William Tucker
- License
- 26071
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Wm Tucker Associates
- Based in
- San Rafael
- On San Francisco permits
- Jun 2010 to Jul 2023
9 permits since 2000 (engineer on 9 permits): 8 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Thompson Builders Corp (5), Bbc Construction Inc., Hillside Drilling Inc., Valentine Corporation
- Pmt consultant/expediters
- Levi Sanchez
Where they worked
- Single-family 4
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 3
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in. 1 of 9 have no building type on record and are shown as other.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 26, 2023 | Expired or cancelled expired Mar 2025 | 2529 Union St | Bbc Construction Inc. | temporary support of excavation for pa# 202212017493.Details
temporary support of excavation for pa# 202212017493. | $10,000 |
| Feb 4, 2021 | Completed final sign-off Apr 2021 | 50 Hiliritas Av | Valentine Corporation | foundation stabilize/post pierDetails
foundation stabilize/post pier | $20,000 |
| May 2, 2018 | Completed final sign-off Mar 2021 | 825 Minnesota St | Thompson Builders Corp | underpinning for new construction ref pa# 2017/12/01/5291-s. ** maher: n/a **Details
underpinning for new construction ref pa# 2017/12/01/5291-s. ** maher: n/a ** | $75,000 |
| May 2, 2018 | Completed final sign-off Jan 2021 | 950 Tennessee St | Thompson Builders Corp | temporary shoring & tiebacks to allow for new construction ref pa# 2017/12/01/5291-s. ** maher: n/a **Details
temporary shoring & tiebacks to allow for new construction ref pa# 2017/12/01/5291-s. ** maher: n/a ** | $380,000 |
| May 2, 2018 | Completed final sign-off Jan 2021 | 950 Tennessee St | Thompson Builders Corp | excavation. temporary excavation shoring for new constructio. ref pa# 2017/12/01/5291-s. ** maher: n/a **Details
excavation. temporary excavation shoring for new constructio. ref pa# 2017/12/01/5291-s. ** maher: n/a ** | $200,000 |
| May 2, 2018 | Completed final sign-off Mar 2021 | 801 Minnesota St | Thompson Builders Corp | underpinning for new construction ref pa# 2017/12/01/5291-s. ** maher: n/a **Details
underpinning for new construction ref pa# 2017/12/01/5291-s. ** maher: n/a ** | $75,000 |
| Mar 31, 2014 | Completed final sign-off Nov 2015 | 72 Townsend St | Thompson Builders Corp | install permanent slant pile underpinning, lagging, support angle and reinforcing to existing building prior to excavation of structural footings for adjacent building. n/a ordinance #155-13.Details
install permanent slant pile underpinning, lagging, support angle and reinforcing to existing building prior to excavation of structural footings for adjacent building. n/a ordinance #155-13. | $50,000 |
| Dec 15, 2011 | Completed final sign-off May 2012 | 4515 20th St | Hillside Drilling Inc. | comply with nov 201111561. repair of failed retaining wall. placing concrete to strengthen exisiting retaining wallDetails
comply with nov 201111561. repair of failed retaining wall. placing concrete to strengthen exisiting retaining wall | $144,000 |
| Jun 28, 2010 | Completed final sign-off Jun 2011 | 937 Alabama St | replace & upgrade existing foundation and upgrade shear walls. partial seismic strengthening.Details
replace & upgrade existing foundation and upgrade shear walls. partial seismic strengthening. | $23,000 |