing demo stucco to investigate existing conditions of water proofing system. stucco to be repaired with in kind. (10) locations 2'x2'Details
performing demo stucco to investigate existing conditions of water proofing system. stucco to be repaired with in kind. (10) locations 2'x2' | $3,000 |
| Dec 1, 2017 | Completed final sign-off Jan 2018 | 155 Francisco St | Saarman Construction,Ltd. | remove and replace wood beam and stucco cladding with in kind repairs.Details
remove and replace wood beam and stucco cladding with in kind repairs. | $16,000 |
| Sep 14, 2017 | Never finaled issued Sep 2017, no final | 155 Francisco St | Saarman Construction,Ltd. | perform inspection stucco openings @ 1-2 locations to check existing waterproofing perform in-kind repairs (200 sf max).Details
perform inspection stucco openings @ 1-2 locations to check existing waterproofing perform in-kind repairs (200 sf max). | $3,200 |
| Aug 29, 2016 | Completed final sign-off Aug 2017 | 1855 Kearny St | Pyro-Comm Systems, Inc. | fire alarm system replacement excluding 24vdc bells 1 facp, 14 pull stations, 1 water flow, 1 duct detector, 24 smoke detectorsDetails
fire alarm system replacement excluding 24vdc bells 1 facp, 14 pull stations, 1 water flow, 1 duct detector, 24 smoke detectors | $10,000 |
| May 20, 2011 | Never finaled issued May 2011, no final | 1855 Kearny St | street space permitDetails
street space permit | ||
| May 6, 2011 | Completed final sign-off Aug 2011 | 1855 Kearny St | Build Group Inc. | waterproofing repair on existing wall (retaining wall) approx 75 linear feet, 250 sq ft along western wall at the rear of the building.Details
waterproofing repair on existing wall (retaining wall) approx 75 linear feet, 250 sq ft along western wall at the rear of the building. | $10,000 |
| Mar 30, 2010 | Never finaled issued Mar 2010, no final | 1855 Kearny St | street space permitDetails
street space permit | ||
| Sep 6, 2002 | Never finaled issued Sep 2002, no final | 1855 Kearny St | street space permitDetails
street space permit | ||
| Sep 6, 2002 | Completed final sign-off Oct 2002 | 1855 Kearny St | State Roofing Systems Inc | reroofingDetails
reroofing | $40,443 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Saarman Construction,Ltd. (9), Pyro-Comm Systems, Inc. (4), Enterprise Roofing Service Inc (2), Build Group Inc., Everest Waterproofing & Restoration Inc., State Roofing Systems Inc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.