Zhuren Lawrence Liao
- Listed as
- engineer
- Based in
- Fremont
- On San Francisco permits
- Oct 2021 to Jan 2026
10 permits since 2000 (engineer on 10 permits): 3 completed, 5 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 30, 2026 | Completed final sign-off Sep 2026 | 1775 37th Av | Chl Construction Company | 1st fl: add 1 bedroom, 1 full bath, and playroom. 2nd fl: remodel kitchen and bath. add 1 full bath. add new deck at rear. infill lightwell.Details
1st fl: add 1 bedroom, 1 full bath, and playroom. 2nd fl: remodel kitchen and bath. add 1 full bath. add new deck at rear. infill lightwell. | $140,000 |
| Nov 7, 2025 | In progress issued Sep 2026 | 2469 18th Av | Jin's Construction Inc | 3-story horizontal addition: 1/f add family, media room, 2 bedrooms and 2 baths and new patio at rear; 2/f remodel kitchen, add 1 full bath, laundry, pantry and deck at rear; 3/f add full bath, roof deck at rear; reconfigure interior stairs, replacment windows w/aluminium clad wood.Details
3-story horizontal addition: 1/f add family, media room, 2 bedrooms and 2 baths and new patio at rear; 2/f remodel kitchen, add 1 full bath, laundry, pantry and deck at rear; 3/f add full bath, roof deck at rear; reconfigure interior stairs, replacment windows w/aluminium clad wood. | $400,000 |
| Aug 28, 2025 | In progress issued Jan 2026 | 150 Westgate Dr | Jin's Construction Inc | 1st fl: add 1 home office, 1 full bath, family, and utility. 2nd fl: remodel kitchen and 1/2 bath. 3rd fl: remodel bath and add 1 full bath. replace interior stair.Details
1st fl: add 1 home office, 1 full bath, family, and utility. 2nd fl: remodel kitchen and 1/2 bath. 3rd fl: remodel bath and add 1 full bath. replace interior stair. | $98,000 |
| Aug 15, 2025 | In progress issued Apr 2026 | 1632 Grove St | Apex General Builder Inc | 1/f:remodel (e) space to habitable new int stair to 2/f.full remodel of (e) on all floors.new 2-story rear addition 1/f & 2/f cantilever deck on 2/f.new roof deck on 3/f. new dormers on (e) room. replace (e) brick foundation with new concrete foundation.Details
1/f:remodel (e) space to habitable new int stair to 2/f.full remodel of (e) on all floors.new 2-story rear addition 1/f & 2/f cantilever deck on 2/f.new roof deck on 3/f. new dormers on (e) room. replace (e) brick foundation with new concrete foundation. | $1,564,000 |
| Aug 11, 2025 | Completed final sign-off Aug 2026 | 678 23rd Av | Yiu Cheong Construction Co Inc | revision to pa# 202503031449- show (e) adjacent neighbor's foundation @ new foundation details 7/s3.3. special inspections required and per pa 202503031449Details
revision to pa# 202503031449- show (e) adjacent neighbor's foundation @ new foundation details 7/s3.3. special inspections required and per pa 202503031449 | |
| May 30, 2025 | In progress issued Feb 2026 | 2219 44th Av | Teocalli Builders Llc | 1/f: add additional floor and deck at rear, remodel interior; 2/f: add additional floor and cantilever deck at rear, remodel interior; add veritical new 3/f and roof decks with roof hatch.Details
1/f: add additional floor and deck at rear, remodel interior; 2/f: add additional floor and cantilever deck at rear, remodel interior; add veritical new 3/f and roof decks with roof hatch. | $350,000 |
| Jun 13, 2024 | Expired or cancelled expired Jan 2026 | 1015 Diamond St | Mdc Drilling | revision to: 2023-1214-2521: eliminate on sheetrock wall from previously proposed. relpace garage's foundation. infill window at rear elevation.Details
revision to: 2023-1214-2521: eliminate on sheetrock wall from previously proposed. relpace garage's foundation. infill window at rear elevation. | $5,000 |
| Mar 31, 2022 | Completed final sign-off Dec 2023 | 41 Girard St | Brothers Lui Inc. | addition of second unit at lower level. replace deck at rear of upper floor with acces to yard.Details
addition of second unit at lower level. replace deck at rear of upper floor with acces to yard. | $80,000 |
| Nov 2, 2021 | In progress issued Jul 2025 | 815 Greenwich St | Bay C T Construction Inc. | add new unit per ca state adu law. new unit included bedroom, bathroom, and kitchen at the first floor.Details
add new unit per ca state adu law. new unit included bedroom, bathroom, and kitchen at the first floor. | $40,000 |
| Oct 5, 2021 | Expired or cancelled withdrawn Sep 2024 | 242 24th Av | 1st floor: add adu per ordinance 95-17.Details
1st floor: add adu per ordinance 95-17. | $80,000 |