Wanxin Huang
- License
- C89976
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C89976 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Jun 2021 to Feb 2022
2 permits since 2000 (engineer on 2 permits): 1 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Mastec Network Solutions Inc, Ravig Inc Dba Salient Global Technologi
- Engineers
- James R. Spore, Robert A. Kitsteiner
- Authorized agents
- Joseph Negrete
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 1
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 14, 2022 | Completed final sign-off Mar 2024 | 171 02nd St | Ravig Inc Dba Salient Global Technologi | verizon wireless site modification removing & replacing 6(e) antennas w/6(n) antennas; retaining 2(e0 antennas; removing & replacing 2(e) 24" radomes w/2(n) radomes; removing & replacing 3(e) rrus-32 b2 units w/3(n) radio 8843 units @ antennas; installing 3(n) radio 8863 units @antennas.Details
verizon wireless site modification removing & replacing 6(e) antennas w/6(n) antennas; retaining 2(e0 antennas; removing & replacing 2(e) 24" radomes w/2(n) radomes; removing & replacing 3(e) rrus-32 b2 units w/3(n) radio 8843 units @ antennas; installing 3(n) radio 8863 units @antennas. | $40,000 |
| Jun 28, 2021 | Never finaled issued Jan 2022, no final | 1399 43rd Av | Mastec Network Solutions Inc | t-mobile remove of replace 3 antennas w/3 (n) antenna mounted behind (n) frp enclosure. add 6 radios, add 6 diplexeus; add 2 (n) cabinets; add bb unit, upgrade 100 amp panel to 200 ampDetails
t-mobile remove of replace 3 antennas w/3 (n) antenna mounted behind (n) frp enclosure. add 6 radios, add 6 diplexeus; add 2 (n) cabinets; add bb unit, upgrade 100 amp panel to 200 amp | $25,000 |