Permit GraphShortlistSan Francisco building permits since 2000

Vicent Tu-Hung Wu

License
C43749
Look the license up with the state
Listed as
engineer
Firm
Baseline Design Inc
Based in
Alameda
On San Francisco permits
Jun 2016 to Dec 2018

3 permits since 2000 (engineer on 3 permits): 2 completed, 1 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Dec 18, 2018Completed
final sign-off Jul 2019
441 Ellis StD.F.P.F Corp Dba Fine Line Constructionprovide repair to the balcony repair over the main entrance to a 6 story multi story nit residential bldg
Details
Permit
201812188665
Status
complete
Filed
Dec 18, 2018
Permit issued
Mar 29, 2019
Final sign-off
Jul 12, 2019
Declared cost
$10,000
Address
441 Ellis St

provide repair to the balcony repair over the main entrance to a 6 story multi story nit residential bldg

Open the permit page

$10,000
Feb 27, 2017Never finaled
issued Mar 2017, no final
256 Juanita WyThe Great Ocean General Contractorreplace (e) deteriorated dry rotten stairs with a new in-kind wooden stairs of brick exterior stair design
Details
Permit
201702270152
Status
issued
Filed
Feb 27, 2017
Permit issued
Mar 1, 2017
Declared cost
$6,000
Address
256 Juanita Wy

replace (e) deteriorated dry rotten stairs with a new in-kind wooden stairs of brick exterior stair design

Open the permit page

$6,000
Jun 3, 2016Completed
final sign-off Jun 2017
256 Juanita WyThe Great Ocean General Contractorrepair termite, wood beetle and dryrot structural damage, repair foundation, reinforce (e) structure, replace/upgrade electrical wiring, improve 2 (e) bathrooms, install new egress windows in 4 (e) bedrooms, new windows throughout, permimeter installation, improve drainage.
Details
Permit
201606039064
Status
complete
Filed
Jun 3, 2016
Permit issued
Oct 3, 2016
Final sign-off
Jun 13, 2017
Declared cost
$130,000
Address
256 Juanita Wy

repair termite, wood beetle and dryrot structural damage, repair foundation, reinforce (e) structure, replace/upgrade electrical wiring, improve 2 (e) bathrooms, install new egress windows in 4 (e) bedrooms, new windows throughout, permimeter installation, improve drainage.

Open the permit page

$130,000