Werner Frisly De Leon Gramajo
- Listed as
- contractor, designer
- Firm
- Werner's General Contractor Inc
- Based in
- Novato
- On San Francisco permits
- Jun 2022 to May 2026
10 permits since 2000 (contractor on 10 permits, designer on 1 permit): 8 completed, 1 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 29, 2026 | In progress issued May 2026 | 180 Noe St | Werner's General Contractor Inc | new bath remodel, new laundry closet, kitchen remodel, new dining room (change of location only) existing bearing wall shortening with new structural beam to resupport joists. plumbing and electrical work as required for the remodel. work on 2nd floor only (excluding new foundation pad).Details
new bath remodel, new laundry closet, kitchen remodel, new dining room (change of location only) existing bearing wall shortening with new structural beam to resupport joists. plumbing and electrical work as required for the remodel. work on 2nd floor only (excluding new foundation pad). | $65,000 |
| Nov 3, 2025 | Completed final sign-off Feb 2026 | 1568 Union St | Werner's General Contractor Inc | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $19,420 |
| Apr 23, 2025 | Completed final sign-off Dec 2025 | 1609 Irving St | Werner's General Contractor Inc | g/f commercial - relcoate water heater from bathroom to garage. remove wall from bathroom to closet, wall off storage area from gallery. add door from storage area to bathroom. remove door from closet to hallway. add ceiling light and switch on storage area. add 4 electrical outlets on storage area.Details
g/f commercial - relcoate water heater from bathroom to garage. remove wall from bathroom to closet, wall off storage area from gallery. add door from storage area to bathroom. remove door from closet to hallway. add ceiling light and switch on storage area. add 4 electrical outlets on storage area. | $8,000 |
| Aug 5, 2024 | Completed final sign-off Apr 2025 | 2915 Franklin St | Werner's General Contractor Inc, Caruzo's Roofing Company | remove and replace existing siding wood to comply # 20242-4880 #1 and #2Details
remove and replace existing siding wood to comply # 20242-4880 #1 and #2 | $20,000 |
| Jun 13, 2024 | Completed final sign-off Jul 2024 | 1609 Irving St | Werner's General Contractor Inc | address change from 1609 irving st to 1609+1611 irving st. ref permit #202405313428Details
address change from 1609 irving st to 1609+1611 irving st. ref permit #202405313428 | |
| May 31, 2024 | Completed final sign-off Jul 2024 | 1609 Irving St | Werner's General Contractor Inc | replace existing washer and dryer with new in existing laundrry room located on the 2nd floor of the residential dwelling unit.no new wall and no existing wall relocation.Details
replace existing washer and dryer with new in existing laundrry room located on the 2nd floor of the residential dwelling unit.no new wall and no existing wall relocation. | $7,200 |
| May 28, 2024 | Completed final sign-off Jul 2024 | 1609 Irving St | Werner's General Contractor Inc | replace 5 windows & 1 door on the back of house, replace in-kind, all in existing openings.Details
replace 5 windows & 1 door on the back of house, replace in-kind, all in existing openings. | $10,000 |
| Oct 25, 2022 | Completed final sign-off Jan 2024 | 351 Louisburg St | Werner's General Contractor Inc | add (1) adu at the 3/f - unit 351b (761 sf) & (1) junior adu located at the 1/f - unit 351a (500 sf), resulting in a change of occupancy. both within (e) building envelope of single family structure per ca state government code sect. 65852.2 & sect. 65852.22 to comply w/ complait #201937931.Details
add (1) adu at the 3/f - unit 351b (761 sf) & (1) junior adu located at the 1/f - unit 351a (500 sf), resulting in a change of occupancy. both within (e) building envelope of single family structure per ca state government code sect. 65852.2 & sect. 65852.22 to comply w/ complait #201937931. | $25,000 |
| Jul 21, 2022 | Completed final sign-off Dec 2022 | 1318 Larkin St | Werner's General Contractor Inc | remodel batrhoom remove shower,move tub. laundry remodel.Details
remodel batrhoom remove shower,move tub. laundry remodel. | $100,000 |
| Jun 6, 2022 | Never finaled issued Jun 2022, no final | 1261 Grove St | Werner's General Contractor Inc | unit #3: one bathroom remodel in kind.Details
unit #3: one bathroom remodel in kind. | $10,000 |