Venkata Grandhi
- Listed as
- architect, engineer
- Firm
- Venkata Roht Grandhi
- Based in
- Highland
- On San Francisco permits
- Mar 2021 to Apr 2026
9 permits since 2000 (engineer on 8 permits, architect on 1 permit): 8 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 13, 2026 | Completed final sign-off Aug 2026 | 4179 26th St | Armour Construction | revision 202508062456- deferred roof truss calculationsDetails
revision 202508062456- deferred roof truss calculations | |
| Dec 28, 2025 | In progress issued Jul 2026 | 2140 Lake St | Endora Builders | convert 848 sf to adu: 1bed/1bth, replace windows in-kind,enlarge bedroom windows, (e) kitchen remodel, remodel (e) bath, add 2nd bath & laundry. add subpanel, plumbing,hvac. 202510227916 under sep permit for work on levels 2 & 3.Details
convert 848 sf to adu: 1bed/1bth, replace windows in-kind,enlarge bedroom windows, (e) kitchen remodel, remodel (e) bath, add 2nd bath & laundry. add subpanel, plumbing,hvac. 202510227916 under sep permit for work on levels 2 & 3. | $250,000 |
| Aug 26, 2025 | Completed final sign-off Aug 2026 | 4179 26th St | Armour Construction | to erect 1 story, no basement, type v-b, detached adu. 02 sep '25 - travels with p/a: 2025-0815-3192. efm.Details
to erect 1 story, no basement, type v-b, detached adu. 02 sep '25 - travels with p/a: 2025-0815-3192. efm. | $150,000 |
| Aug 26, 2025 | Completed final sign-off Aug 2026 | 4179 26th St | Armour Construction | new exit passageway through the (e) home in front for new rear yard adu. may share the same drawing of adu pa# 202508062456.Details
new exit passageway through the (e) home in front for new rear yard adu. may share the same drawing of adu pa# 202508062456. | $15,000 |
| Jul 1, 2025 | Completed final sign-off Aug 2026 | 1270 South Van Ness Av | roof deck rebuild over (e) bedroom. replcae walls in (e) bedrooms w/ new 2x4 sheetrock/insulation after demo to hold the deck. new joist & flooring in (e) bedroom.Details
roof deck rebuild over (e) bedroom. replcae walls in (e) bedrooms w/ new 2x4 sheetrock/insulation after demo to hold the deck. new joist & flooring in (e) bedroom. | $8,700 | |
| Jun 20, 2025 | Completed final sign-off Jan 2026 | 56 Garcia Av | Sh Painting And Construction Inc | renovate lower level of single family home. convert non-habitable storage space to livable space.Details
renovate lower level of single family home. convert non-habitable storage space to livable space. | $15,000 |
| Jun 26, 2024 | Completed final sign-off Dec 2024 | 471 Yerba Buena Av | Lopez Cruz Corp/Dba Frisco Plumbing | enlarge (e) main bathroom to connect to primary bedroom and rework closets, revamp (2) existing closets and create new hall bath, turn (e) powder room into closetDetails
enlarge (e) main bathroom to connect to primary bedroom and rework closets, revamp (2) existing closets and create new hall bath, turn (e) powder room into closet | $48,600 |
| May 8, 2023 | Completed final sign-off Apr 2025 | 261 Texas St | Beyond The Horizon Construction | add spiral stairs to 2/f deck, connect to landing area of (e) 1/f deck landing areaDetails
add spiral stairs to 2/f deck, connect to landing area of (e) 1/f deck landing area | $15,000 |
| Mar 4, 2021 | Completed final sign-off Jun 2021 | 736 Valencia St | Blackline Construction | #502:add retractable awning to 5th floor patio.Details
#502:add retractable awning to 5th floor patio. | $10,000 |