Xiaorui Lin
- License
- C37936
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Feb 2025 to Nov 2026
4 permits since 2000 (architect on 4 permits): 2 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Green Bay Remodeling Inc. (3)
- Engineers
- Marcus Yan (2)
Where they worked
- Single-family 4
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 9, 2026 | In progress filed Nov 2026, not yet issued | 417 32nd Av | adding approximately 267sf new garage to the existing single family house at the front yard. reduced the width of the (e) entrance stairs from 5ft down to 4ft. adding new drive way. adding new curb cut.Details
adding approximately 267sf new garage to the existing single family house at the front yard. reduced the width of the (e) entrance stairs from 5ft down to 4ft. adding new drive way. adding new curb cut. | $30,000 | |
| Oct 23, 2025 | In progress issued Oct 2025 | 100 San Marcos Av | Green Bay Remodeling Inc. | whole house remodel including 1 bath on floor 1, 2 baths, on floor 2. remodel kitchen including lights, outlets, switches, plumbing. replace front windows with custom wood windows while preserving or replicateing trim of slightlly larger size. ref 202112144437. walls demoed and added.Details
whole house remodel including 1 bath on floor 1, 2 baths, on floor 2. remodel kitchen including lights, outlets, switches, plumbing. replace front windows with custom wood windows while preserving or replicateing trim of slightlly larger size. ref 202112144437. walls demoed and added. | $150,000 |
| Mar 13, 2025 | Completed final sign-off Jul 2025 | 450 Naples St | Green Bay Remodeling Inc. | kitchen remodel: relocate kitchen and new electrical and plumbing at 1st level. no added square footage.Details
kitchen remodel: relocate kitchen and new electrical and plumbing at 1st level. no added square footage. | $212,000 |
| Feb 4, 2025 | Completed final sign-off Mar 2026 | 475 03rd Av | Green Bay Remodeling Inc. | kitchen remodel, convert (e) bath 1 to pantry, split the (e) living room into bath, 1 (n) bedroom 1 convert (e) storage and powder room into (n) master bath (n) lighting fixure per planDetails
kitchen remodel, convert (e) bath 1 to pantry, split the (e) living room into bath, 1 (n) bedroom 1 convert (e) storage and powder room into (n) master bath (n) lighting fixure per plan | $198,941 |