William Lim
- Listed as
- architect, authorized agent-others
- Firm
- William Lim Architect
- Based in
- San Francisco
- On San Francisco permits
- Apr 2003 to Jul 2021
20 permits since 2000 (architect on 19 permits, authorized agent-others on 2 permits): 16 completed, 1 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 8, 2021 | Completed final sign-off Aug 2021 | 1241 Evans Av | Build Group Inc. | tenant improvement add three gender neutral restrmooms, demolish one partial height partition and one restrooom (no exterior work)Details
tenant improvement add three gender neutral restrmooms, demolish one partial height partition and one restrooom (no exterior work) | $130,000 |
| Oct 25, 2019 | Completed final sign-off Jan 2020 | 1241 Evans Av | J M L Builders | remove 2 non-load bearing partitions, connect electrical lighting to (e) main switchDetails
remove 2 non-load bearing partitions, connect electrical lighting to (e) main switch | $7,000 |
| Apr 11, 2019 | In progress issued Jun 2024 | 457 02nd Av | two story addition to the rear of the bldg. reduce rear yard to 45% with a 12'extension for two stories & 5'setbacks. convert to 2 units, remodel each fl, replace windows (dual glazed aluminum). add 1 bedroomDetails
two story addition to the rear of the bldg. reduce rear yard to 45% with a 12'extension for two stories & 5'setbacks. convert to 2 units, remodel each fl, replace windows (dual glazed aluminum). add 1 bedroom | $307,700 | |
| Apr 5, 2019 | Expired or cancelled cancelled Jan 2026 | 512 Clement St | complying w/ 51-16 ordinance; change entry into commercial stores to meet accessible business entrance programDetails
complying w/ 51-16 ordinance; change entry into commercial stores to meet accessible business entrance program | $20,000 | |
| Aug 11, 2016 | Expired or cancelled expired Feb 2025 | 525 42nd Av | add unit in first level. remodel area behind garage from storage/off-street parking to living unit. remove concrete slab to lower slab. new bathroom and kitchen, living room and bedroom, change windows and add interior spiral stair for upper unit to access usable open space area in rear yard.Details
add unit in first level. remodel area behind garage from storage/off-street parking to living unit. remove concrete slab to lower slab. new bathroom and kitchen, living room and bedroom, change windows and add interior spiral stair for upper unit to access usable open space area in rear yard. | $65,000 | |
| Jan 27, 2016 | Completed final sign-off Nov 2016 | 190 Collins St | Kwong Associates | no work. document 4 units, not 5. existing full bath and wet bar in garage storage. maher not reqDetails
no work. document 4 units, not 5. existing full bath and wet bar in garage storage. maher not req | |
| Jun 11, 2015 | Completed final sign-off Aug 2016 | 68 Sanchez St | Build Group Inc. | remove one column in garage, install a transfer beam to support existing center beams, and foundation work per plan.Details
remove one column in garage, install a transfer beam to support existing center beams, and foundation work per plan. | $22,000 |
| Aug 1, 2014 | Expired or cancelled withdrawn Oct 2016 | 88 Le Conte Cr | remodel ground floor, build out rear of ground floor to a multi-unit room/studio with bathroom & 2nd unit. all work is within (e) building envelope.Details
remodel ground floor, build out rear of ground floor to a multi-unit room/studio with bathroom & 2nd unit. all work is within (e) building envelope. | $42,000 | |
| Jun 21, 2013 | Completed final sign-off Dec 2013 | 201 Juanita Wy | Kwong Associates | build dormer window in roof, build bathroom in existing room, install solar tube skylight, remove & replace chimney & shoulders.Details
build dormer window in roof, build bathroom in existing room, install solar tube skylight, remove & replace chimney & shoulders. | $49,000 |
| Sep 7, 2012 | Completed final sign-off May 2013 | 1241 Evans Av | Jin Qing Construction Co. | change swing gate to sliding gate and documentation of non-compliant ada access. revision to pa# 201205049788Details
change swing gate to sliding gate and documentation of non-compliant ada access. revision to pa# 201205049788 | $1,000 |
| Jul 18, 2012 | Completed final sign-off Sep 2012 | 1241 Evans Av | Air Perfection Heating & Air Condition | replace 4 qty rooftop(packaged) air conditional heating unit. modify / replace the ducting (interior).Details
replace 4 qty rooftop(packaged) air conditional heating unit. modify / replace the ducting (interior). | $60,000 |
| May 4, 2012 | Completed final sign-off May 2013 | 1241 Evans Av | Jin Qing Construction Co. | demolish of partitions & finishes. t.i. construct partitoins & finishes for offices & assembly space. new break room w/oven, interior work only, ecisting mech & lighting, relocate existing registers & light fixtures.Details
demolish of partitions & finishes. t.i. construct partitoins & finishes for offices & assembly space. new break room w/oven, interior work only, ecisting mech & lighting, relocate existing registers & light fixtures. | $130,000 |
| May 1, 2009 | Completed final sign-off Sep 2010 | 323 Amber Dr | replace windows & install gas fireplace insert.Details
replace windows & install gas fireplace insert. | $12,000 | |
| Apr 24, 2009 | Completed final sign-off Aug 2009 | 2921 21st Av | Kwong Associates | add downstairs, 1 office, 1 bathroom, tv room, wet bar. also, demolition of concrete slab to meet sf code requirements. add windows at property line and rear of building.Details
add downstairs, 1 office, 1 bathroom, tv room, wet bar. also, demolition of concrete slab to meet sf code requirements. add windows at property line and rear of building. | $70,000 |
| Jul 9, 2007 | Completed final sign-off May 2009 | 1843 16th Av | addition of a garage (19'-8" x 12'-0") to the rear of the house with a wood deck. this is non heated space. 05/06/08:comverted to full permit w/submission of r3. gjsDetails
addition of a garage (19'-8" x 12'-0") to the rear of the house with a wood deck. this is non heated space. 05/06/08:comverted to full permit w/submission of r3. gjs | $23,000 | |
| Jun 22, 2007 | Completed final sign-off Oct 2007 | 70 Sanchez St | kitchen remodel; relocation of cabinets, moving sink & dishwasher, sealing 2 doorways, opening 2 new doorways, adding eletrical outlets, change window opening at kitchen.Details
kitchen remodel; relocation of cabinets, moving sink & dishwasher, sealing 2 doorways, opening 2 new doorways, adding eletrical outlets, change window opening at kitchen. | $20,000 | |
| Jun 9, 2005 | Completed final sign-off Apr 2008 | 1363 08th Av | Jack Chen Construction | demo rear porch, horz rear addition of family room. remodel kitchen.Details
demo rear porch, horz rear addition of family room. remodel kitchen. | $120,000 |
| Nov 18, 2004 | Completed final sign-off May 2005 | 68 Sanchez St | remodel kitchen. removing non-bearing partitions.Details
remodel kitchen. removing non-bearing partitions. | $20,000 | |
| Aug 23, 2004 | Completed final sign-off Jul 2007 | 570 41st Av | erect a 3 story 2 unit residential bldg.Details
erect a 3 story 2 unit residential bldg. | $665,250 | |
| Apr 7, 2003 | Completed final sign-off Aug 2003 | 457 02nd Av | install stair way chari lift model b.07, by "services industriels savaria inc, or equal, at frontDetails
install stair way chari lift model b.07, by "services industriels savaria inc, or equal, at front | $4,700 |