Winfrei Tai
- License
- 45338
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Building Technology
- Based in
- San Carlos
- On San Francisco permits
- Nov 2007 to Nov 2007
2 permits since 2000 (engineer on 2 permits): 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Pacific Circle Construction Inc., Pinnacle Remodeling Construction, Tommy K Woo
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 0
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 29, 2007 | Expired or cancelled expired Dec 2009 | 131 Prentiss St | Pacific Circle Construction Inc. | structural improvements including shear walls and hold downs with calcs. also, minor upgrade to mechanical system, with title 24 calcs.Details
structural improvements including shear walls and hold downs with calcs. also, minor upgrade to mechanical system, with title 24 calcs. | $140,000 |
| Nov 9, 2007 | Expired or cancelled expired Jan 2011 | 709 Larkin St | Tommy K Woo, Pinnacle Remodeling Construction | t.i to add refrigerators, counters, plumging work for 3-tub sink rest room, electrical for equipment change of use.Details
t.i to add refrigerators, counters, plumging work for 3-tub sink rest room, electrical for equipment change of use. | $35,000 |